Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan

Download Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 78 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan by :

Download or read book Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Health and Safety Plan written by and published by . This book was released on 1995 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this document is to establish procedures and protocols that will be followed to protect on-site personnel, visitors, and the public from physical harm and exposure to hazardous material or wastes during the remedial investigationlfeasibility study of the Defense Reutilization and Marketing Office (DRMO) Site (formerly referred to as the Defense Property Disposal Organization (DPDO) Site) on Fort George 0. Meade near Laurel, Maryland. Engineering Technologies Associates, Inc. (ETA) and subcontractor personnel involved in remedial investigations at sites where hazardous substances are present may potentially be exposed to a variety of chemical, physical, environmental, biological, and ergonomic hazards, including: * Inhalation of toxic airborne contaminants; * Skin contact with contaminated soil and water; * Presence of flammable/combustible vapors; * Explosives or unexploded ordnance; * Oxygen-deficient atmospheres; * Heat stress due to protective clothing and environmental conditions; * Cold stress due to environmental conditions; * Etiologic agents and biological hazards; and * Physical hazards associated with field operations (e.g., working near heavy equipment, slips, trips, falls, etc.).

Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Quality Control Plan

Download Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Quality Control Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 108 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Quality Control Plan by :

Download or read book Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland. Final Quality Control Plan written by and published by . This book was released on 1995 with total page 108 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Quality Control Plan (QCP) was prepared by Engineering Technologies Associates, Inc. (ETA) under Contract No. DACA31-92-D-0045, Delivery Order 0010, for the U.S. Army Environmental Center (USAEC) to address the Remedial Investigation and Feasibility Study of the Defense Reutilization and Marketing Office (DRMO) Yard at Fort Meade, formerly referred to as the Defense Property and Disposal Office (DPDO). This Quality Control Plan (QCP) has been developed in accordance with the United States Toxic and Hazardous Materials Agency (USATHAMA) Geotechnical Requirements, and the USATHAMA Quality Assurance Program and the Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA. This QCP for the RI/FS at the DRMO Yard has been developed to comply with the requirements of the USAEC Quality Assurance Program, USATHAMA PAM 11-41, Revision No. 0, January 1990 and appropriate EPA Region III Quality Assurance Guidance as applicable. Our subcontracted laboratory will be DataChem Laboratories, of Salt Lake City, Utah. They will provide chemical analyses of environmental samples collected during this investigation. Therefore the QA Program Plan from DataChem Laboratories is included as Attachment A. ETAs corporate policy includes a commitment to a high standard of quality in the work it performs for and delivers to its clients. This policy is reflected in the quality of our general operating policies and procedures and the quality of the workmanship that is produced for our clients. We expect the same level of commitment to quality from our subcontractors. The objective of the USAEC Quality Assurance Program is to establish a QA system and proper QC procedures associated with the Quality Control Plan for specific projects, such as the Remedial Investigation and Feasibility Study at the DRMO Yard at Fort Meade.

Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland

Download Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (15 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland by :

Download or read book Remedial Investigation and Feasibility Study of the Defense Property Disposal Office, Fort George G. Meade, Maryland written by and published by . This book was released on 1995 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Remedial Investigation/Feasibility Study (RI/FS) Technical Work Plan was prepared by Engineering Technologies Associates, Inc. (ETA) under Contract No. DACA31-92-D-0045, Delivery Order 0010, for the U. S. Army Environmental Center (USAEC). The study area is a storage facility for old vehicles, transformers and a variety of equipment. The site was formerly referred to as the Defense Property and Disposal Office (DPDO) Yard and is now known as the Defense Reutilization and Marketing Office (DRMO) Yard. This Work Plan has been developed in accordance with the Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, United States Toxic and Hazardous Materials Agency (USATHAMA) Geotechnical Requirements, and the USATHAMA Quality Assurance Program (1990). Under the 1988 Defense Secretary's Commission on Base Realignment and Closure Act (BRAC), approximately 9,000 acres of the 15,000 acre facility were designated for closure. In October 1991, 7,600 acres were transferred from the U.S. Army to the Patuxent Wildlife Research Center, south of Route 32. In January 1993, an additional 500 acres were also transferred and FGGM decided to retain the 308 acres including the Active Sanitary Landfill. Figure 1 is a map showing the physical location of the DRMO Yard in relation to the BRAC Land Parcels. The remaining 440 acres, including the Tipton Army Airfield, is scheduled for closure in September 1995. Figure No. 1 shows the DRMO site in relation to surrounding lands.

Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Download Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland by :

Download or read book Final Work Plan and Quality Assurance Project Plan Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland written by and published by . This book was released on 1995 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this investigation is to conduct a remedial investigation/feasibility study at the HHA and FTA sites at Fort Meade. As part of the analyses, data gaps will be identified. Previous studies have been conducted by Arthur D. Little, Inc., and EA engineering, Science and Technology, Inc. The RI/FS process is designed to collect sufficient data of demonstrable quality, which can then be used to assess potential risks to human health and the environment, develop/evaluate remedial alternatives, and select a preferred remedial action. In general, data obtained during the RI phase is used to evaluate the nature, extent, and migration of contaminants at sites that are known or believed to have been adversely impacted by past hazardous waste or hazardous materials handling practices. The FS phase evaluates potential remedial action with regard to effectiveness, risk reduction or mitigation, implementability, and cost.

Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland

Download Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland by :

Download or read book Final Work Plan for the Remediation Investigations and Feasibility Studies of the Helicopter Hangar Area and the Fire Training Area at Fort George G. Meade, Maryland written by and published by . This book was released on 1995 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Work Plan has been prepared to address the Remedial Investigation/ Feasibility Study (RI/FS) activities being conducted at the Helicopter Hangar Area (HHA) and the Fire Training Area (FTA) at Fort George G. Meade (FGGM), Maryland. It has been prepared for the U.S. Army Environmental Center (USAEC) to fulfill the requirements of deliverable ELIN A004 under Delivery Task Orders 0002 and 0003 of Contract DAAA15-93-D-0010. This Work Plan has been developed in accordance with Geotechnical Requirements for Drilling Monitor Wells Data Acquisition and Reports (USATHAMA, 1987); USATHAMA Quality Assurance Plan (USATHAMA, 1990); Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA (USEPA, 1988); Risk Assessment Guidance for Superfund. Volumes I and II (USEPA, 1989); Community Relations in Superfund: A Handbook (USEPA, 1988) and Superfund Public Health Evaluation Manual (USEPA, 1986).

Remedial Investigation/feasibility Study

Download Remedial Investigation/feasibility Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (497 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation/feasibility Study by : United States. Army. Corps of Engineers

Download or read book Remedial Investigation/feasibility Study written by United States. Army. Corps of Engineers and published by . This book was released on 1990 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2

Download Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 189 pages
Book Rating : 4.:/5 (15 download)

DOWNLOAD NOW!


Book Synopsis Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2 by :

Download or read book Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI), Addendum for Fort George G. Meade, Maryland. Revision 2 written by and published by . This book was released on 1993 with total page 189 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Quality Control Plan has been prepared to address the Feasibility Study (FS) and Remedial Investigation/Site Inspection (RI/SI) Addendum activities and a Change Order to Delivery Order No. 0009 dated July 15, 1993, at the Fort George G. Meade (FGGM). It has been prepared for the U.S. Army Environmental Center (USAEC), formerly the U.S. Army Toxic and Hazardous Materials Agency (USATHAMA), to fulfill the requirement of deliverable ELIN A004 under Task Order 0009 of TEPS contract DAAA15-9l-D-00l6. It has been developed in accordance with the USATHAMA Quality Assurance Program, USATHAMA Geotechnical Requirements, and Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA.

Stanly County, N.C., 1841-1991

Download Stanly County, N.C., 1841-1991 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 71 pages
Book Rating : 4.:/5 (299 download)

DOWNLOAD NOW!


Book Synopsis Stanly County, N.C., 1841-1991 by :

Download or read book Stanly County, N.C., 1841-1991 written by and published by . This book was released on 1991* with total page 71 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Investigation/Feasibility Study Health and Safety Plan

Download Remedial Investigation/Feasibility Study Health and Safety Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 210 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation/Feasibility Study Health and Safety Plan by :

Download or read book Remedial Investigation/Feasibility Study Health and Safety Plan written by and published by . This book was released on 1994 with total page 210 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Health and Safety Plan (HSP) provides site-specific health and safety controls to be followed during Remedial Investigation (Rl)/Feasibility Study (FS) field activities to be conducted at Indian Mountain Long Range Radar Station (LRRS). The elements of the plan include procedures for personal protection, personnel and equipment safety, medical surveillance, air quality monitoring, and general work practices. This plan also details proper emergency procedures including emergency response and first aid capabilities. (pg 1-1) -BKA.

Remedial Investigation/Feasibility Study Fort Dix U.S. Army Installation Fort Dix, New Jersey

Download Remedial Investigation/Feasibility Study Fort Dix U.S. Army Installation Fort Dix, New Jersey PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 329 pages
Book Rating : 4.:/5 (455 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation/Feasibility Study Fort Dix U.S. Army Installation Fort Dix, New Jersey by : Abb environmental services inc portlandme

Download or read book Remedial Investigation/Feasibility Study Fort Dix U.S. Army Installation Fort Dix, New Jersey written by Abb environmental services inc portlandme and published by . This book was released on 1994 with total page 329 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Health and Safety Plan (HASP) was prepared by ABB Environmental Services, Inc. (ABB-ES) in response to Task Order 0007 of Contract DAAA15-91-D-0008 for the Remedial Investigation/ Feasibility Study (RI/FS) at the Magazine Area 1 (MAG-1) Area of the Fort Dix U.S. Army Installation (Ft. Dix), New Jersey. The HASP addresses all activities associated with the RI/PS field operations at MAG-1 and has been prepared in conformance with the ABB-ES Health and Safety Program and is intended to meet the requirements found in 29 CPR 2910.120. Compliance with the HASP is required of all ABB-ES personnel, contractor personnel, or third parties entering the site.

Phase II Remedial Investigation/feasibility Study, Sierra Army Depot

Download Phase II Remedial Investigation/feasibility Study, Sierra Army Depot PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (65 download)

DOWNLOAD NOW!


Book Synopsis Phase II Remedial Investigation/feasibility Study, Sierra Army Depot by : James M. Montgomery, Consulting Engineers

Download or read book Phase II Remedial Investigation/feasibility Study, Sierra Army Depot written by James M. Montgomery, Consulting Engineers and published by . This book was released on 1991 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Final Remedial Investigation/feasibility Study

Download Final Remedial Investigation/feasibility Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (522 download)

DOWNLOAD NOW!


Book Synopsis Final Remedial Investigation/feasibility Study by : James M. Montgomery, Consulting Engineers

Download or read book Final Remedial Investigation/feasibility Study written by James M. Montgomery, Consulting Engineers and published by . This book was released on 1993 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Investigation & Feasibility Study

Download Remedial Investigation & Feasibility Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (341 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation & Feasibility Study by : Earth Tech (Firm)

Download or read book Remedial Investigation & Feasibility Study written by Earth Tech (Firm) and published by . This book was released on 1994 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Final Health and Safety Plan for the Remedial Investigation/feasibility Study

Download Final Health and Safety Plan for the Remedial Investigation/feasibility Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (436 download)

DOWNLOAD NOW!


Book Synopsis Final Health and Safety Plan for the Remedial Investigation/feasibility Study by : New York (State). Division of Environmental Remediation

Download or read book Final Health and Safety Plan for the Remedial Investigation/feasibility Study written by New York (State). Division of Environmental Remediation and published by . This book was released on 1998 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Fernald Environmental Management Project (FEMP), Operable Unit 4 Remedial Investigation Feasibility Study, Cincinnati County, Butler County, Hamilton County F,FDsup [Sep 1994]; Final Feasibility Report for Operable Unit 4 (volumes 1-4) B1,B2,B3,B4; Fact Sheet

Download Fernald Environmental Management Project (FEMP), Operable Unit 4 Remedial Investigation Feasibility Study, Cincinnati County, Butler County, Hamilton County F,FDsup [Sep 1994]; Final Feasibility Report for Operable Unit 4 (volumes 1-4) B1,B2,B3,B4; Fact Sheet PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 16 pages
Book Rating : 4.3/5 (555 download)

DOWNLOAD NOW!


Book Synopsis Fernald Environmental Management Project (FEMP), Operable Unit 4 Remedial Investigation Feasibility Study, Cincinnati County, Butler County, Hamilton County F,FDsup [Sep 1994]; Final Feasibility Report for Operable Unit 4 (volumes 1-4) B1,B2,B3,B4; Fact Sheet by :

Download or read book Fernald Environmental Management Project (FEMP), Operable Unit 4 Remedial Investigation Feasibility Study, Cincinnati County, Butler County, Hamilton County F,FDsup [Sep 1994]; Final Feasibility Report for Operable Unit 4 (volumes 1-4) B1,B2,B3,B4; Fact Sheet written by and published by . This book was released on 1994 with total page 16 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12

Download Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1148 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12 by :

Download or read book Remedial Investigation/feasibility Study Work Plan and Addenda for Operable Unit 4-12 written by and published by . This book was released on 1993 with total page 1148 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan

Download Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan by :

Download or read book Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan written by and published by . This book was released on 1995 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: The requirements set forth in 29 CFR 1910.120(f), shall be met for all employees performing or supervising hazardous waste operations. Medical exams shall be conducted as soon as possible upon notification by an employee that he/she has developed signs or symptoms indicating possible health hazards or overexposure to hazardous substances. Subcontractor personnel shall provide documentation of current status of participation in a medical surveillance program as required by 29 CFR 1910.120(f). Subcontractors unable to provide such documentation shall have successfully completed a medical examination as described in the above referenced OSHA standard prior to beginning work in a contaminated zone. Specific protocols for medical examinations are designed by an occupational physician. Common components include: (a) medical history and physical examination; (b) dipstick urinalysis, vision screen and vital signs; (c) spirometry ;(d) audiometry; (e) blood chemistry (complete blood count, liver function, kidney function, lipid metabolism, carbohydrate metabolism); (f) resting EkG (with approval); (g) chest radiograph (P/A). No project-specific medical examinations, or biological monitoring is required for this project.