Final Removal Action Site Closure Report

Download Final Removal Action Site Closure Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (829 download)

DOWNLOAD NOW!


Book Synopsis Final Removal Action Site Closure Report by : United States. Navy. Southwest Division Naval Facilities. Engineering Command

Download or read book Final Removal Action Site Closure Report written by United States. Navy. Southwest Division Naval Facilities. Engineering Command and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Draft Final Removal Action Site Closure Report

Download Draft Final Removal Action Site Closure Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (84 download)

DOWNLOAD NOW!


Book Synopsis Draft Final Removal Action Site Closure Report by : United States. Navy. Southwest Division Naval Facilities. Engineering Command

Download or read book Draft Final Removal Action Site Closure Report written by United States. Navy. Southwest Division Naval Facilities. Engineering Command and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452

Download Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452 by :

Download or read book Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452 written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 25-25-09, Spill H940825C (from UST 25-3101-1) 25-25-14, Spill H940314E (from UST 25-3102-3) 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454

Download Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 by :

Download or read book Addendum 2 to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: This page that refers the reader to the SIR document for additional information The cover, title, and signature pages of the SIR document The NDEP approval letter The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: 12-25-08, Spill H950524F (from UST 12-B-1) 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454

Download Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 by :

Download or read book Addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: This cover page that refers the reader to the UR Modification document for additional information The cover and signature pages of the UR Modification document The NDEP approval letter The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Partial Closure Report for the Area 514 Treatment and Storage Facility

Download Partial Closure Report for the Area 514 Treatment and Storage Facility PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 256 pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Partial Closure Report for the Area 514 Treatment and Storage Facility by : M. Abri

Download or read book Partial Closure Report for the Area 514 Treatment and Storage Facility written by M. Abri and published by . This book was released on 2005 with total page 256 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this partial closure report is to inform the Department of Toxic Substances Control (DTSC) of the status of final closure of the Area 514 Treatment and Storage Facility (Area 514) and fulfill the DTSC requirements to proceed with the implementation of the interim action. Area 514 is located at the Livermore main site of Lawrence Livermore National Laboratory (LLNL). LLNL is owned by the U.S. Department of Energy (DOE) and operated jointly by DOE and the University of California. LLNL received its permit to operate hazardous waste facilities from DTSC in 1997. The hazardous waste treatment and storage operations of Area 514 were transferred to a newly constructed complex, the Decontamination and Waste Treatment Facility (DWTF), in 2003. Once the DWTF was operational, the final closure of Area 514 began in accordance with the DTSC-approved closure plan in June 2004. Abri Environmental Engineering, Inc., was retained by LLNL to observe the A514 closure process and prepare this partial closure report and certification. Prior to closure, the configuration of the Area 514 Treatment and Storage Facility consisted of Building 514, the Area 514-1 Container Storage and Treatment unit, the Area 514-2 Container Storage Unit (CSU), the Area 514-3 CSU, Building 513, the Wastewater Treatment Tank Farm unit, and the associated Area 514 yard area. The fenced area of Area 514 included approximately 27,350 ft2 on the LLNL Livermore site. To date, except for the 514-3 CSU, all of the other Area 514 structures have been demolished; and sampling and analysis have taken place. The non-hazardous wastes have been disposed of. At the time of writing this report, the hazardous, mixed, and low-level radioactive wastes are in the process of profiling for final disposition. Once the disposition of all wastes has been finalized, the implementation of the approved closure plan will be completed. As a part of the closure process, LLNL is required to submit a closure report and a certification by a qualified independent engineer within 60 days of closure completion. As a result of the sampling and analysis process, contamination was found at Area 514. The results for the concrete and structural samples have been used for characterization of the wastes that were generated for disposal purposes. No soils have been removed, except for the incidental removal of the soil immediately under the concrete and asphalt pavement, and the results for soil samples have been used to characterize the site and conduct fate and transport modeling. The entire LLNL Livermore site is a CERCLA site; however, the levels of soil contamination found at Area 514 are relatively low, and fate and transport modeling shows that the existing contamination will not impact ground water for hundreds of years. Consequently, LLNL has decided to leave the contamination in place. LLNL is currently conducting a comprehensive risk assessment to possibly attain a risk-based clean-closure determination. LLNL has identified paving the area with asphalt as an interim action to stabilize the site, prevent the surface contamination from becoming airborne, and minimize the movement of the contaminants in soil. This partial closure report is submitted based on DTSC's request.

Draft Site Closeout Report

Download Draft Site Closeout Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (156 download)

DOWNLOAD NOW!


Book Synopsis Draft Site Closeout Report by : PRC Environmental Management, Inc

Download or read book Draft Site Closeout Report written by PRC Environmental Management, Inc and published by . This book was released on 1997 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Closure Report for Corrective Action Unit 139

Download Closure Report for Corrective Action Unit 139 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Closure Report for Corrective Action Unit 139 by :

Download or read book Closure Report for Corrective Action Unit 139 written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites, ' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.

Closure Report for Corrective Action Unit 166

Download Closure Report for Corrective Action Unit 166 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Closure Report for Corrective Action Unit 166 by :

Download or read book Closure Report for Corrective Action Unit 166 written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according to the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd3 of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft3 of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd3 of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd3 of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd3 of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.

Final Chemical Spill-18 Soil Removal Action Report

Download Final Chemical Spill-18 Soil Removal Action Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (489 download)

DOWNLOAD NOW!


Book Synopsis Final Chemical Spill-18 Soil Removal Action Report by : Air Force Center for Engineering and the Environment (U.S.)

Download or read book Final Chemical Spill-18 Soil Removal Action Report written by Air Force Center for Engineering and the Environment (U.S.) and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Addendum to the Closure Report for Corrective Action Unit 356

Download Addendum to the Closure Report for Corrective Action Unit 356 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Closure Report for Corrective Action Unit 356 by :

Download or read book Addendum to the Closure Report for Corrective Action Unit 356 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: This cover page that refers the reader to the UR Modification document for additional information The cover and signature pages of the UR Modification document The NDEP approval letter The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: CAS 03-04-01, Area 3 Change House Septic System CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

Strategies for Accelerating Cleanup at Toxic Waste Sites

Download Strategies for Accelerating Cleanup at Toxic Waste Sites PDF Online Free

Author :
Publisher : CRC Press
ISBN 13 : 9781566702379
Total Pages : 452 pages
Book Rating : 4.7/5 (23 download)

DOWNLOAD NOW!


Book Synopsis Strategies for Accelerating Cleanup at Toxic Waste Sites by : Scott Marshall Payne

Download or read book Strategies for Accelerating Cleanup at Toxic Waste Sites written by Scott Marshall Payne and published by CRC Press. This book was released on 1997-12-29 with total page 452 pages. Available in PDF, EPUB and Kindle. Book excerpt: Accelerating Cleanup at Toxic Waste Sites: Fast-tracking Environmental Actions and Decision Making presents truly innovative advances in investigative and cleanup technologies, offering valuable solutions that streamline the data collection process, speed up the time it takes to characterize a site, and expedite decision making. Using easy to understand graphic displays, tables, text summaries, and real world case studies, and by synthesizing technical and regulatory reference information crucial to the development of effective cleanup strategies, this book provides the framework for environmental professionals to develop project and program approaches that meet today's needs. An advanced text for those with at least basic understanding of environmental investigation, cleanup, regulations, decision making, and policy development, Accelerating Cleanup at Toxic Waste Sites addresses the "human" side of the environmental industry and why it is perhaps one of the most important considerations for successful accelerated cleanup. This book takes the next step by providing managers, project teams, and other professionals with approaches that bring techniques, regulations, strategies, and people together into one comprehensive package that works.

Addendum to the Closure Report for Corrective Action Unit 165

Download Addendum to the Closure Report for Corrective Action Unit 165 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (953 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Closure Report for Corrective Action Unit 165 by :

Download or read book Addendum to the Closure Report for Corrective Action Unit 165 written by and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.

Addendum to the Closure Report for Corrective Action Unit 398

Download Addendum to the Closure Report for Corrective Action Unit 398 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Closure Report for Corrective Action Unit 398 by :

Download or read book Addendum to the Closure Report for Corrective Action Unit 398 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: This cover page that refers the reader to the UR Modification document for additional information The cover and signature pages of the UR Modification document The NDEP approval letter The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

Military Construction Appropriations for 2002

Download Military Construction Appropriations for 2002 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1400 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Military Construction Appropriations for 2002 by : United States. Congress. House. Committee on Appropriations. Subcommittee on Military Construction Appropriations

Download or read book Military Construction Appropriations for 2002 written by United States. Congress. House. Committee on Appropriations. Subcommittee on Military Construction Appropriations and published by . This book was released on 2001 with total page 1400 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Final CS-19 Soil Removal Action Report

Download Final CS-19 Soil Removal Action Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (517 download)

DOWNLOAD NOW!


Book Synopsis Final CS-19 Soil Removal Action Report by :

Download or read book Final CS-19 Soil Removal Action Report written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Addendum to the Closure Report for Corrective Action Unit 394

Download Addendum to the Closure Report for Corrective Action Unit 394 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Addendum to the Closure Report for Corrective Action Unit 394 by :

Download or read book Addendum to the Closure Report for Corrective Action Unit 394 written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: This cover page that refers the reader to the UR Modification document for additional information The cover and signature pages of the UR Modification document The NDEP approval letter The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: CAS 12-25-04, UST 12-16-2 Waste Oil Release CAS 18-25-01, Oil Spills CAS 18-25-02, Oil Spills CAS 18-25-03, Oil Spill CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.