Waste Encapsulation and Storage Facility Basis for Interim Operation and Interim Operational Safety Requirements Westinghouse Hanford Company (WHC) Functional Review Report

Download Waste Encapsulation and Storage Facility Basis for Interim Operation and Interim Operational Safety Requirements Westinghouse Hanford Company (WHC) Functional Review Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 209 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Waste Encapsulation and Storage Facility Basis for Interim Operation and Interim Operational Safety Requirements Westinghouse Hanford Company (WHC) Functional Review Report by :

Download or read book Waste Encapsulation and Storage Facility Basis for Interim Operation and Interim Operational Safety Requirements Westinghouse Hanford Company (WHC) Functional Review Report written by and published by . This book was released on 1996 with total page 209 pages. Available in PDF, EPUB and Kindle. Book excerpt: The document contains the comments provided by WHC reviewers on the WESF BIO and IOSRS.

Waste Encapsulation and Storage Facility Interim Operational Safety Requirements

Download Waste Encapsulation and Storage Facility Interim Operational Safety Requirements PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Waste Encapsulation and Storage Facility Interim Operational Safety Requirements by :

Download or read book Waste Encapsulation and Storage Facility Interim Operational Safety Requirements written by and published by . This book was released on 2000 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Interim Operational Safety Requirements (IOSRs) for the Waste Encapsulation and Storage Facility (WESF) define acceptable conditions, safe boundaries, bases thereof, and management or administrative controls required to ensure safe operation during receipt and inspection of cesium and strontium capsules from private irradiators; decontamination of the capsules and equipment; surveillance of the stored capsules; and maintenance activities. Controls required for public safety, significant defense-in-depth, significant worker safety, and for maintaining radiological consequences below risk evaluation guidelines (EGs) are included.

Energy Research Abstracts

Download Energy Research Abstracts PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 444 pages
Book Rating : 4.0/5 ( download)

DOWNLOAD NOW!


Book Synopsis Energy Research Abstracts by :

Download or read book Energy Research Abstracts written by and published by . This book was released on 1994 with total page 444 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Central Waste Complex Interim Operational Safety Requirements

Download Central Waste Complex Interim Operational Safety Requirements PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 35 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Central Waste Complex Interim Operational Safety Requirements by :

Download or read book Central Waste Complex Interim Operational Safety Requirements written by and published by . This book was released on 1997 with total page 35 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Interim Operational Safety Requirements document supports the authorization basis for interim operations and identifies restrictions on interim operations for the disposal and storage of solid waste in the Central Waste Complex. The Central Waste Complex Interim Operational Safety Requirements provide the necessary controls on operations in the Central Waste Complex to ensure the radiological and hazardous material exposure will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, 1327 the public and the environment.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1168 pages
Book Rating : 4.:/5 (31 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1995 with total page 1168 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Waste Encapsulation and Storage Facility Mission Analysis Report

Download Waste Encapsulation and Storage Facility Mission Analysis Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Waste Encapsulation and Storage Facility Mission Analysis Report by :

Download or read book Waste Encapsulation and Storage Facility Mission Analysis Report written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Criteria Document for WESF Authorization Basis Upgrade

Download Criteria Document for WESF Authorization Basis Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 8 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Criteria Document for WESF Authorization Basis Upgrade by :

Download or read book Criteria Document for WESF Authorization Basis Upgrade written by and published by . This book was released on 2001 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Criteria Document, prepared to the requirements in HNF-PRO-705 Safety Basis Planning, Documentation, Review and Approval, describes the criteria used for the FY 2001 upgrade of the Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO) and Interim Operational Safety Requirements (IOSRs). WESF will continue to safely store and manage the existing cesium and strontium inventory until final disposition in 2017.

Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis

Download Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 112 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis by :

Download or read book Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis written by and published by . This book was released on 1995 with total page 112 pages. Available in PDF, EPUB and Kindle. Book excerpt: The TRUSAF ISB is based upon current facility configuration and procedures. The purpose of the document is to provide the basis for interim operation or restrictions on interim operations and the authorization basis for the TRUSAF at the Hanford Site. The previous safety analysis document TRUSAF hazards Identification and Evaluation (WHC 1977) is superseded by this document.

Transuranic Storage and Assay Facility Interim Safety Basis

Download Transuranic Storage and Assay Facility Interim Safety Basis PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 155 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Transuranic Storage and Assay Facility Interim Safety Basis by :

Download or read book Transuranic Storage and Assay Facility Interim Safety Basis written by and published by . This book was released on 1997 with total page 155 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Transuranic Waste Storage and Assay Facility (TRUSAF) Interim Safety Basis document provides the authorization basis for the interim operation and restriction on interim operations for the TRUSAF. The TRUSAF ISB demonstrates that the TRUSAF can be operated safely, protecting the workers, the public, and the environment. The previous safety analysis document TRUSAF Hazards Identification and Evaluation (WHC 1987) is superseded by this document.

Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

Download Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 18 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan by :

Download or read book Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan written by and published by . This book was released on 2000 with total page 18 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

בפיתולי הדרך

Download בפיתולי הדרך PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (233 download)

DOWNLOAD NOW!


Book Synopsis בפיתולי הדרך by :

Download or read book בפיתולי הדרך written by and published by . This book was released on 1983 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO).

Download Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO). PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 345 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO). by :

Download or read book Waste Encapsulation and Storage Facility (WESF) Basis for Interim Operation (BIO). written by and published by . This book was released on 2000 with total page 345 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Waste Encapsulation and Storage Facility (WESF) is located in the 200 East Area adjacent to B Plant on the Hanford Site north of Richland, Washington. The current WESF mission is to receive and store the cesium and strontium capsules that were manufactured at WESF in a safe manner and in compliance with all applicable rules and regulations. The scope of WESF operations is currently limited to receipt, inspection, decontamination, storage, and surveillance of capsules in addition to facility maintenance activities. The capsules are expected to be stored at WESF until the year 2017, at which time they will have been transferred for ultimate disposition. The WESF facility was designed and constructed to process, encapsulate, and store the extracted long-lived radionuclides, 9°Sr and 137Cs, from wastes generated during the chemical processing of defense fuel on the Hanford Site thus ensuring isolation of hazardous radioisotopes from the environment. The construction of WESF started in 1971 and was completed in 1973. Some of the 137Cs capsules were leased by private irradiators or transferred to other programs. All leased capsules have been returned to WESF. Capsules transferred to other programs will not be returned except for the seven powder and pellet Type W overpacks already stored at WESF.

Central Waste Complex Interim Safety Basis

Download Central Waste Complex Interim Safety Basis PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Central Waste Complex Interim Safety Basis by :

Download or read book Central Waste Complex Interim Safety Basis written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This Interim Safety Basis document provides the authorization basis for interim operations and restrictions on interim operations for the disposal and storage of solid waste in the Central Waste Complex. The Central Waste Complex Interim Safety Basis demonstrates that the Central Waste Complex can be operated safely, protecting the workers, the public and the environment, based on safety analysis and supporting documentation.

Westinghouse Hanford Company Safety Analysis Reports and Technical Safety Requirements Upgrade Program

Download Westinghouse Hanford Company Safety Analysis Reports and Technical Safety Requirements Upgrade Program PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Westinghouse Hanford Company Safety Analysis Reports and Technical Safety Requirements Upgrade Program by :

Download or read book Westinghouse Hanford Company Safety Analysis Reports and Technical Safety Requirements Upgrade Program written by and published by . This book was released on 1995 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ''Unreviewed Safety Questions, '' DOE 5480.22, ''Technical Safety Requirements, '' and DOE 5480.23, ''Nuclear Safety Analysis Reports.'' WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ''Safety Basis'' for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules.

Supplemental Design Requirements Document, Project W026. Revision 3

Download Supplemental Design Requirements Document, Project W026. Revision 3 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Supplemental Design Requirements Document, Project W026. Revision 3 by :

Download or read book Supplemental Design Requirements Document, Project W026. Revision 3 written by and published by . This book was released on 1993 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document supplements and extends the Functional Design Criteria, SP-W026-FDC-001, for the Waste Receiving and Processing Facility (WRAP), Module 1. It provides additional detailed requirements, summarizes key Westinghouse Hanford Company design guidance, and establishes baseline technical agreements to be used in definitive design of the WRAP-1 facility. Revision 3 of the Supplemental Design Requirements Document has been assigned an Impact Level of 3ESQ based on the content of the entire revision. The actual changes made from Revision 2 have an Impact Level of 3S and the basis for these changes was previously reviewed and approved per WHC correspondence No. 9355770.

Documentation of Hanford Site Independent Review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3

Download Documentation of Hanford Site Independent Review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 298 pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Documentation of Hanford Site Independent Review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3 by :

Download or read book Documentation of Hanford Site Independent Review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3 written by and published by . This book was released on 1993 with total page 298 pages. Available in PDF, EPUB and Kindle. Book excerpt: Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals.

Hanford Generic Interim Safety Basis

Download Hanford Generic Interim Safety Basis PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 392 pages
Book Rating : 4.:/5 (682 download)

DOWNLOAD NOW!


Book Synopsis Hanford Generic Interim Safety Basis by :

Download or read book Hanford Generic Interim Safety Basis written by and published by . This book was released on 1994 with total page 392 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this document is to identify WHC programs and requirements that are an integral part of the authorization basis for nuclear facilities that are generic to all WHC-managed facilities. The purpose of these programs is to implement the DOE Orders, as WHC becomes contractually obligated to implement them. The Hanford Generic ISB focuses on the institutional controls and safety requirements identified in DOE Order 5480.23, Nuclear Safety Analysis Reports.