National Dam Safety Program. Upper Fulton Dam (Inventory Number NY 408). Oswego River Basin, Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. Upper Fulton Dam (Inventory Number NY 408). Oswego River Basin, Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 180 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Fulton Dam (Inventory Number NY 408). Oswego River Basin, Oswego County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Upper Fulton Dam (Inventory Number NY 408). Oswego River Basin, Oswego County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1979 with total page 180 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam. Computations prepared according to the Corps of Engineers' Screening Criteria establish the spillway capacity of 50,000 cfs at 61% of the PMF, with PMF and 1/2 PMF flows at 81,900 cfs and 46,800 cfs respectively. The spillway has been determined to be inadequate to pass the PMF. However, the spillway is not considered seriously inadequate, based on the Corps of Engineers' Screening criteria, since the dam is capable of passing the 1/2 PMF without being overtopped.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 204 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1980 with total page 204 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Oswego River Basin, Upper Fulton Dam, Oswego County, New York, Inventory No. NY 408

Download Oswego River Basin, Upper Fulton Dam, Oswego County, New York, Inventory No. NY 408 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (364 download)

DOWNLOAD NOW!


Book Synopsis Oswego River Basin, Upper Fulton Dam, Oswego County, New York, Inventory No. NY 408 by : United States. Army. Corps of Engineers. New York District

Download or read book Oswego River Basin, Upper Fulton Dam, Oswego County, New York, Inventory No. NY 408 written by United States. Army. Corps of Engineers. New York District and published by . This book was released on 1979 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government reports annual index

Download Government reports annual index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1120 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government reports annual index by :

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1120 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lower Fulton Dam (Granby)(Inventory Number NY406). Oswego River Basin, Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. Lower Fulton Dam (Granby)(Inventory Number NY406). Oswego River Basin, Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 171 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lower Fulton Dam (Granby)(Inventory Number NY406). Oswego River Basin, Oswego County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Lower Fulton Dam (Granby)(Inventory Number NY406). Oswego River Basin, Oswego County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1979 with total page 171 pages. Available in PDF, EPUB and Kindle. Book excerpt: Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam. Additional structural investigations should be initiated and completed within one year concerning the stability and through-the-dam seepage. The remaining deficiencies requiring remedial work should be completed within the next construction season. The following improvement needs have been identified: (1) Repair the spillway slab and verify the structural integrity of the spillway section. (2) Investigate the interior of the dam to evaluate the condition of the old masonry dam, to refine the stability analysis and to evaluate the severity of through-the-dam seepage. (3) Repair the abutment walls which are severly eroded at the water line. (4) Repair the mechanical equipment which operates the sluice gates. (5) Investigate the structural integrity and repair the lock walls, particularly where the walls are attached to or adjacent to the spillway or where a hazard potential related to loss of life or property is presented.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 706 pages
Book Rating : 4.0/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1980 with total page 706 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Dam Number 5 (Minetto) (Inventory Number NY 402), Oswego River Basin, Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. Dam Number 5 (Minetto) (Inventory Number NY 402), Oswego River Basin, Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 164 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dam Number 5 (Minetto) (Inventory Number NY 402), Oswego River Basin, Oswego County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Dam Number 5 (Minetto) (Inventory Number NY 402), Oswego River Basin, Oswego County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1979 with total page 164 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam.

National Dam Safety Program. Sixmile Creek Dam (Inventory Number N.Y. 395), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report

Download National Dam Safety Program. Sixmile Creek Dam (Inventory Number N.Y. 395), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 96 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Sixmile Creek Dam (Inventory Number N.Y. 395), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report by : George P. Fulton

Download or read book National Dam Safety Program. Sixmile Creek Dam (Inventory Number N.Y. 395), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report written by George P. Fulton and published by . This book was released on 1981 with total page 96 pages. Available in PDF, EPUB and Kindle. Book excerpt: Visual inspection of the dam did not reveal any conditions which constitute an immediate hazard to human life or property. However, several deficiencies were noted which should be evaluated and remedied. The most serious deficiency was a lack of a safe, suitable access to the operating mechanism for the low-level outlet. In the event of an emergency at the dam, it would be extremely difficult to dewater the reservoir under present conditions. The hydrologic/hydraulic analysis performed indicates that the spillway does not have sufficient capacity to discharge the peak outflow from storms exceeding 7.5 percent of the Probable Maximum Flood (PMF). Since the spillway already extends across the full width of the gorge, there is no way to effectively increase its length or capacity. In addition, it should be noted that even if the dam did not exist, downstream flooding would occur during large storm events due to the configuration of the bedrock channel.

National Dam Safety Program. Curved Dam-Lock 7 (Inventory Number NY 398). Oswego River Basin, Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. Curved Dam-Lock 7 (Inventory Number NY 398). Oswego River Basin, Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 185 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Curved Dam-Lock 7 (Inventory Number NY 398). Oswego River Basin, Oswego County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Curved Dam-Lock 7 (Inventory Number NY 398). Oswego River Basin, Oswego County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1979 with total page 185 pages. Available in PDF, EPUB and Kindle. Book excerpt: Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additional studies should be undertaken to further evaluate conditions affecting the dam. 1. Within one year of notification, complete the following investigations: a. Perform a detailed investigation including subsurface investigations to determine the extent of and method of repair for through-the-dam and under-the-dam seepage. 2. After the aforementioned investigations, the remaining deficiencies requiring remedial work should be completed within the next construction season. The following improvement needs have been identified: a. Repair seepage and leaks through and beneath the dam. b. Repair the masonry in the east abutment wall. Align the masonry units and replace the missing masonry unit. c. Repair the boil located in a land area along the riverside wall of the navigation channel.

National Dam Safety Program. Potters Falls Dam (Inventory Number N.Y. 378), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report

Download National Dam Safety Program. Potters Falls Dam (Inventory Number N.Y. 378), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potters Falls Dam (Inventory Number N.Y. 378), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report by : George P. Fulton

Download or read book National Dam Safety Program. Potters Falls Dam (Inventory Number N.Y. 378), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report written by George P. Fulton and published by . This book was released on 1981 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: Visual inspection of this dam and engineering analyses which have been performed revealed that several deficiencies exist on this structure. The worst of these deficiencies was the localized spalling and erosion of the gunite covering the dam. This was observed in three areas on the downstream face and toe. A more thorough examination of the gunite when there is no discharge over the spillway is needed to evaluate the extent and cause of this deterioration. If the gunite is not repaired, the interior concrete of the dam will become exposed to erosion. Using the Corps of Engineer's Guidelines for the initial review of spillway adequacy, it has been determined that the structure would be overtopped by all storms exceeding 31 percent of the Probable Maximum Flood (PMF). During a one-half PMF storm, the abutments of the dam would be overtopped by 3.4 feet. The dam is a concrete arch-gravity structure with bedrock at both abutments. While overtopping is not likely to induce failure from erosion, a stability analysis indicates that the factor of safety is below the recommended level during the one-half PMF storm. If the dam were to fail, it would increase the degree of flooding in downstream residential areas. Therefore, the spillway is assessed as seriously inadequate.

National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 167 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. High Dam-Lock 6, Inventory Number (NY 401), Oswego River Basin, Oswego County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1979 with total page 167 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. However, additonal studies should be undertaken to further evaluate conditions affecting the dam. (1) Within one year of notification, complete the following investigations: (a) Perform a detailed investigation of the cracked and eroded concrete wall at the eastern portion of the intake structure which forms the western spillway abutment; and (b) Perform investigations to determine the effect of the deteriorated spillway surface concrete on the structural stability of the dam. (2) The following improvement needs have been investigated: (a) Repair the western abutment wall at the eastern portion of the intake structure that has been identified as severely eroded and cracked; (b) Repair the spillway surface which is severely eroded on the downstream face of the dam; (c) Repair the mechanical equipment supports, particularly those adjacent to the spillway abutment; and (d) Repair or verify the structural integrity of the lock walls, particularly where they affect the integrity of the dam abutment.

National Dam Safety Program. Onondaga Dam (Inventory Number NY 794), Oswego River Basin, Onondaga County, New York. Phase I Inspection Report

Download National Dam Safety Program. Onondaga Dam (Inventory Number NY 794), Oswego River Basin, Onondaga County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 226 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Onondaga Dam (Inventory Number NY 794), Oswego River Basin, Onondaga County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Onondaga Dam (Inventory Number NY 794), Oswego River Basin, Onondaga County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1981 with total page 226 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Onondaga Dam is located on Onondaga Creek in the Town of Lafayette, Onondaga County, New York, approximately 13.2 miles upstream from Onondaga Lake. The dam is used as a flood protection facility for the City of Syracuse. The visual inspection revealed that the embankment is in good condition and has been properly maintained throughout its life. No conditions were detected which might indicate instability of the structure. The surficial cracking of the exposed concrete of the spillway structure indicates that more serious spalling may soon occur. A protective coating designed to protect the structure from penetration of moisture into the concrete surfaces would serve to slow the spalling process and preserve the concrete in its present condition. This coating should be undertaken in the course of standard maintenance procedures.

National Dam Safety Program. Punch Bowl Dam (Inventory Number N.Y. 1343), Oswego River Basin, Schuyler County, New York. Phase I Inspection Report

Download National Dam Safety Program. Punch Bowl Dam (Inventory Number N.Y. 1343), Oswego River Basin, Schuyler County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Punch Bowl Dam (Inventory Number N.Y. 1343), Oswego River Basin, Schuyler County, New York. Phase I Inspection Report by : Lawrence D. Andersen

Download or read book National Dam Safety Program. Punch Bowl Dam (Inventory Number N.Y. 1343), Oswego River Basin, Schuyler County, New York. Phase I Inspection Report written by Lawrence D. Andersen and published by . This book was released on 1981 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Based on the evaluation of the existing conditions, the condition of the Punch Bowl Dam is considered to be good. The examination of documents and the visual observations did not reveal conditions which constitute a hazard to human life or property. The spillway capacity was evaluated according to the recommended procedure and the dam was found to pass 100 percent of the Probable Maximum Flood (PMF) without significantly affecting the stability of the dam. Therefore, the spillway capacity is rated as adequate. (Author).

National Dam Safety Program. Rome City Dam (Fish Creek) (Inventory Number Ny-558) Oswego River Basin. Lewis County, New York. Phase I Inspection Report

Download National Dam Safety Program. Rome City Dam (Fish Creek) (Inventory Number Ny-558) Oswego River Basin. Lewis County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 157 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Rome City Dam (Fish Creek) (Inventory Number Ny-558) Oswego River Basin. Lewis County, New York. Phase I Inspection Report by : John B. Stetson

Download or read book National Dam Safety Program. Rome City Dam (Fish Creek) (Inventory Number Ny-558) Oswego River Basin. Lewis County, New York. Phase I Inspection Report written by John B. Stetson and published by . This book was released on 1980 with total page 157 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. The examination of documents and visual inspection of the dam and appurtenant structures did not reveal conditions which constitute an immediate hazard to human life or property. The dam, however, has a number of problem areas which require further surveillance and remedial work.

National Dam Safety Program. Keuka Lake Outlet Dam (Inventory Number NY 390), Oswego River Basin, Yates County, New York. Phase 1 Inspection Report

Download National Dam Safety Program. Keuka Lake Outlet Dam (Inventory Number NY 390), Oswego River Basin, Yates County, New York. Phase 1 Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 112 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Keuka Lake Outlet Dam (Inventory Number NY 390), Oswego River Basin, Yates County, New York. Phase 1 Inspection Report by :

Download or read book National Dam Safety Program. Keuka Lake Outlet Dam (Inventory Number NY 390), Oswego River Basin, Yates County, New York. Phase 1 Inspection Report written by and published by . This book was released on 1980 with total page 112 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Examination of available documents and a visual inspection of the dam did not reveal conditions which constitute an immediate hazard to human life or property. Several deficiencies were noted and these should be corrected within 6 months of the date of the final approval of this report. Among the other actions which should be taken are repairing concrete on the post supporting the northern slide gate, filling the small scoured areas behind the sheet pile wall and monitoring the leakage through the masonry wall. In addition, a detailed emergency operation- action plan and warnng system should be developed. The spillways do not have sufficient capacity to discharge the peak outflow from one-half the Probable Maximum Flood (PMF). For this storm event and lesser events, high discharges will cause damage in the channel downstream of the dam. However, dam failure would not significantly increase the hazard to loss of lie downstream from that which would exist just prior to an overtopping-induced failure. Therefore, the spillway is assessed as inadequate.

National Dam Safety Program. Beebe Lake Dam (Inventory Number N.Y. 394), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report

Download National Dam Safety Program. Beebe Lake Dam (Inventory Number N.Y. 394), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Beebe Lake Dam (Inventory Number N.Y. 394), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report by : Lawrence D. Andersen

Download or read book National Dam Safety Program. Beebe Lake Dam (Inventory Number N.Y. 394), Oswego River Basin, Tompkins County, New York. Phase I Inspection Report written by Lawrence D. Andersen and published by . This book was released on 1981 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Based on the evaluation of the existing conditions, the condition of Beebe Lake Dam is considered to be good. The examination of documents and visual observations did not reveal conditions which constitute a hazard to human life or property. The spillway capacity was evaluated according to the recommended procedure and it was found that the dam can probably pass the required spillway design floods of 50 percent to 100 percent of the Probable Maximum Flood (PMF) without significantly affecting the stability of the main dam, if the dam behaves as an arch structure. Therefore, the spillway capacity is rated as adequate. Available documents, including a report by the owner, classifies the dam to be a gravity structure. Assuming behavior as a gravity structure, it was found that the factor of safety against overturning, even under normal pool loading conditions, is marginal. No design and construction information is available to document the precise geometry of the dam and whether it was constructed to function as an arch dam. Therefore, it is considered advisable that the owner undertake further investigations to evaluate the stability of the dam. (Author).

National Dam Safety Program. Salmon River Reservoir Dam (Inventory Number NY 374). Oswego County, New York. Phase I Inspection Report

Download National Dam Safety Program. Salmon River Reservoir Dam (Inventory Number NY 374). Oswego County, New York. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 156 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Salmon River Reservoir Dam (Inventory Number NY 374). Oswego County, New York. Phase I Inspection Report by : john B. Stetson

Download or read book National Dam Safety Program. Salmon River Reservoir Dam (Inventory Number NY 374). Oswego County, New York. Phase I Inspection Report written by john B. Stetson and published by . This book was released on 1978 with total page 156 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Additional investigation and removal of vegetation was recommended for Salmon River Dam. (Author).