National Dam Safety Program. Lake Land' Or Dam (Inventory Number VA 03309) York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Land' Or Dam (Inventory Number VA 03309) York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Land' Or Dam (Inventory Number VA 03309) York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Lake Land' Or Dam (Inventory Number VA 03309) York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1981 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Land' or Dam is an earthfill dam with an embankment approximately 2,159 feet long and 28.2 feet high, and a 39.9 foot long concrete spillway. The dam, located in Caroline County, Virginia, is used to impound Lake Land' or for recreational purposes by the residents of the Lake Land' or Development Community. Lake Land' or Dam is an 'intermediate' size - 'significant' hazard dam as defined by the Recommended Guidelines for Safety Inspection of Dams. The dam and appurtenant structures appear to be in fair overall condition. Visual inspection of the dam revealed several minor deficiencies requiring further attention. A stability check of the dam is not required. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 1/2 Probable Maximum Flood (1/2 PMF) was selected as the spillway design flood (SDF). The SDF was routed through the reservoir and found to reach a maximum water surface elevation 1.3 feet above the top of the dam. The spillway is capable of passing up to 25 percent of the Probable Maximum Flood or 50 percent of the SDF without overtopping the crest of the dam. Therefore, the spillway has been adjudged as inadequate, but not seriously inadequate since there is not a high hazard to loss of life downstream of the dam from large flows.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 200 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 200 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lake Devolia Dam. (Inventory Number Va 03331), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection REport

Download National Dam Safety Program. Lake Devolia Dam. (Inventory Number Va 03331), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection REport PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Devolia Dam. (Inventory Number Va 03331), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection REport by : James A. Walsh

Download or read book National Dam Safety Program. Lake Devolia Dam. (Inventory Number Va 03331), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection REport written by James A. Walsh and published by . This book was released on 1981 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Devolia Dam is an earthfill embankment approximately 20.6 feet high and 460 feet long. The principal spillways consist of one 24-inch and one 36-inch diameter corrugated metal pipes (C.M.P.) which pass through the embankment at the right abutment and approximate center of the dam, respectively. The left and right emergency spillway areas are natural overflow areas and are adjacent to the left and right abutments of the dam. The dam is located in Caroline County, approximately 1.8 miles west of Ladysmith, Virginia. The dam is owned by the Lake Land'or Property Owner's Association and is used for recreation. Lake Devolia Dam is a 'small' size - 'significant' hazard structure as defined by the Recommended Guidelines for Safety Inspection of Dams. The dam and appurtenant structures were in poor condition at the time of the inspection. Using the Corps of Engineer's screening criteria for the initial review of spillway adequacy, the 1/2 Probable Maximum Flood (1/2 PMF) was selected as the spillway design Flood (SDF) for Lake Devolia Dam. The SDF was routed through the reservoir and found to overtop the dam by a maximum depth of 1.0 feet with an average critical velocity of 4.6 feet per second (f.p.s). Total duration of dam overtopping would be about 1.2 hours.

National Dam Safety Program. Lake Heritage Dam (Inventory Number VA 03332), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Heritage Dam (Inventory Number VA 03332), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 59 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Heritage Dam (Inventory Number VA 03332), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Lake Heritage Dam (Inventory Number VA 03332), York River Basin, Caroline County, Commonwealth of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1981 with total page 59 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Heritage Dam is an earthfill embankment approximately 19.8 feet high and 1,310 feet long with a 29.9 foot wide by 4 foot high concrete weir spillway situated about 40 feet from the right abutment of the dam. The dam, located about 2.5 miles west of Ladysmith, Virginia, is used for recreation. The dam is owned by the Lake Land' or Property Owner's Association, Box 123, Ladysmith, Virginia 22501. Lake Heritage Dam is a 'small' size - 'high' hazard structure as defined by the Recommended Guidelines for Safety Inspection of Dams. The dam and appurtenant structures were in fair overall condition at the time of inspection. Maintenance of the dam is considered to be inadequate. A stability check of the dam is not required. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 1/2 Probable Maximum Flood (1/2 PMF) was selected as the spillway design flood (SDF). The SDF was routed through the reservoir and found to overtop the dam by a maximum depth of 0.7 feet with an average critical velocity of 3.8 feet per second. Total duration of overtopping would be approximately 1.9 hours.

Government reports annual index

Download Government reports annual index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 932 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government reports annual index by :

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 932 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lake Holly Dam (Inventory Number Va 03334). York River Basin. Caroline County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Holly Dam (Inventory Number Va 03334). York River Basin. Caroline County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 46 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Holly Dam (Inventory Number Va 03334). York River Basin. Caroline County, Commonwealth of Virginia. Phase I Inspection Report by : Carl S. Anderson

Download or read book National Dam Safety Program. Lake Holly Dam (Inventory Number Va 03334). York River Basin. Caroline County, Commonwealth of Virginia. Phase I Inspection Report written by Carl S. Anderson and published by . This book was released on 1981 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Holly Dam is an earthfill embankment approximately 20.7 feet high and 365 feet long. The principal spillway is a corrugated metal pipe riser located near the center of the embankment. An emergency spillway is located on the right abutment. The dam, located about 14.5 miles west of Sparta, Virginia, is used for recreation. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 100-year flood was selected as the spillway design flood (SDF). The spillway is capable of passing up to 89 percent of the SDF or 21 percent of the Probable Maximum Flood (PMF) without overtopping the dam. Overtopping velocities are not considered to be seriously detrimental to the dam. The spillway is adjudged as inadequate, but not seriously inadequate.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 226 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1981-11 with total page 226 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lake Caroline Dam (Inventory Number VA 03324), Mattaponi River Basin, Caroline County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Caroline Dam (Inventory Number VA 03324), Mattaponi River Basin, Caroline County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 87 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Caroline Dam (Inventory Number VA 03324), Mattaponi River Basin, Caroline County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Lake Caroline Dam (Inventory Number VA 03324), Mattaponi River Basin, Caroline County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 87 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a homogeneous earthfill structure about 1425 ft long and 48 ft high. The principal spillway consists of a 400 ft long reinforced concrete overflow weir. The weir overflows onto a 20 ft wide concrete apron 1.5-2.0 ft below the weir crest. The concrete apron is also used as a roadway for access the dam. The dam is an intermediate size structure and is assigned a significant hazard classification. The spillway will pass 100 percent of the Probable Maximum Flood (PMF) without overtopping. The spillway is rated adequate. The visual inspection did not reveal any problems which would require immediate attention. The dam is considered stable but an emergency operation and warning plan should be developed. Furthermore, a staff gage should be installed to monitor water levels.

National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 39 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Lakeland Dam is an earthfill structure approximately 550 feet long and 26.6 feet high. The dam is owned and maintained by the Lakeland Homeowners Association. The dam is classified as a small dam with a significant hazard classification. The principal spillway is an 18-inch corrugated metal pipe drop-inlet that passes at low level through the dam. The emergency spillway is an open channel earthen spillway located at the right abutment. The reservoir is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass the SDF without overtopping the dam. Therefore, the emergency spillway is adjudged as adequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures. Maintenance is performed by the owners. However, there is no regular maintenance operations plan or warning system. It is recommended that the services of a qualified geotechnical engineering firm be engaged to perform a stability check of the dam. This should be completed within 12 months. It is also recommended that a regular maintenance and operations program be instituted with provisions for accurate records of all maintenance performed, and that a warning system be established.

National Dam Safety Program. Beatties Millpond Dam (Inventory Number VA 08535), York River Basin, Hanover County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Beatties Millpond Dam (Inventory Number VA 08535), York River Basin, Hanover County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 52 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Beatties Millpond Dam (Inventory Number VA 08535), York River Basin, Hanover County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Beatties Millpond Dam (Inventory Number VA 08535), York River Basin, Hanover County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1981 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: Beatties Millpond Dam is an earthfill embankment approximately 13.9 feet high and 365 feet long with a 32 foot wide broad-crested concrete weir spillway located at the left abutment. The dam, located about 2.3 miles northeast of Old Cold Harbor, Virginia, is used for recreation. Beatties Millpond Dam is a small size - significant hazard structure as defined by the Recommended Guidelines for Safety Inspection of Dams. The dam and appurtenant structures were in good overall condition at the time of inspection. Maintenance of the dam is considered to be inadequate. A stability check of the dam is not required. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 100-year flood was selected as the spillway design flood (SDF). The spillway is capable of passing up to 40 percent of the SDF or 8 percent of the PMF without overtopping the dam. A dam failure from overtopping would not significantly increase the hazard to loss of life downstream from the dam over that which would exist just before overtopping failure. However, overtopping flows from the SDF are considered detrimental to the earth embankment. Therefore, the spillway is adjudged as inadequate but not seriously inadequate.

National Dam Safety Program. Fawn Lake Dam (Inventory Number VA 17709), York River Basin. Spotsylvania County Virginia. Phase I Inspection Report

Download National Dam Safety Program. Fawn Lake Dam (Inventory Number VA 17709), York River Basin. Spotsylvania County Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 94 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Fawn Lake Dam (Inventory Number VA 17709), York River Basin. Spotsylvania County Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Fawn Lake Dam (Inventory Number VA 17709), York River Basin. Spotsylvania County Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam is a homogeneous earthfill structure about 2230 ft long and 63 ft high. The principal spillway consists of a rectangular reinforced concrete riser (9 ft x 3 ft) and 240 ft of 36 inch diameter concrete discharge pipe. A 200 ft wide earthen emergency spillway is located at the left abutment, 3.5 ft above the principal spillway. The dam is an intermediate size structure and is assigned a significant hazard classification. The spillway will pass 45 percent of the Probable Maximum Flood (PMF) or 90 percent of the SDF without overtopping. The spillway is judged inadequate, but not seriously inadequate. The visual inspection did not reveal any problems which would require immediate attention., A better vegetative cover should be established in the emergency spillway. Several eroded areas existing on the downstream slope should be examined during normal maintenance. Seepage areas described along the left and right downstream toe of the embankment should be monitored quarterly. An emergency operation and warning plan should be developed. The upstream slope does not meet the guidelines recommended for earthfill dams subject to rapid drawdown.

York River Basin, Thelma Pitts Dam, Caroline County, State of Virginia, VA 03343

Download York River Basin, Thelma Pitts Dam, Caroline County, State of Virginia, VA 03343 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (825 download)

DOWNLOAD NOW!


Book Synopsis York River Basin, Thelma Pitts Dam, Caroline County, State of Virginia, VA 03343 by : United States. Army. Corps of Engineers. Norfolk District

Download or read book York River Basin, Thelma Pitts Dam, Caroline County, State of Virginia, VA 03343 written by United States. Army. Corps of Engineers. Norfolk District and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Warrenton Lake Dam (Inventory Number VA 06134), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Warrenton Lake Dam (Inventory Number VA 06134), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Warrenton Lake Dam (Inventory Number VA 06134), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Warrenton Lake Dam (Inventory Number VA 06134), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1981 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I Inspection is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspection. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

York River Basin, Coburn Dam, Caroline County, State of Virginia, VA 03340

Download York River Basin, Coburn Dam, Caroline County, State of Virginia, VA 03340 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (825 download)

DOWNLOAD NOW!


Book Synopsis York River Basin, Coburn Dam, Caroline County, State of Virginia, VA 03340 by : United States. Army. Corps of Engineers. Norfolk District

Download or read book York River Basin, Coburn Dam, Caroline County, State of Virginia, VA 03340 written by United States. Army. Corps of Engineers. Norfolk District and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Airlie Dam (Inventory Number VA 06115), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Airlie Dam (Inventory Number VA 06115), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Airlie Dam (Inventory Number VA 06115), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Airlie Dam (Inventory Number VA 06115), Rappahannock River Basin, Fauquier County, Commonwealth of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1981 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I Inspection is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspection. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Timber Lake Dam. (Inventory Number VA 03102), Roanoke River Basin, Campbell County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Timber Lake Dam. (Inventory Number VA 03102), Roanoke River Basin, Campbell County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Timber Lake Dam. (Inventory Number VA 03102), Roanoke River Basin, Campbell County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Timber Lake Dam. (Inventory Number VA 03102), Roanoke River Basin, Campbell County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the Recommended Guidelines for Safety Inspection of Dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. (Author).

National Dam Safety Program. DiGiulian Dam (Inventory Number VA 06102), Shenandoah River Basin. Fauquier County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. DiGiulian Dam (Inventory Number VA 06102), Shenandoah River Basin. Fauquier County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 45 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. DiGiulian Dam (Inventory Number VA 06102), Shenandoah River Basin. Fauquier County, Commonwealth of Virginia. Phase I Inspection Report by : Carl S Anderson (Jr)

Download or read book National Dam Safety Program. DiGiulian Dam (Inventory Number VA 06102), Shenandoah River Basin. Fauquier County, Commonwealth of Virginia. Phase I Inspection Report written by Carl S Anderson (Jr) and published by . This book was released on 1981 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: DiGiulian Dam is an earthfill embankment 29.9 feet high and 281 feet long. The principal spillway is a corrugated metal pipe riser located near the center of the dam. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 100-year flood was selected as the spillway design flood (SDF). The SDF was routed through the reservoir and found to overtop the dam by a maximum depth of 0.7 foot with an average critical velocity of 2.9 f.p.s. Total duration of dam overtopping would be approximately 0.8 hours. Overtopping flows are not considered to be seriously detrimental to the embankment. The spillway is capable of passing up to 84 percent of the SDF or 12 percent of the Probable Maximum Flood (PMF) without overtopping the dam. The spillway is adjudged as inadequate, but not seriously inadequate.