Preliminary Airworthiness Evaluation AH-1S Helicopter Equipped with a Garrett Infrared Radiation Suppressor and an AN/ALQ-144 Jammer

Download Preliminary Airworthiness Evaluation AH-1S Helicopter Equipped with a Garrett Infrared Radiation Suppressor and an AN/ALQ-144 Jammer PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 79 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation AH-1S Helicopter Equipped with a Garrett Infrared Radiation Suppressor and an AN/ALQ-144 Jammer by : Gary L. Bender

Download or read book Preliminary Airworthiness Evaluation AH-1S Helicopter Equipped with a Garrett Infrared Radiation Suppressor and an AN/ALQ-144 Jammer written by Gary L. Bender and published by . This book was released on 1978 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: The tests were conducted to determine the effects of installation of the IRS and the AN/ALQ-144 infrared jammer. There was no apparent effect on power required to hover and only a small increase in power required to maintain level flight. Because of a power-available degradation, however, there was a loss of 220 pounds payload in an out-of-ground-effect hover at 4000 feet, 35 C. Additionally, at 2000 feet, 25 c, and 9300 pounds gross weight, there was a reduction in maximum level flight airspeed of 3.5 knots true airspeed in the clean wing configuration. No degradation in handling qualities was caused by IRS or infrared jammer installation. However, one deficiency and six shortcomings inherent in the basic AH-1S were noted. The nonadjustable ventilation system is a deficiency because it blows dirt and dust into the pilot's eyes during operations from unprepared surfaces.

Scientific and Technical Aerospace Reports

Download Scientific and Technical Aerospace Reports PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1074 pages
Book Rating : 4.:/5 (31 download)

DOWNLOAD NOW!


Book Synopsis Scientific and Technical Aerospace Reports by :

Download or read book Scientific and Technical Aerospace Reports written by and published by . This book was released on 1979 with total page 1074 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1048 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

NASA SP.

Download NASA SP. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 430 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis NASA SP. by :

Download or read book NASA SP. written by and published by . This book was released on 1979 with total page 430 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Aeronautical Engineering

Download Aeronautical Engineering PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 782 pages
Book Rating : 4.:/5 (31 download)

DOWNLOAD NOW!


Book Synopsis Aeronautical Engineering by :

Download or read book Aeronautical Engineering written by and published by . This book was released on 1979 with total page 782 pages. Available in PDF, EPUB and Kindle. Book excerpt: A selection of annotated references to unclassified reports and journal articles that were introduced into the NASA scientific and technical information system and announced in Scientific and technical aerospace reports (STAR) and International aerospace abstracts (IAA).

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1334 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1979 with total page 1334 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1324 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1979 with total page 1324 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Preliminary Airworthiness Evaluation of the UH-1H with Hot Metal Plus Plume Infrared Suppressor and Infrared Jammer

Download Preliminary Airworthiness Evaluation of the UH-1H with Hot Metal Plus Plume Infrared Suppressor and Infrared Jammer PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 89 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation of the UH-1H with Hot Metal Plus Plume Infrared Suppressor and Infrared Jammer by : Bartholomew D Picasso (III.)

Download or read book Preliminary Airworthiness Evaluation of the UH-1H with Hot Metal Plus Plume Infrared Suppressor and Infrared Jammer written by Bartholomew D Picasso (III.) and published by . This book was released on 1981 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Preliminary Airworthiness Evaluation (PAE) of the UH-1H, with the Infrared (IR) Suppressor and AN/ALQ-144 IR Jammer installed, was conducted using a JUH-1H helicopter. A total of 20.7 hours were flown during this test program. This PAE was an evaluation of a redesigned IR suppressor and IR jammer installation for the UH-1H helicopter. The initial design was reported to have caused a degradation in directional stability. The installation was redesigned to reduce the airflow disturbance over the tail rotor and vertical stabilizer. This evaluation was conducted in two phases. Phase I (9.5 flight hours) was a comparative evaluation of handling qualities of the UH-1H in both the standard and IR suppressor configurations. Phase II (11.2 flight hours) was primarily a pressure and temperature survey of the IR suppressor configuration. The handling qualities of the UH-1H helicopter were essentially unchanged by the IR suppressor and IR jammer installation tested. The previously reported degradation in directional stability was not observed during this test. The tail boom surface temperatures were generally higher for the initial design and the structural implications of these higher temperatures should be investigated. One deficiency, the metal to metal contact between the engine exhaust ejector and the IR suppressor inner core support struts, was identified. Three shortcomings were also identified.

Preliminary Airworthiness Evaluation AH-1S(Prod) Helicopter Equipped with a Substitute Straight Exhaust Pipe

Download Preliminary Airworthiness Evaluation AH-1S(Prod) Helicopter Equipped with a Substitute Straight Exhaust Pipe PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 36 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation AH-1S(Prod) Helicopter Equipped with a Substitute Straight Exhaust Pipe by : Patrick M. Morris

Download or read book Preliminary Airworthiness Evaluation AH-1S(Prod) Helicopter Equipped with a Substitute Straight Exhaust Pipe written by Patrick M. Morris and published by . This book was released on 1980 with total page 36 pages. Available in PDF, EPUB and Kindle. Book excerpt: A limited performance and handling qualities evaluation and an engine and transmission cooling survey of an AH-1S (PROD) Helicopter equipped with a substitute straight exhaust pipe was performed at Edwards Air Force Base between 20 and 23 August 1979. A total of 8 hours, 6.3 of which were productive, was required. No significant changes in performance or handling qualities were found as a result of the substitute straight exhaust pipe installation. The engine and transmission cooling characteristics were similar to those of a production AH-1S and were satisfactory. No previously unreported shortcomings or deficiencies were identified. (Author).

Preliminary Airworthiness Evaluation AH - 1S (MC (Modernized Cobra)) Helicopter with External Fuel Tanks Installed

Download Preliminary Airworthiness Evaluation AH - 1S (MC (Modernized Cobra)) Helicopter with External Fuel Tanks Installed PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (124 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation AH - 1S (MC (Modernized Cobra)) Helicopter with External Fuel Tanks Installed by : John I. Nagata

Download or read book Preliminary Airworthiness Evaluation AH - 1S (MC (Modernized Cobra)) Helicopter with External Fuel Tanks Installed written by John I. Nagata and published by . This book was released on 1984 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Preliminary Airworthiness Evaluation of the AH-1S Modernized Cobra, (S/N 69-16423) with the Kellett ferry tanks installed was conducted at Edwards Air Force Base, California (2302 feet) and Bakersfield, California (488 feet). Approximately 19 productive hours were flown during 24 flights between 17 March and 27 April 1984. The Kellett ferry tanks increased the equivalent flat plate area by 2.0 sq ft. One deficiency noted during the evaluation was the lack of crashworthiness of the external fuel tanks. Four shortcomings associated with the installation of the external fuel tanks were found.

Preliminary Airworthiness Evaluation Ah-1S Helicopter Installed with Enhanced Cobra Armanent System (ah-1S/ECAS).

Download Preliminary Airworthiness Evaluation Ah-1S Helicopter Installed with Enhanced Cobra Armanent System (ah-1S/ECAS). PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 138 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation Ah-1S Helicopter Installed with Enhanced Cobra Armanent System (ah-1S/ECAS). by : Patrick J. Moe

Download or read book Preliminary Airworthiness Evaluation Ah-1S Helicopter Installed with Enhanced Cobra Armanent System (ah-1S/ECAS). written by Patrick J. Moe and published by . This book was released on 1979 with total page 138 pages. Available in PDF, EPUB and Kindle. Book excerpt: The United States Army Aviation Engineering Flight Activity conducted a preliminary airworthiness evaluation of the Enhanced Cobra Armament System (ECAS) with the universal turret subsystem and M-197 20mm gun installed. The purpose of the test was to evaluate the effects of turret installation and weapons firing on the helicopter. Additionally, a limited stability and control evaluation of the helicopter (gun stowed) was conducted. Flight testing was performed at Yuma Proving Grounds, Arizona, and consisted of 27 flight test hours (15 productive).

Quick-Reaction Report on Contracting Procedures for the Hot Metal Plus Plume Suppression System Used on the AH-1 Cobra Helicopter

Download Quick-Reaction Report on Contracting Procedures for the Hot Metal Plus Plume Suppression System Used on the AH-1 Cobra Helicopter PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 9 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Quick-Reaction Report on Contracting Procedures for the Hot Metal Plus Plume Suppression System Used on the AH-1 Cobra Helicopter by :

Download or read book Quick-Reaction Report on Contracting Procedures for the Hot Metal Plus Plume Suppression System Used on the AH-1 Cobra Helicopter written by and published by . This book was released on 1990 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: During our audit of Suppression Systems Used on the AH-1 Helicopter and OV-lD Aircraft, and the AN/ALQ-144 Infrared Jammer, we made a limited review of contracting procedures as a part of our overall objective, which was to evaluate the design adequacy of the systems. We reviewed modification P000l0 of contract no. DAAJ09-87-C-ll96 for production of the Hot Metal Plus Plume Suppression system to determine the nature and extent of efforts made to improve the suppressor's reliability. The Army awarded modification P00010 to Hayes Targets, Leeds, Alabama, on December 5, 1989. The modification incorporated two value engineering changes: a replaceable nosecone and strut reinforcements. This report discusses the propriety of approving the value engineering change proposal and the appropriateness of sharing the projected savings with the contractor. Hayes projected that life-cycle operation and maintenance costs would be reduced by $10 million if the Army implemented the two value engineering changes. Hayes' estimated share of the $10 million savings is $5 million. In an August 16, 1990 memorandum (Enclosure 1), we requested that the Army suspend further negotiations pending issuance of this report. We determined that the Army had paid for development of the proposed changes in 1985, 2 years before it awarded the contract to Hayes Targets; therefore, Hayes is not entitled to benefit from the savings generated by the changes. Further, responsible Army personnel were aware that the improvements proposed by Hayes Targets had already been implemented and were undergoing test and evaluation, but the COBRA helicopter Project Management Office made a management decision to approve the value engineering change proposals. Payments based on projected savings relating to the value engineering changes would be.

Preliminary Airworthiness Evaluation: AH-1S Helicopter Installed with Enhanced Cobra Armament System (AH-1S/ECAS)

Download Preliminary Airworthiness Evaluation: AH-1S Helicopter Installed with Enhanced Cobra Armament System (AH-1S/ECAS) PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 129 pages
Book Rating : 4.:/5 (641 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation: AH-1S Helicopter Installed with Enhanced Cobra Armament System (AH-1S/ECAS) by : Patrick J. Moe

Download or read book Preliminary Airworthiness Evaluation: AH-1S Helicopter Installed with Enhanced Cobra Armament System (AH-1S/ECAS) written by Patrick J. Moe and published by . This book was released on 1979 with total page 129 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Preliminary Airworthiness Evaluation AH-1S Helicopter with Ogee Tip Shape Motor Blades

Download Preliminary Airworthiness Evaluation AH-1S Helicopter with Ogee Tip Shape Motor Blades PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 40 pages
Book Rating : 4.:/5 (179 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation AH-1S Helicopter with Ogee Tip Shape Motor Blades by : Gary L. Bender

Download or read book Preliminary Airworthiness Evaluation AH-1S Helicopter with Ogee Tip Shape Motor Blades written by Gary L. Bender and published by . This book was released on 1980 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Preliminary Airworthiness Evaluation AH-1S Helicopter with OGEE Tip Shape Rotor Blades

Download Preliminary Airworthiness Evaluation AH-1S Helicopter with OGEE Tip Shape Rotor Blades PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 40 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation AH-1S Helicopter with OGEE Tip Shape Rotor Blades by : Gary L. Bender

Download or read book Preliminary Airworthiness Evaluation AH-1S Helicopter with OGEE Tip Shape Rotor Blades written by Gary L. Bender and published by . This book was released on 1980 with total page 40 pages. Available in PDF, EPUB and Kindle. Book excerpt: The United States Army Aviation Engineering Flight Activity conducted a Preliminary Airworthiness Evaluation of the AH-1S helicopter with OGEE tip-shape main rotor blades to determine if any improvement in performance or handling qualities resulted from replacing the K747 blades. Additionally, the acoustics signature of the OGEE blades were measured by the US Army Research and Technology Laboratories (Aeromechanics Lab). Tests were conducted at Edwards Air Force Base (elevation 2302 feet) and Coyote Flats (elevation 9980 feet), California from 1 November 1979 through 8 April 1980. Forty-five test flights were flown for a total of 36.6 productive hours (63.2 total hours). Both hover and level flight performance were degraded by installation of OGEE tip-shape main rotor blades. Low-speed handling qualities were unaffected by the OGEE blades. Other handling qualities tests were not accomplished. Results of acoustics tests will be reported by the laboratories under a separate cover. (Author).

Preliminary Airworthiness Evaluation of the AH-1S (Modernized Cobra) with the HELLFIRE, TOW, and Stinger Missiles Installed

Download Preliminary Airworthiness Evaluation of the AH-1S (Modernized Cobra) with the HELLFIRE, TOW, and Stinger Missiles Installed PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 193 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Preliminary Airworthiness Evaluation of the AH-1S (Modernized Cobra) with the HELLFIRE, TOW, and Stinger Missiles Installed by :

Download or read book Preliminary Airworthiness Evaluation of the AH-1S (Modernized Cobra) with the HELLFIRE, TOW, and Stinger Missiles Installed written by and published by . This book was released on 1984 with total page 193 pages. Available in PDF, EPUB and Kindle. Book excerpt: The aircraft was operated at gross weights up to 10,400 lb, up to 11, 340 feet density altitude and at a lateral center of gravity (cg) range from one inch right to approximately three inches left. The asymmetric loadings were caused by the various combinations of armament configurations. The change in equivalent flat plate area compared to the clean aircraft for each configuration varied as a function of airspeed. At 130 knots true airspeed (KTAS), the increased flat plate area was 4.2 square feet for the Launcher configuration, 4. 8 square feet for the TOW configuration, 6.6 square feet for the Hellfire and Hellfire/TOW configurations, and 7.8 square feet for the Stinger/Hellfire/TOW configuration. The increase in flat plate area for the Stinger/Hellfire/TOW configuration reduced maximum level flight speed for normal rated power by approximatley 8 KTAS. With the exception of the two armament related shortcomings listed below, the handling qualities and the reactions to system failures of the AH-1S (MC) were not significantly changed by the asymmetric loading of the various armament configurations. Four shortcomings were noted and follow in decreasing order of importance: (1) the high left rolling response to a sudden engine failure at power settings above 75% torque; (2) the undesirable maneuvering stability characteristics above 1.4 g's; (3) insufficient left pedal margin available in right sideward flight above 10 knots in the Hellfire and Hellfire/TOW configurations; and (4) insufficient left pedal margin available for ball-centered forward flight below 30 KCAS in the armament configurations with left lateral cf offset. A CAUTION is recommended for inclusion in the operator's manual dealing with.

Performance and Handling Qualities - AH-1G Helicopter Equipped with Three Hot Metal/Plume Infrared Suppressors

Download Performance and Handling Qualities - AH-1G Helicopter Equipped with Three Hot Metal/Plume Infrared Suppressors PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Performance and Handling Qualities - AH-1G Helicopter Equipped with Three Hot Metal/Plume Infrared Suppressors by : Albert L. Winn

Download or read book Performance and Handling Qualities - AH-1G Helicopter Equipped with Three Hot Metal/Plume Infrared Suppressors written by Albert L. Winn and published by . This book was released on 1975 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The performance and handling qualities of the AH-1G helicopter were quantitatively and qualitatively evaluated with a standard exhaust duct and with Garrett, Lycoming, and Bell infrared suppressors installed. Twenty-one flights were flown for a total of 20.7 productive flight hours. The effectiveness of the suppressors themselves in reducing infrared radiation was not a part of this test.