National Program for Inspection of Non-Federal Dams. Muddy Cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Muddy Cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 75 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Muddy Cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Muddy Cove Pond Dam (MA 00793) Taunton River Basin, Dighton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: Muddy Cove Pond Dam is approximately 985 feet long including the spillway and has a maximum height of approximately 32 feet. It consists of an embankment with riprap wave protection on the upstream face and a loamed and seeded crest and downstream face. The spillway is located approximately two thirds of the distance across the dam from the left abutment. The facility is considered in good condition. There are no obvious signs of impending failure or conditions which would warrant urgent remedial measures. The estimated test flood stage is about 2.7 feet below the spillway abutments. An investigation is recommended to evaluate the observed seepage at the toe of the dam embankment. Recommended remedial measures include the removal of brush from riprap and along spillway walls, restoration of eroded areas along spillway walls and gatehouse, filling of animal burrows, the monitoring of riprap erosion and seepage at embankment toe, and maintenance of the gatehouse door and reservoir sluice gate.

National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: Falls Pond Dam is an earthfill dam with a vertical stone masonry wall on the downstream face. The dam is a maximum 19 feet high and 185 feet long including main and auxiliary spillways at the south abutment. The main spillway is separated into three bays, each 15 feet long and controlled by a steel tainter gate. The auxiliary spillway is located adjacent to the main spillway and is ungated. Generally, the dam is i fair condition. Th following are deficiencies and visible signs of distress at the site: lack of a low-level outlet for draining the pond; deterioration of the downstream stone masonry wall; slight seepage through a crack on the auxiliary spillway, and at the toe of the main spillway; spalled concrete on both spillways; missing and dislodged riprap on the upstream face of the dam; trees growing on the embankment; and the accumulation of debris on the spillways and in the discharge channel. An outflow test flood of 7,010 cfs will overtop the dam by 3.1 feet. The spillways have the capacity to discharge 55 percent of the test flood before the dam is overtopped.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1224 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985 with total page 1224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a former mill pond dam about 330 ft. long. It has a maximum height of about 8 ft. Past inspection records and the lack of operating and maintenance procedures, there are several deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It is small in size with a hazard potential of high.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1022 pages
Book Rating : 4.:/5 (89 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1022 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Thirty Acre Pond Dam is an earthen dam about 600 ft. long and 13 ft. high. The dam is in fair condition. The dam is considered to be small in size and has a high hazard potential. The spillway test flood selected is Probable Maximum Flood. Investigations are recommended to check the adequacy of the structure under seismic loading, etc.

National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 66 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a 120 ft. long spillway which was originally built in 1932. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It has been classified as small in size with a hazard potential of high. A test flood equal to one half the probable maximum flood. Recommendations were presented for constructing additional spillway capacity at both Morey's Bridge and Mill River dams. These recommendations have not been implemented.

National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 86 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Porter Dam is an ill-defined earth embankment about 200 ft. long with a maximum height of about 12 ft. and a top width averageing 15 ft. The dam appears to be in fair condition. With a classification size of small and a hazard potential of significant, the recommended range for test flood is 1/2 of the Probable Maximum Flood. The owner should implement various operational and maintenance procedures.

National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Longwater Pond Dam is a 200-foot long, 10-foot high earth dam. The upstream face of the dam is a vertical concrete wall with earth fill at the toe, and the downstream face is a vertical stone masonry wall. The outlet works consist of a central outlet plus a side channel spillway located to the right of the outlet. The intake to the central outlet is 7 feet by 7.5 feet and controlled by a dual set of stoplogs. The crest of the side channel spillway is 1 foot wide, 85 feet long and 6 feet wide. There are deficiencies which must be corrected to assure the continued performance of this dam. The following signs of distress were noted at the site: absence of riprap on the upstream slope of the dam below the concrete wall; uncompacted earth fill adjacent to the left abutment of the outlet; scoured and eroded concrete on the outlet works; and spalling on the crest of the side channel spillway; cracking and local depressions in the pavement on the crest of the dam. The stoplogs were replaced shortly after the inspection, and the pond level returned on a higher elevation. At a second visit to the site, seepage was noted through the crest of the spillway. The spillway can discharge 50 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 133 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 976 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1985 with total page 976 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Chartley Pond Dam (MA 00814), Taunton River Basin, Norton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Chartley Pond Dam (MA 00814), Taunton River Basin, Norton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 65 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Chartley Pond Dam (MA 00814), Taunton River Basin, Norton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Chartley Pond Dam (MA 00814), Taunton River Basin, Norton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chartley Pond Dam is a 200-foot long 10-foot high earthfill dam built in the 1800's. A two-lane paved roadway is the crest of the dam while the downstream face includes a concrete wall and portions of the foundations for two structures. The embankment is in good condition but minor maintenance is required. Water discharges through a small outlet controlled by stop logs. An outlet at the dam for a water wheel is blocked and abandoned. An outlet controlled by removable stop logs functions as the spillway for the dam. Hydraulic analyses indicate that the outlet can discharge a flow of 1;70 cfs before overtopping the dam at El 105.6. This discharge represents 14 percent of the outflow test flood test flood discharge of 1,230 cfs. The outflow test flood which crests at EL 107.3 will overtop the dam by 1.7 feet. Draining the pond to El 96.5 prior to the outflow test flood will not appreciably reduce the amount of overtoping. The outlet cannot pass the test flood even with all stop logs removed, and overtopping of 1.2 feet will occur.

National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00113), Thames River Basin, Dudley, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00113), Thames River Basin, Dudley, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 101 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00113), Thames River Basin, Dudley, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00113), Thames River Basin, Dudley, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: New Pond dam consists of two earthen embankments, one to the north and one to the south of the access road to the dam. The southerly embankment, considered the main dam, contains a masonry spillway and an abandoned outlet works. The northerly embankment is considered a separate dike. Each of the embankments is approximately 400 feet long. The dam has a height of approximately 20 feet, while the dike has a height of approximately 12 feet. The structures are in fair condition. The embankments are heavily overgrown with trees and bush. Seepage or evidence of seepage was observed at both embankments. The outlet structure, which serves as the reservoir drain, is inoperative. Hydraulic analysis indicates the test flood outflow at the dam would be approximately 580 cfs. The spillway can only pass approximately 17 percent of the test flood before overtopping of the embankments would occur. At test flood peak discharge, the average height of water overtopping the dam and dike would be approximately four inches.

National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 53 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a gravel and clay fill embankment about 340 feet long with a maximum height of about 11 feet and a top width averaging 80 feet. The dam appears to be in fair condition. The upstream slope and crest are well maintained. It has a classification of small in size and a significant hazard potential. The owner should retain the services of a registered professional engineer for various purposes.

National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 103 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 89 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Pond Dam is an earthfill embankment with a maximum height of about 10 feet and a relatively straight crest about 225 feet long, averaging about 20 feet wide. The dam is considered to be in good condition. The dam is classified as small in size with a significant hazard potential.

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: