National Program for Inspection of Non-Federal Dams. Reservoir Number 2 (MA 00338), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Reservoir Number 2 (MA 00338), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Reservoir Number 2 (MA 00338), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Reservoir Number 2 (MA 00338), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: Reservoir No. 2 Dam, also known as Brackett Reservoir Dam, is an earth embankment structure located in the south central portion of Framingham, Mass. The dam has a masonry core and is 1340 feet long, with a structural height of 26.5 ft.; the hydraulic height is 20.7 ft. The dam is considered to be in fair condition. It is classified as intermediate in size with a high hazard potential. It is recommended that the owner engage a qualified engineer to investigate the erosion next to the spillway.

National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 85 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: Total length of the dam is about 800 ft. with a height of about 22 ft. Although there were some minor deficiencies noted the dam is considered to be in good condition. It is intermediate in size with a hazard potential of high.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 530 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985-08 with total page 530 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Foss Reservoir Dam (MA 00339), Merrimack River Basin, Framingham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Foss Reservoir Dam is a 1640 foot earthfill dam with a maximum height of 29 feet. Although the dam is in good condition, the spillway will not pass the peak test flood outflow without overtopping the dam. The dam has been classified in the intermediate size and high hazard categories. It is recommended that the owner employ a registered professional engineer to conduct a more detailed hydraulic and hydrological study.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1016 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Merrimack River Basin, Lawrence, Massachusetts, Lawrence Reservoir, MA 00743. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Merrimack River Basin, Lawrence, Massachusetts, Lawrence Reservoir, MA 00743. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 71 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Merrimack River Basin, Lawrence, Massachusetts, Lawrence Reservoir, MA 00743. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Merrimack River Basin, Lawrence, Massachusetts, Lawrence Reservoir, MA 00743. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 71 pages. Available in PDF, EPUB and Kindle. Book excerpt: The 410 ft. by 700 ft., stone lined reservoir which is located near the top of Tower Hill is almost entirely surrounded by an earthfill embankment. The embankment is 1870 ft. long and has a maximum height of 29 ft. There are deficiencies which must be corrected to assure the continued performance of the reservoir and embankment. Generally, both are in good condition.

National Program for Inspection of Non-Federal Dams. Scott Reservoir MA 00871, Merrimack River Basin, Fitchburg, Massachusetts. Phase Inspection Report

Download National Program for Inspection of Non-Federal Dams. Scott Reservoir MA 00871, Merrimack River Basin, Fitchburg, Massachusetts. Phase Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 121 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Scott Reservoir MA 00871, Merrimack River Basin, Fitchburg, Massachusetts. Phase Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Scott Reservoir MA 00871, Merrimack River Basin, Fitchburg, Massachusetts. Phase Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 121 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of a 705 foot long, 49 foot high, earth fill embankment, and a 31 foot wide stone spillway. The spillway has a capacity of 195 and 380 cfs with and without flashboards, which is 27 and 57 percent of the 1/2 PMF outflow, respectively. The remaining outflow overtops the spillway training walls and adjacent Ashby West Road. The top of the dam, elevation 889, is not overtopped. This dam is in generally fair condition. It is recommended that the owner engage a registered professional engineer to investigate downstream seepage conditions, to further evaluate the adequacy of the spillway, and to recommend a method of removing and properly backfilling trees stumps on the downstream face of the dam. Furthermore, the owner should institute certain remedial measures including permanent removal of spillway flashboards; repair of erosion at the upstream slopes near the gatehouse; repair of gatehouse masonry; backfilling of animal holes; maintenance of proper growth on the downstream slopes; removal of small trees, brush and debris within the spillway channel; monitoring of differential settlement within the floor of the spillway channel; and periodic testing of all intake and outlet gates to insure they are in working order.

National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of a 1,300 foot long, 49.5 foot high earth fill embankment having a concrete core wall. The reservoir is a pump storage facility, having no inlet stream or spillway. Between the design high water level, elevation 144, and the top of dam, elevation 147.5, there is 221 acre-feet of available storage. This capacity is sufficient to store all the runoff, 203 acre-feet, from the drainage area. There will be no test flood outflow. The dam will not be overtopped. The following remedial measures should be instituted by the Owner: grass and brush on the dam should be cut and maintained; animal burrows should be filled-in and prevented from reoccuring; trespassing on the dam should be prevented; a formal warning system for the downstream impact area should be developed and the dam should be inspected once every year by a qualified registered professional engineer.

National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 81 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pleasant Street Dam consists of an approximately 93 ft. long stone masonry spillway with a brick building at each abutment. The spillway itself is approximately 15 ft. high and probably founded on bedrock. There is a 4 ft. square low-level gated outlet through the spillway structure and stoplogged conduit outlets through the building at the right abutment. The overall condition of Pleasant Street Dam can only be considered fair, primarily because the spillway of the dam was obscured by heavily flowing water and the operation of the low-level outlet was not demonstrated. However, visible portions of the dam are generally in good condition, and the dam is performing adequately. There was no evidence of settlement, lateral movement or other signs of structural failure, or other conditions which would warrant urgent remedial action. With the water level 3.8 ft. above the spillway crest, corresponding to the estimated top of dam level, the spillway capacity is approximately 2,500 cfs, which is 12 percent of the test flood outflow.

National Program for Inspection of Non-Federal Dams. Fort Meadow Reservoir Dam (MA 00449), Merrimack River Basin, Marlborough, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Fort Meadow Reservoir Dam (MA 00449), Merrimack River Basin, Marlborough, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 81 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Fort Meadow Reservoir Dam (MA 00449), Merrimack River Basin, Marlborough, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Fort Meadow Reservoir Dam (MA 00449), Merrimack River Basin, Marlborough, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: There are two impounding structures at Fort Meadow Reservoir--an earthfill dam and an earth dike adjacent to a spillway with a concrete weir. The dam is about 320 ft. long and 30 ft. high. The dike is about 80 ft. wide and 3.5 ft. high, and the spillway is 13.3 ft. long. The dam is considered to be in generally poor condition. It also has a high hazard potential level.

National Program for Inspection of Non-Federal Dams. Lester G. Ross Dam (MA 01229) Merrimack River Basin, Berlin, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lester G. Ross Dam (MA 01229) Merrimack River Basin, Berlin, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lester G. Ross Dam (MA 01229) Merrimack River Basin, Berlin, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lester G. Ross Dam (MA 01229) Merrimack River Basin, Berlin, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: The embankment has a maximum height of 44 ft. and is 5500 ft. long. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in good condition. There are boulders lodged in the main spillway and in the channel downstream of the impact basin. It is intermediate in size with a hazard potential of high. (Author).

National Program for Inspection of Non-Federal Dams. Westminster Reservoir Dam (MA 00639) MA 00639, Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Westminster Reservoir Dam (MA 00639) MA 00639, Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 99 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Westminster Reservoir Dam (MA 00639) MA 00639, Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Westminster Reservoir Dam (MA 00639) MA 00639, Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 99 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 400 ft. long earth dam. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in fair condition. The dam has been classified as intermediate in size having a hazard potential of high. (Author).

National Program for Inspection of Non-Federal Dams. Quinapoxet Reservoir Dam (MA 00929), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Quinapoxet Reservoir Dam (MA 00929), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 72 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Quinapoxet Reservoir Dam (MA 00929), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Quinapoxet Reservoir Dam (MA 00929), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 72 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 1050 ft. long including the spillway and has a maximum height of about 45 ft. The facility is considered to be in good condition. Evidence of minor seepage was observed on the downstream slope of the dam adjacent to the left wall of the spillway discharge channel. The size is intermediate, and the hazard potential classification is high. (Author).

National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 120 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 120 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 101 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of an earth dike, about 250 ft. long on the left bank of the river, and a z-shaped stone masonry spillway about 212 ft. long. The dam itself is generally in good condition. There was no evidence of settlement, lateral movement or other signs of structural failure. It is small in size with a high hazard potential.

National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 144 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 144 pages. Available in PDF, EPUB and Kindle. Book excerpt: Overlook Reservoir Dam is a 370 foot long, 47 foot high, earth embankment structure with a masonry core wall and a stone masonry gatehouse. There is a separate 900 foot long, 25 foot high dike with an 10 foot long concrete channel spillway, located along the northern part of the reservoir. The visual inspection indicated the dam and dike to be in generally fair condition. Heavy vegetation, animal burrows, surficial sloughing and erosion were observed on the side slopes of the dam. Excessive tree growth and seepage was observed at the dike. Leakage into the valve chamber located upstream of the chlorination building was observed and the functionability of the control valves at the facility are questionable. The test flood outflow requires only 5 percent of the spillways capacity. Therefore, neither the dam or dike would be overtopped by the test flood.

National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 122 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Wampanoag Dam is approximately 660 feet long including the spillway and has a maximum height of approximately 22 feet. It consists of an earth embankment with riprap at the upstream face and a loamed and seeded crest and downstream face. Based on the size classification (intermediate) and hazard potential classification (high), the spillway test flood is the PMF.