Navy Attack Submarine Procurement

Download Navy Attack Submarine Procurement PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437938345
Total Pages : 28 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Attack Submarine Procurement by : Ronald O'Rourke

Download or read book Navy Attack Submarine Procurement written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-04 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: Contents: (1) Intro.; (2) Background: Types of Sub¿s. in the U.S. Navy; Attack Sub. Force Levels; Virginia (SSN-774) Class Program; Past and Planned Procurement; Changes in Planned Procurement Rates; Joint Production Arrangement; Cost-Reduction Effort; Sub Construction Industrial Base; Design and Engin. (D&E) Portion; Projected SSN Shortfall; Navy Study on Options for Mitigating Projected Shortfall; (3) Issues for Congress: 48-Boat Force-Level Goal and Planned SSN Procurement; (4) Options for Congress; (5) Legislative Activity for FY 2010. Appendices: Past SSN Force-Level Goals; Views Regarding 48-Boat SSN Force-Level Goal; Options for Funding SSNs; Maintaining Sub. D&E Base. A print on demand pub.

Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress

Download Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 23 pages
Book Rating : 4.:/5 (713 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress by :

Download or read book Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress written by and published by . This book was released on 2010 with total page 23 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) at a rate of one per year for the past several years, and a total of 12 boats have been procured through FY2010. The Navy's proposed FY2011 budget increases the procurement rate to two boats per year. The eight boats to be procured in the five-year period FY2009-FY2013 (boats 11 through 18) are being procured under a multiyear procurement (MYP) arrangement. The Navy's proposed FY2011 budget requests $3,441.5 million in procurement funding to complete the procurement cost of the 13th and 14th Virginia-class boats. The FY2011 budget estimates the combined procurement cost of these two boats at $5,344.4 million, and the boats have received a total of $1,903.0 million in prior-year advance procurement (AP) and Economic Order Quantity (EOQ) funding. The Navy's proposed FY2011 budget also requests $1,436.8 million in AP funding for Virginia-class boats to be procured in future years, and $254.4 million in Economic Order Quantity (EOQ) purchases of long-leadtime items for Virginia-class boats to be procured under the FY2009-FY2013 MYP arrangement.

Navy Attack Submarine Procurement: Background and Issues for Congress

Download Navy Attack Submarine Procurement: Background and Issues for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 30 pages
Book Rating : 4.:/5 (318 download)

DOWNLOAD NOW!


Book Synopsis Navy Attack Submarine Procurement: Background and Issues for Congress by :

Download or read book Navy Attack Submarine Procurement: Background and Issues for Congress written by and published by . This book was released on 2008 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's proposed FY2009 budget requests $2,107.0 million to complete the procurement funding for an 11th Virginia (SSN-774) class nuclear-powered attack submarine (SSN). This boat has already received $756.0 million in prior-year advance procurement funding. The Navy's proposed FY2009 budget also requests $719.8 million in advance procurement funding for Virginia-class boats to be procured in future fiscal years, and $596.8 million in additional procurement funding for economic order quantity (EOQ) purchases of key components for eight Virginia-class submarines (the 11th boat and seven others) that are to be procured under a multiyear procurement (MYP) arrangement during the 5-year period FY2009-FY2013. As part of its action on the Navy's FY2008 shipbuilding budget, Congress added $588 million in advance procurement funding for an additional Virginia class submarine to be procured in a year prior to FY2012. The Navy, as part of its proposed FY2009 budget, included this additional submarine in its shipbuilding plan and scheduled it to be fully funded in FY2011. One issue for Congress for FY2009 is whether to accelerate the full funding of the newly added submarine from FY2011 to FY2010 or FY2009, so as to facilitate a follow-on option of funding an additional one or two Virginia-class submarines in FY2010 and/or FY2011. Supporters of this option could argue that it would mitigate a projected seven-boat shortfall in SSNs. Opponents could argue that it would place added pressure on the Navy's FY2009 budget and/or its FY2010 budget, making it more difficult for the Navy to fund other priorities in those years. This report will be updated as events warrant.

Navy Virginia Class Attack Submarine Procurement

Download Navy Virginia Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781540348968
Total Pages : 48 pages
Book Rating : 4.3/5 (489 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Class Attack Submarine Procurement by : Ronald O'Rourke

Download or read book Navy Virginia Class Attack Submarine Procurement written by Ronald O'Rourke and published by Createspace Independent Publishing Platform. This book was released on 2016-11-11 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2017 are to be the 25 and 26th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2017 at $5,408.9 million, or an average of $2,704.5 million each. The boats have received a total of $1,623.3 million in prior-year advance procurement (AP) funding and $597.6 million in prior-year Economic Order Quantity (EOQ) funding. The Navy's proposed FY2017 budget requests the remaining $3,188.0 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2017 budget also requests $1,767.2 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2017 funding request for the program (excluding outfitting and post-delivery costs) to $4,955.2 million. The Navy's proposed FY2017 budget also requests $97.9 million in research and development funding for the Virginia Payload Module (VPM). The funding is contained in Program Element (PE) 0604580N, entitled Virginia Payload Module (VPM), which is line 128 in the Navy's FY2017 research and development account. The Navy plans to build some of the Virginia-class boats procured in FY2019 and subsequent years with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's FY2017 30-year SSN procurement plan, if implemented, would not be sufficient to maintain a force of 48 SSNs consistently over the long run. The Navy projects under the plan that the SSN force would fall below 48 boats starting in FY2025, reach a minimum of 41 boats in FY2029, and remain below 48 boats through FY2036. Potential issues for Congress regarding the Virginia-class program include whether to procure an additional Virginia-class boat in FY2021 and, more generally, the Virginia-class procurement rate in coming years.

Navy Virginia (Ssn-774) Class Attack Submarine Procurement

Download Navy Virginia (Ssn-774) Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : CreateSpace
ISBN 13 : 9781503000407
Total Pages : 34 pages
Book Rating : 4.0/5 (4 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia (Ssn-774) Class Attack Submarine Procurement by : O'Rourke

Download or read book Navy Virginia (Ssn-774) Class Attack Submarine Procurement written by O'Rourke and published by CreateSpace. This book was released on 2014-10-31 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2014 budget requested $5,285.3 million in procurement and advance procurement (AP) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base.

Navy Virginia (Ssn-774) Class Attack Submarine Procurement

Download Navy Virginia (Ssn-774) Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : CreateSpace
ISBN 13 : 9781508709138
Total Pages : 28 pages
Book Rating : 4.7/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia (Ssn-774) Class Attack Submarine Procurement by : Congressional Research Service

Download or read book Navy Virginia (Ssn-774) Class Attack Submarine Procurement written by Congressional Research Service and published by CreateSpace. This book was released on 2015-06-26 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2015 are to be the 21st and 22nd boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract.

Navy Virginia Class Attack Submarine Procurement

Download Navy Virginia Class Attack Submarine Procurement PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781976514685
Total Pages : 60 pages
Book Rating : 4.5/5 (146 download)

DOWNLOAD NOW!


Book Synopsis Navy Virginia Class Attack Submarine Procurement by : Congressional Research Service

Download or read book Navy Virginia Class Attack Submarine Procurement written by Congressional Research Service and published by Createspace Independent Publishing Platform. This book was released on 2017-09-18 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines since FY1998. The two Virginia-class boats requested for procurement in FY2018 are to be the 27th and 28th boats in the class. The 10 Virginia-class boats programmed for procurement in FY2014-FY2018 (two per year for five years) are being procured under a multiyear-procurement (MYP) contract. The Navy estimates the combined procurement cost of the two Virginia-class boats requested for procurement in FY2018 at $5,532.7 million, or an average of $2,766.4 million each. The boats have received a total of $1,647.0 million in prior-year "regular" advance procurement (AP) funding and $580.4 million in prior-year Economic Order Quantity (EOQ) AP funding. The Navy's proposed FY2018 budget requests the remaining $3,305.3 million needed to complete the boats' estimated combined procurement cost. The Navy's proposed FY2018 budget also requests $1,920.6 million in AP funding for Virginia-class boats to be procured in future fiscal years, bringing the total FY2018 funding request for the program (excluding outfitting and post-delivery costs) to $5,225.9 million. The Navy plans to build one of the two Virginia-class boats scheduled to be procured in FY2019, and all Virginia-class boats procured in FY2020 and subsequent years, with an additional mid-body section, called the Virginia Payload Module (VPM), that contains four large-diameter, vertical launch tubes that the boats would use to store and fire additional Tomahawk cruise missiles or other payloads, such as large-diameter unmanned underwater vehicles (UUVs). The Navy's proposed FY2018 budget requests $72.9 million in research and development funding for the Virginia Payload Module (VPM). The Navy's previous force-level goal was to achieve and maintain a 308-ship fleet, including 48 SSNs. The Navy's new force-level goal, released in December 2015, is to achieve and maintain a 355-ship fleet, including 66 SSNs. The Navy's FY2017 30-year shipbuilding plan was developed in association with the previous 308-ship force-level goal, and consequently does not include enough SSNs to achieve and maintain a force of 66 SSNs. CRS estimates that 19 SSNs would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. The Congressional Budget Office (CBO) estimates that 16 to 19 would need to be added to the FY2017 30-year shipbuilding plan to achieve and maintain a 66-boat SSN force. Taking into account the capacity of the submarine construction industrial base and the Navy's current plan to also build Columbia (SSBN-826) class ballistic missile submarines in coming years, CRS and CBO estimate that the earliest a 66-boat SSN force could be achieved might be the mid- to late 2030s. From FY2025 to FY2036, the number of SSNs is projected to experience a dip or valley, reaching a minimum of 41 boats (i.e., 25 boats, or about 38%, less than the 66-boat force-level goal) in FY2029. This projected valley is a consequence of having procured a relatively small number of SSNs during the 1990s, in the early years of the post-Cold War era. Some observers are concerned that this projected valley in SSN force levels could lead to a period of heightened operational strain for the SSN force, and perhaps a period of weakened conventional deterrence against potential adversaries. The projected SSN valley was first identified by CRS in 1995 and has been discussed in CRS reports and testimony every year since then. The Navy has been exploring options for mitigating the projected valley. Procuring additional Virginia-class boats in the near term is one of those options. In that connection, the Navy has expressed interest in procuring an additional Virginia-class boat in FY2021. Congress also has the option of funding the procurement of one or more additional Virginia-class boats in FY2018-FY2020.

SSN-688-class Submarine Procurement

Download SSN-688-class Submarine Procurement PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.0/5 ( download)

DOWNLOAD NOW!


Book Synopsis SSN-688-class Submarine Procurement by : United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense

Download or read book SSN-688-class Submarine Procurement written by United States. Congress. Senate. Committee on Appropriations. Subcommittee on Department of Defense and published by . This book was released on 1981 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437930573
Total Pages : 43 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: This is a print on demand edition of a hard to find publication. Contents: (1) Introduction; (2) Background: Proposed 313-Ship Fleet; FY 2010 Shipbuilding Request; (3) Oversight Issues for Congress: Adequacy of Proposed 313-Ship Fleet: Adequacy of Shipbuilding Plan for Maintaining 313 Ships; Shortfalls Relative to 313-Ship Goals; Affordability of Shipbuilding Plan; (4) Legislative Activity for FY 2010: FY 2010 Defense Authorization Act; FY 2010 DoD Appropriations Act; Resolution Directing Submission of FY 2010 30-Year Shipbuilding Plan; Legislation on Individual Shipbuilding Programs. Appendixes: (A) December 2009 Press Reports About Draft FY 2011 30-Year Shipbuilding Plan; (B) Adequacy of Planned 313-Ship Fleet; (C) Size of the Navy and Navy Shipbuilding Rate. Charts and tables.

New Attack Submarine

Download New Attack Submarine PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 146 pages
Book Rating : 4.0/5 (18 download)

DOWNLOAD NOW!


Book Synopsis New Attack Submarine by : United States. Congress. House. Committee on National Security. Subcommittee on Military Procurement

Download or read book New Attack Submarine written by United States. Congress. House. Committee on National Security. Subcommittee on Military Procurement and published by . This book was released on 1996 with total page 146 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Navy Large Unmanned Surface and Undersea Vehicles

Download Navy Large Unmanned Surface and Undersea Vehicles PDF Online Free

Author :
Publisher :
ISBN 13 : 9781075833274
Total Pages : 30 pages
Book Rating : 4.8/5 (332 download)

DOWNLOAD NOW!


Book Synopsis Navy Large Unmanned Surface and Undersea Vehicles by : Ronald O'Rourke

Download or read book Navy Large Unmanned Surface and Undersea Vehicles written by Ronald O'Rourke and published by . This book was released on 2019-06-24 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437919596
Total Pages : 43 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2010-03 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

The United States Navy

Download The United States Navy PDF Online Free

Author :
Publisher : Nova Publishers
ISBN 13 : 9781590336618
Total Pages : 214 pages
Book Rating : 4.3/5 (366 download)

DOWNLOAD NOW!


Book Synopsis The United States Navy by : Ronald O'Rourke

Download or read book The United States Navy written by Ronald O'Rourke and published by Nova Publishers. This book was released on 2003 with total page 214 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book examines the burning issues facing today's Navy and Congress. Although rapid progress in aircraft and bombing technology has caused some to question the viability of naval warfare, the role of the navy has actually grown. The Navy is able to move an astonishing amount of firepower to any corner of the globe and once there, project formidable threats or punishing misery on an opposing power. The navy has shown that it can adapt to a new world. The book also includes an important history of the US Navy. Contents: Preface: Unmanned Vehicles for US Naval Forces: Background; Navy LHD-8 Amphibious Assault Ship: Background; Navy Littoral Ship (LCS): Background; Navy Trident Submarine Conversion (SSGN) Program: Background; Navy Amphibious Shipbuilding Programs: Background; Navy Zumwalt (DD-21) Class Destroyer Program: Background; Navy DD-21 Land Attack Destroyer Program; Navy DD(X) Future Surface Combatant Program: Background; Navy CVNX Aircraft Carrier Program: Background; Navy Aircraft Carrier Procurement: CVN-77 'Smart Buy' Proposal; Navy New Attack Submarine (NSSN) Program: Is It Affordable?; Navy Attack Submarine Programs: Background; The Navy/DARPA Arsenal Ship Program; Ind

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 59 pages
Book Rating : 4.:/5 (15 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by . This book was released on 2005 with total page 59 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy in February 2006 proposed to maintain in coming years a fleet of 313 ships, including, among other things, 11 aircraft carriers, 48 attack submarines (SSNs), 88 cruisers and destroyers, 55 Littoral Combat Ships (LCSs), 31 amphibious ships, and a Maritime Prepositioning Force (Future), or MPF(F), squadron with 12 new-construction amphibious and sealift-type ships. The Navy says that for its shipbuilding plans to be affordable and executable, the Navy needs to control certain non-shipbuilding expenditures and build ships within estimated costs. The Navy's shipbuilding plans raise potential issues regarding the shipbuilding industrial base, particularly in the areas of the submarine design and engineering base, and the surface combatant construction base.

Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program

Download Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program PDF Online Free

Author :
Publisher :
ISBN 13 : 9781701399518
Total Pages : 60 pages
Book Rating : 4.3/5 (995 download)

DOWNLOAD NOW!


Book Synopsis Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program by : Ronald O'Rourke

Download or read book Navy Columbia (SSBN-826) Class Ballistic Missile Submarine Program written by Ronald O'Rourke and published by . This book was released on 2019-10-21 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Columbia (SSBN-826) class program is a program to design and build a class of 12 new ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 aging Ohio-class SSBNs. The Navy has identified the Columbia-class program as the Navy's top priority program. The Navy wants to procure the first Columbia-class boat in FY2021. Research and development work on the program has been underway for several years, and advance procurement (AP) funding for the program began in FY2017. The Navy's proposed FY2020 budget requests $1,698.9 million in advance procurement (AP) funding and $533.1 million in research and development funding for the program. The Navy's FY2020 budget submission estimates the total procurement cost of the 12-ship class at $109.0 billion in then-year dollars. An April 2018 Government Accountability Office (GAO) report assessing selected major DOD weapon acquisition programs stated that the estimated total acquisition cost of the Columbia-class program is $102,075.3 million (about $102.1 billion) in constant FY2018 dollars, including $12,901.0 million (about $12.9 billion) in research and development costs and $89,174.3 million (about $89.2 billion) in procurement costs.

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Download Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 28 pages
Book Rating : 4.:/5 (318 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress by :

Download or read book Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress written by and published by . This book was released on 2008 with total page 28 pages. Available in PDF, EPUB and Kindle. Book excerpt: In February 2008, as part of its proposed FY2009 budget, the Navy submitted to Congress the FY2009 version of its annual 30-year shipbuilding plan. The 30-year plan is intended to support the Navy's goal of achieving and maintaining a 313-ship fleet. The Navy first presented the 313-ship plan to Congress in February 2006. The increase in the Navy's estimated cost for implementing the plan is so large that the Navy no longer appears to have a clearly identifiable, announced strategy for generating the funds needed to implement the 30-year plan, at least not without significantly reducing funding for other Navy programs or increasing the Navy's programmed budget in coming years by billions of dollars per year. Concerns about the Navy's prospective ability to afford the 30-year shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to strong concerns among some Members about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. As a consequence of these strong concerns, some Members in hearings this year on the Navy's proposed FY2009 budget have strongly criticized aspects of the Navy's shipbuilding plan and indicated that they are considering making changes to the plan. Some Members in the House, for example, have indicated that they are considering the option of not procuring a third DDG-1000 class destroyer in FY2009, as the Navy has requested, and using the funding programmed for that ship to instead procure other kinds of ships for the Navy. This report will be updated as events warrant.

Navy Submarines

Download Navy Submarines PDF Online Free

Author :
Publisher : Nova Science Publishers
ISBN 13 : 9781634832366
Total Pages : 0 pages
Book Rating : 4.8/5 (323 download)

DOWNLOAD NOW!


Book Synopsis Navy Submarines by : Terry Coleman

Download or read book Navy Submarines written by Terry Coleman and published by Nova Science Publishers. This book was released on 2015 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Navy operates three types of submarines- nuclear-powered ballistic missile submarines (SSBNs), nuclear-powered cruise missile and special operations forces (SOF) submarines (SSGNs), and nuclear-powered attack submarines (SSNs). This book provides background information and issues for Congress on the Virginia-class SSN program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. Furthermore, this book provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Ohio replacement program is also known as the SSBN(X) program. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. The Navy has identified the Ohio replacement program as its top priority program.