Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska

Download Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 121 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska by :

Download or read book Work Plan for Engineering Evaluations/Cost Analyses at Hangar 10 and Site ST41, Elmendorf Air Force Base, Anchorage, Alaska written by and published by . This book was released on 1994 with total page 121 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering-Science, Inc. (ES) and presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of fuel-hydrocarbon-contaminated ground water at two sites at Elmendorf Air Force Base (AFB), Anchorage, Alaska. The two sites to be addressed are the Hangar 10 site and site ST4l (locally known as Four Million Gallon Hill). Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and re-injection (i.e., pump and treat); air sparging; and intrinsic remediation with long-term monitoring (intrinsic remediation). All hydrogeologic and ground water chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume II ground water model in support of the intrinsic remediation (intrinsic remediation) with long-term monitoring remedial option for restoration of fuel hydrocarbon-contaminated ground water.

Final Draft Work Plan for an Engineering Evaluation/Cost Analysis to Support the Risk-Based Approach to Remediation at Site ST-27, Charleston Air Force Base, Charleston, South Carolina

Download Final Draft Work Plan for an Engineering Evaluation/Cost Analysis to Support the Risk-Based Approach to Remediation at Site ST-27, Charleston Air Force Base, Charleston, South Carolina PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 157 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Final Draft Work Plan for an Engineering Evaluation/Cost Analysis to Support the Risk-Based Approach to Remediation at Site ST-27, Charleston Air Force Base, Charleston, South Carolina by :

Download or read book Final Draft Work Plan for an Engineering Evaluation/Cost Analysis to Support the Risk-Based Approach to Remediation at Site ST-27, Charleston Air Force Base, Charleston, South Carolina written by and published by . This book was released on 1994 with total page 157 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan prepared by Parsons Engineering Science, Inc. (Parsons ES) describes the scope of work required for the collection and analysis of data to complete an engineering evaluation/cost analysis (BE/CA) to support a risk-based remediation decision for soil and groundwater contaminated with fuel hydrocarbons at Installation Restoration Program (lRP) Site ST-27 located at Charleston Air Force Base (AFB), Charleston, South Carolina. Soil and groundwater at Site ST-27 were impacted by petroleum hydrocarbons as a result of a leaking JP-4 jet fuel underground storage tank (UST). The site is located adjacent to aircraft maintenance hangar Building 575. This work plan is equivalent to a treatability study test design (TSTD) for field testing to support the risk-based approach for remediation of Site ST-27. This innovative technology is sponsored by the Air Force Center for Environmental Excellence (AFCEE) at Brooks AFB, Texas under contract F41624-93-C-8044, "Risk- Based Approach to Fuel Spill Remediation." The Site ST-27 risk-based field test and evaluation is a component of a multi site initiative being sponsored by AFCEE to demonstrate how quantitative fate and transport calculations and risk evaluation based on site-specific data can be integrated to quickly determine the type and magnitude of remedial action required at a site to minimize contaminant migration and receptor risks.

Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah

Download Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 95 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah by :

Download or read book Work Plan for an Engineering Evaluation/Cost Analysis for Hill Air Force Base, Ogden, Utah written by and published by . This book was released on 1993 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering-Science, Inc. (ES) and presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EB/CA) for remediation of fuel hydrocarbon-contaminated ground water at underground storage tank (UST) Site 870, Hill Air Force Base (AFB), Utah. Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation with long-term monitoring. All hydrogeologic and ground water chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume II ground water model in support of the natural attenuation (intrinsic remediation) with long-term monitoring remedial option for restoration of fuel hydrocarbon-contaminated ground water.

Draft Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Pumphouse Number 2. Malmstrom Air Force Base, Great Falls, Montana

Download Draft Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Pumphouse Number 2. Malmstrom Air Force Base, Great Falls, Montana PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 139 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Draft Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Pumphouse Number 2. Malmstrom Air Force Base, Great Falls, Montana by :

Download or read book Draft Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Pumphouse Number 2. Malmstrom Air Force Base, Great Falls, Montana written by and published by . This book was released on 1994 with total page 139 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering-Science, Inc. (ES) and describes the scope of work required for the collection and analysis of data to complete an engineering evaluation/cost analysis (EE/CA) in support of a risk-based remediation decision for soil and ground water contaminated with fuel hydrocarbons at Pumphouse #2 at Malmstrom Air Force Base (AFB), Great Falls, Montana. Under the basewide Installation Restoration Program (IRP), Pumphouse #2 is a portion of Site PS-3 and may be referred to as such in referenced documents used in preparation of this work plan. This work plan is the equivalent of a treatability study test design (TSTD) for the field test of the risk-based approach to remediation at Pumphouse #2. This innovative technology is sponsored by the Air Force Center for Environmental Excellence (AFCEE) at Brooks AFB, Texas, under contract F41624-93-C-8044, "Risk-Based Approach to Fuel Spill Remediation." The Pumphouse #2 demonstration is a component of a multi-site initiative being sponsored by AFCEE to demonstrate how quantitative fate and transport calculations and risk information based on site-specific data can be integrated to quickly determine the type and magnitude of remedial action required at a site to minimize contaminant migration and receptor risks.

Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14

Download Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 125 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14 by :

Download or read book Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Site ST14 written by and published by . This book was released on 1994 with total page 125 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering-Science, Inc. (ES) and describes the scope of work required for the collection and analysis of data to complete an engineering evaluation/cost analysis (BE/CA) in support of a risk-based remediation decision for soil and ground water contaminated with JP-4 fuel hydrocarbons at Site STl4 at Carswell Air Force Base (AFB), Fort Worth, Texas. Site STl4 consists of two separate sites: Site STl4A, the Fuel Loading Area, and Site STl4B, the petroleum, oil, and lubricant (POL) tank farm. This work plan is the equivalent of a treatability study test design (TSTD) for the field test of the risk-based approach for the remediation of Site ST 14. This innovative technology demonstration is sponsored by the Air Force Center for Environmental Excellence (AFCEE) at Brooks AFB, Texas, under contract F41624-93-C-8044, "Risk-Based Approach to Fuel Spill Remediation." The Site STl4 demonstration is a component of a multi-site initiative being sponsored by AFCEE to demonstrate how quantitative fate and transport calculations and risk information based on site-specific data can be integrated to quickly determine the type and magnitude of remedial action required at a site to minimize contaminant migration and receptor risks.

Work Plan for an Engineering Evaluation/Cost Analysis in Support of Intrinsic Remediation (Natural Attenuation) at Sites FT01 and SS12 King Salmon Airport, Alaska

Download Work Plan for an Engineering Evaluation/Cost Analysis in Support of Intrinsic Remediation (Natural Attenuation) at Sites FT01 and SS12 King Salmon Airport, Alaska PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 114 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for an Engineering Evaluation/Cost Analysis in Support of Intrinsic Remediation (Natural Attenuation) at Sites FT01 and SS12 King Salmon Airport, Alaska by :

Download or read book Work Plan for an Engineering Evaluation/Cost Analysis in Support of Intrinsic Remediation (Natural Attenuation) at Sites FT01 and SS12 King Salmon Airport, Alaska written by and published by . This book was released on 1994 with total page 114 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering-Science, Inc. (ES) for the Air Force Center for Environmental Excellence (AFCEE). It presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of two fuel-hydrocarbon-contaminated ground water sites at King Salmon Airport (KSA), in King Salmon, Alaska. The two sites to be addressed in this work plan are Fire Training Area No. 1 (Site FT01) and the Upper Naknek site (Site SS12). Investigations have been previously undertaken at both sites as part of the U S Air Force (USAF) Installation Restoration Program (IRP). Several remedial options will be evaluated during the EE/CA, including free product removal; ground water extraction, treatment, and re-injection (i.e., pump and treat); and intrinsic remediation with long-term monitoring (intrinsic remediation). All hydrogeologic and ground water chemical data necessary ;to evaluate the various remedial option will be collected under this program; however, this work plan is oriented primarily toward the collection of hydrogeologic data to be used as input into the Bioplume II (trade name) ground water model in support of the intrinsic remediation option for restoration of fuel-hydrocarbon-contaminated ground water.

Final Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Area D, Ellsworth Air Base, Rapid City, South Dakota

Download Final Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Area D, Ellsworth Air Base, Rapid City, South Dakota PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 127 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Final Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Area D, Ellsworth Air Base, Rapid City, South Dakota by :

Download or read book Final Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Risk-Based Approach to Remediation at Area D, Ellsworth Air Base, Rapid City, South Dakota written by and published by . This book was released on 1994 with total page 127 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan was prepared by Engineering Science, Inc. (ES) and describes the scope of work required for the collection and analysis of data to complete an engineering evaluation/cost analysis (EE/CA) in support of a risk-based remediation decision for soil and ground water contaminated with fuel hydrocarbons at Area D Bulk Fuel Storage (Area D) at Ellsworth Air Force Base (AFB), Rapid City, South Dakota. Area D, a petroleum, oil, and lubricant (POL) tank farm, is part of the base-wide fuel distribution system. This work plan is the equivalent of a treatability study test design (TSTD) for the field test of the risk-based approach to the remediation of Area D. This innovative technology is sponsored by the Air Force Center for Environmental Excellence (AFCEE) at Brooks AFB, under contract F41624-93-C-8044, "Risk-Based Approach to Fuel Spill Remediation." The Area D demonstration is a component of a multisite initiative being sponsored by AFCEE to demonstrate how quantitative fate and transport calculations and risk information based on site-specific data can be integrated to quickly determine the type and magnitude of remedial action required at a site to minimize contaminant migration and receptor risks.

Quality Cost Analysis Implementation Handbook

Download Quality Cost Analysis Implementation Handbook PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 110 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Quality Cost Analysis Implementation Handbook by : Donald E. Morgan

Download or read book Quality Cost Analysis Implementation Handbook written by Donald E. Morgan and published by . This book was released on 1964 with total page 110 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Engineering Evaluation/Cost Analysis Million Gallon Hill Source Area of the West Unit Galena Airport, Alaska

Download Engineering Evaluation/Cost Analysis Million Gallon Hill Source Area of the West Unit Galena Airport, Alaska PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 49 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Engineering Evaluation/Cost Analysis Million Gallon Hill Source Area of the West Unit Galena Airport, Alaska by :

Download or read book Engineering Evaluation/Cost Analysis Million Gallon Hill Source Area of the West Unit Galena Airport, Alaska written by and published by . This book was released on 1996 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Engineering Evaluation/Cost Analysis (EE/CA) has been developed by the U.S. Air Force for the Million Gallon Hill source area of the West Unit (IRP Site STOO9) at Galena Airport, Alaska in response to the presence of contaminated soils and the existence of free phase hydrocarbons floating on the groundwater. Four alternate non-time critical removal actions were evaluated for the Million Gallon Hill source area. These were: (1) No action; (2) Product recovery and soil bioventing; (3) Containment; and (4) Product recovery, soil excavation, and treatment. All four alternatives were evaluated on the basis of effectiveness, implementability, and cost. The second alternative, product recovery and soil bioventing, was found to be most feasible in terms of effectiveness, implementability, and cost. (MM).

Cost-analysis Engineering

Download Cost-analysis Engineering PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 92 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Cost-analysis Engineering by : American School of Correspondence

Download or read book Cost-analysis Engineering written by American School of Correspondence and published by . This book was released on 1908 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option

Download Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 112 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option by :

Download or read book Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option written by and published by . This book was released on 1993 with total page 112 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan, prepared by Engineering-Science, Inc. (ES), presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of groundwater contaminated with JP-4 jet fuel at fuel pumping station 950 at site SS27/XYZ located at Dover Air Force Base (AFB), Delaware. Several remedial options will be evaluated during the EE/CA, including free product removal; groundwater extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation (intrinsic remediation) with long-term monitoring. All hydrogeologic and groundwater chemical data necessary to evaluate the various remedial options will be collected under this program; however, this work plan is oriented toward the collection of hydrogeologic data to be used as input into the Bioplume groundwater model in support of intrinsic remediation for restoration of fuel-hydrocarbon-contaminated groundwater.

Cost Engineering Analysis

Download Cost Engineering Analysis PDF Online Free

Author :
Publisher : Wiley-Interscience
ISBN 13 :
Total Pages : 358 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Cost Engineering Analysis by : William R. Park

Download or read book Cost Engineering Analysis written by William R. Park and published by Wiley-Interscience. This book was released on 1984-05-09 with total page 358 pages. Available in PDF, EPUB and Kindle. Book excerpt: A revision of the very successful first edition with all chapters thoroughly reviewed and updated. Presents a means of rapid, inexpensive financial comparison among a group of projects as well as the more mathematically sophisticated, popular, but not necessarily accurate methods. The chapter on depreciation has been rewritten to reflect new tax laws. Discusses the impact of interest rates and income tax considerations on project evaluation. Includes expanded use of small computers with practical BASIC programs for computing depreciation, cash flow, present value, and more.

Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option at the Former Fire Protection Training Area No. 4, Pope Air Force Base, Fayetteville, North Carolina

Download Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option at the Former Fire Protection Training Area No. 4, Pope Air Force Base, Fayetteville, North Carolina PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 106 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option at the Former Fire Protection Training Area No. 4, Pope Air Force Base, Fayetteville, North Carolina by :

Download or read book Work Plan for an Engineering Evaluation/Cost Analysis in Support of the Intrinsic Remediation (Natural Attenuation) Option at the Former Fire Protection Training Area No. 4, Pope Air Force Base, Fayetteville, North Carolina written by and published by . This book was released on 1995 with total page 106 pages. Available in PDF, EPUB and Kindle. Book excerpt: This work plan, prepared by Parsons Engineering Science, Inc. (Parsons ES), presents the scope of work required for the collection of data necessary to conduct an engineering evaluation/cost analysis (EE/CA) for remediation of groundwater contaminated with petroleum products at the former Fire Protection Training Area (FPTA) No. 4 located at Pope Air Force Base (AFB), Fayetteville, North Carolina. Several remedial options will be evaluated during the EE/CA possibly including continued free product removal; groundwater extraction, treatment, and reinjection (i.e., pump and treat); air sparging; and natural contaminant attenuation (intrinsic remediation) with long-term monitoring. All hydrogeologic and groundwater chemical data necessary to evaluate the various remedial options will be collected under this program. However, this work plan is oriented toward the collection of hydrogeologic data to be used in support of intrinsic remediation for restoration of fuel-hydrocarbon-contaminated groundwater. When applicable, site-specific information may be obtained from previous studies conducted at Pope AFB.

Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah

Download Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (521 download)

DOWNLOAD NOW!


Book Synopsis Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah by : Steve Hicken

Download or read book Final Engineering Evaluation/cost Analysis Operable Unit 6 Hill Air Force Base, Utah written by Steve Hicken and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Proposed Final

Download Proposed Final PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (497 download)

DOWNLOAD NOW!


Book Synopsis Proposed Final by :

Download or read book Proposed Final written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah

Download Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (52 download)

DOWNLOAD NOW!


Book Synopsis Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah by : Hill Air Force Base (Utah). Environmental Management Directorate

Download or read book Engineering Evaluation/cost Analysis Operable Unit 5 Hill Air Force Base, Utah written by Hill Air Force Base (Utah). Environmental Management Directorate and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah

Download Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (517 download)

DOWNLOAD NOW!


Book Synopsis Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah by : Radian Corporation

Download or read book Final Engineering Evaluation/cost Analysis for Operable Unit 2, Sites WP07, SS21 Non-source Area Seeps and Springs for Hill Air Force Base, Utah written by Radian Corporation and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: