Waste Minimization Opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, Site

Download Waste Minimization Opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, Site PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Waste Minimization Opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, Site by :

Download or read book Waste Minimization Opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, Site written by and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Actions at the Former Union Carbide Corporation Uranium Mill Sites, Rifle, Garfield County, Colorado: Text

Download Remedial Actions at the Former Union Carbide Corporation Uranium Mill Sites, Rifle, Garfield County, Colorado: Text PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 284 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Remedial Actions at the Former Union Carbide Corporation Uranium Mill Sites, Rifle, Garfield County, Colorado: Text by :

Download or read book Remedial Actions at the Former Union Carbide Corporation Uranium Mill Sites, Rifle, Garfield County, Colorado: Text written by and published by . This book was released on 1987 with total page 284 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Rifle, Colorado

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Rifle, Colorado PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 569 pages
Book Rating : 4.:/5 (873 download)

DOWNLOAD NOW!


Book Synopsis Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Rifle, Colorado by :

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Rifle, Colorado written by and published by . This book was released on 1990 with total page 569 pages. Available in PDF, EPUB and Kindle. Book excerpt: This radiologic characterization of tho two inactive uranium millsites at Rifle, Colorado, was conducted by Bendix Field Engineering Corporation (Bendix) for the US Department of Energy (DOE), Grand Junction Projects Office, in accord with a Statement of Work prepared by the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor, Jacobs Engineering Group, Inc. (Jacobs). The purpose of this project is to define the extent of radioactive contamination at the Rifle sites that exceeds US Environmental Protection Agency, (EPA) standards for UMTRA sites. The data presented in this report are required for characterization of the areas adjacent to the tailings piles and for the subsequent design of cleanup activities. An orientation visit to the study area was conducted on 31 July--1 August 1984, in conjunction with Jacobs, to determine the approximate extent of contaminated area surrounding tho piles. During that visit, survey control points were located and baselines were defined from which survey grids would later be established; drilling requirements were assessed; and radiologic and geochemical data were collected for use in planning the radiologic fieldwork. The information gained from this visit was used by Jacobs, with cooperation by Bendix, to determine the scope of work required for the radiologic characterization of the Rifle sites. Fieldwork at Rifle was conducted from 1 October through 16 November 1984.

Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado: Text

Download Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado: Text PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 470 pages
Book Rating : 4.:/5 ( download)

DOWNLOAD NOW!


Book Synopsis Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado: Text by :

Download or read book Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado: Text written by and published by . This book was released on 1986 with total page 470 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Final Audit Report of Remedial Action Construction at the UMTRA Project Site Rifle, Colorado. Rev. 1

Download Final Audit Report of Remedial Action Construction at the UMTRA Project Site Rifle, Colorado. Rev. 1 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 11 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Final Audit Report of Remedial Action Construction at the UMTRA Project Site Rifle, Colorado. Rev. 1 by :

Download or read book Final Audit Report of Remedial Action Construction at the UMTRA Project Site Rifle, Colorado. Rev. 1 written by and published by . This book was released on 1997 with total page 11 pages. Available in PDF, EPUB and Kindle. Book excerpt: This final audit report summarizes the assessments performed by the U.S. Department of Energy (DOE) Environmental Restoration Division (ERD) and its Technical Assistance Contractor (TAC) of remedial action compliance with approved plans, specifications, standards, and 40 CFR Part 192 at the Rifle, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. Remedial action construction was directed by the Remedial Action Contractor (RAC).

Source Modification Special Study. [Uranium Mill Tailings Remedial Action Project].

Download Source Modification Special Study. [Uranium Mill Tailings Remedial Action Project]. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (971 download)

DOWNLOAD NOW!


Book Synopsis Source Modification Special Study. [Uranium Mill Tailings Remedial Action Project]. by :

Download or read book Source Modification Special Study. [Uranium Mill Tailings Remedial Action Project]. written by and published by . This book was released on 1989 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: One of the major issues that must be addressed during the evaluation of the efficiency of tailings embankment designs for compliance with groundwater standards is the estimation of source concentrations and the change in these concentrations with time. Because any effort to predict concentrations of contaminants in the uppermost aquifer requires a source concentration, data from these analyses are essential. Thetechnical approach of this study was twofold. The first approach was to investigate the rates of natural flushing of contaminants. Two sets of tailings samples were collected at two sites on the Old Rifle tailings pile at the Rifle UMTRA Project site in Colorado. One set of samples was collected at a site where the lower portion of the profile is continuously inundated with water and the other set was collected in anarea that only receives water from precipitation. The tailings samples were refluxed in strong acid (nitric acid) and the leachate was analyzed for hazardous constituents. The results of this investigation indicate that many of the hazardous constituents have been leached from the tailings at the wet site and that there has been little redistribution of elemental hazardous constituents at the dry site. The second approach involved a laboratory investigation of contaminant removal from tailings by doubly distilled water and two lixiviants. Tailings samples from the Gunnison, Colorado, UMTRA Project site were subjected to leaching by doubly distilled water, and by the lixiviants sodium bicarbonate and disodium ethylenediaminetetraacetic acid. The resulting data were tabulated and plotted with concentration as a function of pore volume. Evaluation of the data indicates that pore fluids should show a decrease in concentration after very few pore volumes of liquid have eluted through the tailings. It is also demonstrated that lixiviants significantly increase the solubility and rate of elution of all of the hazardous constituents.

The Office of Environmental Management Technical Reports

Download The Office of Environmental Management Technical Reports PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 972 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis The Office of Environmental Management Technical Reports by :

Download or read book The Office of Environmental Management Technical Reports written by and published by . This book was released on 1997 with total page 972 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Status report - the colorado uranium mill tailings remedial action (umtra) project

Download Status report - the colorado uranium mill tailings remedial action (umtra) project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (133 download)

DOWNLOAD NOW!


Book Synopsis Status report - the colorado uranium mill tailings remedial action (umtra) project by : The Colorado Department Of Health

Download or read book Status report - the colorado uranium mill tailings remedial action (umtra) project written by The Colorado Department Of Health and published by . This book was released on 1987 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Uranium Mill Tailings Remedial Action Project Waste Minimization and Pollution Prevention Awareness Program Plan

Download Uranium Mill Tailings Remedial Action Project Waste Minimization and Pollution Prevention Awareness Program Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 21 pages
Book Rating : 4.:/5 (682 download)

DOWNLOAD NOW!


Book Synopsis Uranium Mill Tailings Remedial Action Project Waste Minimization and Pollution Prevention Awareness Program Plan by :

Download or read book Uranium Mill Tailings Remedial Action Project Waste Minimization and Pollution Prevention Awareness Program Plan written by and published by . This book was released on 1994 with total page 21 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this plan is to establish a waste minimization and pollution prevention awareness (WM/PPA) program for the U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The program satisfies DOE requirements mandated by DOE Order 5400.1. This plan establishes planning objectives and strategies for conserving resources and reducing the quantity and toxicity of wastes and other environmental releases.

Uranium Mill Sites, Rifle, Remedial Actions for Former Union Carbide Corporation Operation

Download Uranium Mill Sites, Rifle, Remedial Actions for Former Union Carbide Corporation Operation PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 744 pages
Book Rating : 4.3/5 (555 download)

DOWNLOAD NOW!


Book Synopsis Uranium Mill Sites, Rifle, Remedial Actions for Former Union Carbide Corporation Operation by :

Download or read book Uranium Mill Sites, Rifle, Remedial Actions for Former Union Carbide Corporation Operation written by and published by . This book was released on 1987 with total page 744 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Radioactive Waste Management

Download Radioactive Waste Management PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 552 pages
Book Rating : 4.X/5 (2 download)

DOWNLOAD NOW!


Book Synopsis Radioactive Waste Management by :

Download or read book Radioactive Waste Management written by and published by . This book was released on 1981 with total page 552 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 400 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado by :

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado written by and published by . This book was released on 1995 with total page 400 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

Energy Research Abstracts

Download Energy Research Abstracts PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 782 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Energy Research Abstracts by :

Download or read book Energy Research Abstracts written by and published by . This book was released on 1995 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison, Colorado

Download Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison, Colorado PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (865 download)

DOWNLOAD NOW!


Book Synopsis Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison, Colorado by : United States. Department of Energy. UMTRA Project Office

Download or read book Environmental Assessment of Remedial Action at the Gunnison Uranium Mill Tailings Site Near Gunnison, Colorado written by United States. Department of Energy. UMTRA Project Office and published by . This book was released on 1992 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Mitigation Action Plan for Remedial Action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado

Download Mitigation Action Plan for Remedial Action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 31 pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Mitigation Action Plan for Remedial Action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado by :

Download or read book Mitigation Action Plan for Remedial Action at the Uranium Mill Tailing Sites and Disposal Site, Rifle, Colorado written by and published by . This book was released on 1992 with total page 31 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Estes Gulch disposal site is approximately 10 kilometers (6 miles) north of the town of Rifle, off State Highway 13 on Federal land administered by the Bureau of Land Management. The Department of Energy (DOE) will transport the residual radioactive materials (RRM) by truck to the Estes Gulch disposal site via State Highway 13 and place it in a partially below-grade disposal cell. The RRM will be covered by an earthen radon barrier, frost protection layers, and a rock erosion protection layer. A toe ditch and other features will also be constructed to control erosion at the disposal site. After removal of the RRM and disposal at the Estes Gulch site, the disturbed areas at all three sites will be backfilled with clean soils, contoured to facilitate surface drainage, and revegetated. Wetlands areas destroyed at the former Rifle processing sites will be compensated for by the incorporation of now wetlands into the revegetation plan at the New Rifle site. The UMTRA Project Office, supported by the Remedial Action Contractor (RAC) and the Technical Assistance Contractor (TAC), oversees the implementation of the MAP. The RAC executes mitigation measures in the field. The TAC provides monitoring of the mitigation actions in cases where mitigation measures are associated with design features. Site closeout and inspection compliance will be documented in the site completion report.

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Gunnison, Colorado. Attachment 4, Water Resources Protection Strategy

Download Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Gunnison, Colorado. Attachment 4, Water Resources Protection Strategy PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 25 pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Gunnison, Colorado. Attachment 4, Water Resources Protection Strategy by :

Download or read book Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site at Gunnison, Colorado. Attachment 4, Water Resources Protection Strategy written by and published by . This book was released on 1992 with total page 25 pages. Available in PDF, EPUB and Kindle. Book excerpt: To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer at the point of compliance (POC) at the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site near Gunnison, Colorado. The proposed remedial action will ensure protection of human health and the environment. A summary of the principal features of the water resources protection strategy for the Gunnison disposal site is included in this report.

Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites Slick Rock, Colorado

Download Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites Slick Rock, Colorado PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 157 pages
Book Rating : 4.:/5 (682 download)

DOWNLOAD NOW!


Book Synopsis Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites Slick Rock, Colorado by :

Download or read book Environmental Assessment of Remedial Action at the Slick Rock Uranium Mill Tailings Sites Slick Rock, Colorado written by and published by . This book was released on 1994 with total page 157 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.