Navy Virginia Class Attack Submarine Procurement

Download Navy Virginia Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781540348968
Total Pages : 48 pages
Book Rating : 4.3/5 (489 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Class Attack Submarine Procurement by : Ronald O'Rourke

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2016-11-11 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Navy Virginia Class Attack Submarine Procurement

Download Navy Virginia Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781545215166
Total Pages : 52 pages
Book Rating : 4.2/5 (151 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Class Attack Submarine Procurement by : Ronald O'Rourke

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2017-04-07 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25th and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Navy Virginia Ssn-774 - Class Attack Submarine Procurement

Download Navy Virginia Ssn-774 - Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : CreateSpace
ISBN 13 : 9781505903829
Total Pages : 38 pages
Book Rating : 4.9/5 (38 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Ssn-774 - Class Attack Submarine Procurement by : Congressional Research Service

Download or read book Navy Virginia Ssn-774 - Class Attack Submarine Procurement written by Congressional Research Service and published by CreateSpace. This book was released on 2014-12-19 with total page 38 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2015 are to be the 21st and 22nd boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2015 at $5,288.7 million or an average of $2,644.3 million each. The boats have received a total of $1,577.0 million in prior-year advance procurement (AP) funding and $158.4 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2015 budget requests the remaining $3,553.3 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2015 budget also requests $1,649.5 in AP funding and $680.8 million in EOQ funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2015 funding request for the program (excluding outfitting and post-delivery costs) to $5,883.6 million. EOQ funding is a common feature in the initial years of an MYP contract. The Navy's proposed FY2015 budget also requests $132.6 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 123 in the Navy's FY2015 research and development account. DOD and the Navy are considering whether to build Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy estimates that building Virginia-class boats with the VPM might increase their unit procurement costs by about 13%. It would increase the total number of torpedo-sized weapons (such as Tomahawks) that they could carry by about 76%. The Navy's FY2015 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under that plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2028-FY2030, and remain below 48 boats through FY2034.

Navy Virginia (Ssn-774) Class Attack Submarine Procurement

Download Navy Virginia (Ssn-774) Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : CreateSpace
ISBN 13 : 9781503000407
Total Pages : 34 pages
Book Rating : 4.0/5 (4 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia (Ssn-774) Class Attack Submarine Procurement by : O'Rourke

Download or read book Navy Virginia (Ssn-774) Class Attack Submarine Procurement written by O'Rourke and published by CreateSpace. This book was released on 2014-10-31 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Navy Virginia Class Attack Submarine Procurement

Download Navy Virginia Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781976514685
Total Pages : 60 pages
Book Rating : 4.5/5 (146 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Class Attack Submarine Procurement by : Congressional Research Service

Download or read book Navy Virginia Class Attack Submarine Procurement written by Congressional Research Service and published by Createspace Independent Publishing Platform. This book was released on 2017-09-18 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2018 are to be the 27th and 28th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2018 at $5,532.7 million, or an average of $2,766.4 million each. The boats have received a total of $1,647.0 million in prior-year "regular" advance procurement (AP) funding and $580.4 million in prior-year Economic Order Quantity (EOQ) AP funding. The Navy's proposed FY2018 budget requests the remaining $3,305.3 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2018 budget also requests $1,920.6 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2018 funding request for the program (excluding outfitting and post-delivery costs) to $5,225.9 million. The Navy plans to build one of the two Virginia-class boats scheduled to be procured in FY2019, and all Virginia-class boats procured in FY2020 and subsequent years, with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's proposed FY2018 budget requests $72.9 million in research and development funding for the Virginia Payload Module (VPM). The Navy's previous force-level goal was to achieve and maintain a 308-ship fleet, including 48 SSNs. The Navy's new force-level goal, released in December 2015, is to achieve and maintain a 355-ship fleet, including 66 SSNs. The Navy's FY2017 30-year shipbuilding plan was developed in association with the previous 308-ship force-level goal, and consequently does not include enough SSNs to achieve and maintain a force of 66 SSNs. CRS estimates that 19 SSNs would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. The Congressional Budget Office (CBO) estimates that 16 to 19 would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. Taking into account the capacity of the submarine construction industrial base and the Navy's current plan to also build Columbia (SSBN-826) class ballistic missile submarines in coming years, CRS and CBO estimate that the earliest a 66-boat SSN force could be achieved might be the mid- to late 2030s. From FY2025 to FY2036, the number of SSNs is projected to experience a dip or valley, reaching a minimum of 41 boats (i.e., 25 boats, or about 38%, less than the 66-boat force-level goal) in FY2029. This projected valley is a consequence of having procured a relatively small number of SSNs during the 1990s, in the early years of the post-Cold War era. Some observers are concerned that this projected valley in SSN force levels could lead to a period of heightened operational strain for the SSN force, and perhaps a period of weakened conventional deterrence against potential adversaries. The projected SSN valley was first identified by CRS in 1995 and has been discussed in CRS reports and testimony every year since then. The Navy has been exploring options for mitigating the projected valley. Procuring additional Virginia-class boats in the near term is one of those options. In that connection, the Navy has expressed interest in procuring an additional Virginia-class boat in FY2021. Congress also has the option of funding the procurement of one or more additional Virginia-class boats in FY2018-FY2020.

Navy Attack Submarine Procurement

Download Navy Attack Submarine Procurement PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437938345
Total Pages : 28 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Attack Submarine Procurement by : Ronald O'Rourke

Download or read book Navy Attack Submarine Procurement written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-04 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.

Navy Attack Submarine Procurement: Background and Issues for Congress

Download Navy Attack Submarine Procurement: Background and Issues for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 30 pages
Book Rating : 4.:/5 (318 download)

DOWNLOAD NOW!


Book Synopsis Navy Attack Submarine Procurement: Background and Issues for Congress by :

Download or read book Navy Attack Submarine Procurement: Background and Issues for Congress written by and published by . This book was released on 2008 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's proposed FY2009 budget requests $2,107.0 million to complete the procurement funding for an 11th Virginia (SSN-774) class nuclear-powered attack submarine (SSN). This boat has already received $756.0 million in prior-year advance procurement funding. The Navy's proposed FY2009 budget also requests $719.8 million in advance procurement funding for Virginia-class boats to be procured in future fiscal years, and $596.8 million in additional procurement funding for economic order quantity (EOQ) purchases of key components for eight Virginia-class submarines (the 11th boat and seven others) that are to be procured under a multiyear procurement (MYP) arrangement during the 5-year period FY2009-FY2013. As part of its action on the Navy's FY2008 shipbuilding budget, Congress added $588 million in advance procurement funding for an additional Virginia class submarine to be procured in a year prior to FY2012. The Navy, as part of its proposed FY2009 budget, included this additional submarine in its shipbuilding plan and scheduled it to be fully funded in FY2011. One issue for Congress for FY2009 is whether to accelerate the full funding of the newly added submarine from FY2011 to FY2010 or FY2009, so as to facilitate a follow-on option of funding an additional one or two Virginia-class submarines in FY2010 and/or FY2011. Supporters of this option could argue that it would mitigate a projected seven-boat shortfall in SSNs. Opponents could argue that it would place added pressure on the Navy's FY2009 budget and/or its FY2010 budget, making it more difficult for the Navy to fund other priorities in those years. This report will be updated as events warrant.

Navy Submarines

Download Navy Submarines PDF Online Free

Author :
Publisher : Nova Science Publishers
ISBN 13 : 9781634832366
Total Pages : 0 pages
Book Rating : 4.8/5 (323 download)

DOWNLOAD NOW!


Book Synopsis Navy Submarines by : Terry Coleman

Download or read book Navy Submarines written by Terry Coleman and published by Nova Science Publishers. This book was released on 2015 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437930573
Total Pages : 43 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.

SSN--688--class Submarine Procurement

Download SSN--688--class Submarine Procurement PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis SSN--688--class Submarine Procurement by : United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense

Download or read book SSN--688--class Submarine Procurement written by United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense and published by . This book was released on 1981 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:

The US Navy's Fast-Attack Submarines, Vol. 2

Download The US Navy's Fast-Attack Submarines, Vol. 2 PDF Online Free

Author :
Publisher : Schiffer Military History
ISBN 13 : 9780764359729
Total Pages : 0 pages
Book Rating : 4.3/5 (597 download)

DOWNLOAD NOW!


Book Synopsis The US Navy's Fast-Attack Submarines, Vol. 2 by : James C. Goodall

Download or read book The US Navy's Fast-Attack Submarines, Vol. 2 written by James C. Goodall and published by Schiffer Military History. This book was released on 2020-06-28 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Successors to the US Navy's Los Angeles-class fast-attack submarines (presented in volume 1), the Seawolf- and Virginia-class SSNs are presented here from their initial design and construction, through testing and trials, to current operations. From its debut in 1997, the nuclear-powered Seawolf (SSN-21) represented the lead ship of the deadliest submarine ever to be constructed for the USN during the Cold War. With the end of the Cold War, the Seawolf-class SSNs were limited to the three that were under construction at the time, and the program was terminated. With only three in the class, the supersecret USS Jimmy Carter (SSN-23) is virtually off limits to any and all photography. The author's unprecedented access onboard a Seawolf-class SSN--the USS Connecticut (SSN-22)--is a first for the Navy and provides exclusive coverage found only in this book. In place of the Seawolf class, the Virginia-class attack submarine is an advanced stealth, multimission nuclear-powered submarine for deep-ocean antisubmarine warfare and littoral (shallow water) operations.

Sustaining U.S. Nuclear Submarine Design Capabilities

Download Sustaining U.S. Nuclear Submarine Design Capabilities PDF Online Free

Author :
Publisher : Rand Corporation
ISBN 13 : 0833041606
Total Pages : 235 pages
Book Rating : 4.8/5 (33 download)

DOWNLOAD NOW!


Book Synopsis Sustaining U.S. Nuclear Submarine Design Capabilities by : John Frederic Schank

Download or read book Sustaining U.S. Nuclear Submarine Design Capabilities written by John Frederic Schank and published by Rand Corporation. This book was released on 2007 with total page 235 pages. Available in PDF, EPUB and Kindle. Book excerpt: For the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stret.

Navy Submarines

Download Navy Submarines PDF Online Free

Author :
Publisher :
ISBN 13 : 9781634832373
Total Pages : 95 pages
Book Rating : 4.8/5 (323 download)

DOWNLOAD NOW!


Book Synopsis Navy Submarines by : Terry Coleman

Download or read book Navy Submarines written by Terry Coleman and published by . This book was released on 2015 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.

Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program

Download Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program PDF Online Free

Author :
Publisher :
ISBN 13 : 9781701399518
Total Pages : 60 pages
Book Rating : 4.3/5 (995 download)

DOWNLOAD NOW!


Book Synopsis Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program by : Ronald O'Rourke

Download or read book Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program written by Ronald O'Rourke and published by . This book was released on 2019-10-21 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Columbia (SSBN-826) class program is a program to design and build a class of 12 new ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 aging Ohio-class SSBNs. The Navy has identified the Columbia-class program as the Navy's top priority program. The Navy wants to procure the first Columbia-class boat in FY2021. Research and development work on the program has been underway for several years, and advance procurement (AP) funding for the program began in FY2017. The Navy's proposed FY2020 budget requests $1,698.9 million in advance procurement (AP) funding and $533.1 million in research and development funding for the program. The Navy's FY2020 budget submission estimates the total procurement cost of the 12-ship class at $109.0 billion in then-year dollars. An April 2018 Government Accountability Office (GAO) report assessing selected major DOD weapon acquisition programs stated that the estimated total acquisition cost of the Columbia-class program is $102,075.3 million (about $102.1 billion) in constant FY2018 dollars, including $12,901.0 million (about $12.9 billion) in research and development costs and $89,174.3 million (about $89.2 billion) in procurement costs.

US Nuclear Submarines

Download US Nuclear Submarines PDF Online Free

Author :
Publisher : Bloomsbury Publishing
ISBN 13 : 1780963424
Total Pages : 76 pages
Book Rating : 4.7/5 (89 download)

DOWNLOAD NOW!


Book Synopsis US Nuclear Submarines by : Jim Christley

Download or read book US Nuclear Submarines written by Jim Christley and published by Bloomsbury Publishing. This book was released on 2012-01-20 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: The adoption of nuclear power revolutionized submarine design and means that vessels can stay underwater for months, trailing the enemy or training weapons on land targets from secret positions, “always there, never seen.” Jim Christley, a former submariner, explores here the influence of Admiral Hyman Rickover in cautiously introducing these stealthy machines of war, and frankly discusses the power and perils of using nuclear reactors at sea. Using unique and detailed artwork, he outlines the many evolving aspects of design within the submarine classes, from the very first nuclear submarine, USS Nautilus, to the classes under construction even now.

Attack Submarines

Download Attack Submarines PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Attack Submarines by : United States. General Accounting Office

Download or read book Attack Submarines written by United States. General Accounting Office and published by . This book was released on 1994 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Astute Class Nuclear Submarine Owners' Workshop Manual

Download Astute Class Nuclear Submarine Owners' Workshop Manual PDF Online Free

Author :
Publisher : Haynes Publishing UK
ISBN 13 : 9781785210716
Total Pages : 0 pages
Book Rating : 4.2/5 (17 download)

DOWNLOAD NOW!


Book Synopsis Astute Class Nuclear Submarine Owners' Workshop Manual by : Jonathan Gates

Download or read book Astute Class Nuclear Submarine Owners' Workshop Manual written by Jonathan Gates and published by Haynes Publishing UK. This book was released on 2018-06-05 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Astute-class is the largest, most advanced and most powerful attack submarine ever operated by the Royal Navy, combining world-leading sensors, design and weaponry in a versatile vessel. The submarines are nuclear-propelled and fuelled by a nuclear reactor powerful enough to supply a city the size of Southampton. Its advanced technology means the submarines will never need to be refuelled. They employ the latest technology such as the Sonar 2076 that detects the sound of enemy submarines using the largest number of hydrophones ever fitted to a submarine. Linked with powerful onboard electronics these provide the submarines with outstanding sensitivity. The Astute submarines are armed with the latest versions of Spearfish heavy-weight torpedoes and Tomahawk land-attack cruise missiles.