DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB).

Download DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB). PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 294 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB). by :

Download or read book DESIGN VERIFICATION REPORT SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB). written by and published by . This book was released on 2003 with total page 294 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Sub-project W379, ''Spent Nuclear Fuel Canister Storage Building (CSB), '' was established as part of the Spent Nuclear Fuel (SNF) Project. The primary mission of the CSB is to safely store spent nuclear fuel removed from the K Basins in dry storage until such time that it can be transferred to the national geological repository at Yucca Mountain Nevada. This sub-project was initiated in late 1994 by a series of studies and conceptual designs. These studies determined that the partially constructed storage building, originally built as part of the Hanford Waste Vitrification Plant (HWVP) Project, could be redesigned to safely store the spent nuclear fuel. The scope of the CSB facility initially included a receiving station, a hot conditioning system, a storage vault, and a Multi-Canister Overpack (MCO) Handling Machine (MHM). Because of evolution of the project technical strategy, the hot conditioning system was deleted from the scope and MCO welding and sampling stations were added in its place. This report outlines the methods, procedures, and outputs developed by Project W379 to verify that the provided Structures, Systems, and Components (SSCs): satisfy the design requirements and acceptance criteria; perform their intended function; ensure that failure modes and hazards have been addressed in the design; and ensure that the SSCs as installed will not adversely impact other SSCs. The original version of this document was prepared by Vista Engineering for the SNF Project. Revision 1 documented verification actions that were pending at the time the initial report was prepared. Revision 3 of this document incorporates MCO Cover Cap Assembly welding verification activities. Verification activities for the installed and operational SSCs have been completed.

Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) System Design Descriptions

Download Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) System Design Descriptions PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 224 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) System Design Descriptions by :

Download or read book Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) System Design Descriptions written by and published by . This book was released on 2000 with total page 224 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Spent Nuclear Fuel Canister Storage Building CDR Review Committee Report

Download Spent Nuclear Fuel Canister Storage Building CDR Review Committee Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 92 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel Canister Storage Building CDR Review Committee Report by :

Download or read book Spent Nuclear Fuel Canister Storage Building CDR Review Committee Report written by and published by . This book was released on 1995 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Canister Storage Building (CSB) is a subproject under the Spent Nuclear Fuels Major System Acquisition. This subproject is necessary to design and construct a facility capable of providing dry storage of repackaged spent fuels received from K Basins. The CSB project completed a Conceptual Design Report (CDR) implementing current project requirements. A Design Review Committee was established to review the CDR. This document is the final report summarizing that review.

A Wild-Fire Plot Found Out in Ireland, Shewing how the Rebels Would Have Consumed the City of Dublin with Wild-fire

Download A Wild-Fire Plot Found Out in Ireland, Shewing how the Rebels Would Have Consumed the City of Dublin with Wild-fire PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (644 download)

DOWNLOAD NOW!


Book Synopsis A Wild-Fire Plot Found Out in Ireland, Shewing how the Rebels Would Have Consumed the City of Dublin with Wild-fire by :

Download or read book A Wild-Fire Plot Found Out in Ireland, Shewing how the Rebels Would Have Consumed the City of Dublin with Wild-fire written by and published by . This book was released on 1641 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

ธนาคารความดี

Download ธนาคารความดี PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis ธนาคารความดี by :

Download or read book ธนาคารความดี written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Construction Acceptance Test Procedures

Download Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Construction Acceptance Test Procedures PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 17 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Construction Acceptance Test Procedures by :

Download or read book Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Construction Acceptance Test Procedures written by and published by . This book was released on 2000 with total page 17 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Factory Acceptance Test Procedures

Download Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Factory Acceptance Test Procedures PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 19 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Factory Acceptance Test Procedures by :

Download or read book Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Factory Acceptance Test Procedures written by and published by . This book was released on 2000 with total page 19 pages. Available in PDF, EPUB and Kindle. Book excerpt:

SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB) MULTI CANISTER OVERPACK (MCO) SAMPLING SYSTEM VALIDATION (OCRWM).

Download SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB) MULTI CANISTER OVERPACK (MCO) SAMPLING SYSTEM VALIDATION (OCRWM). PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 158 pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB) MULTI CANISTER OVERPACK (MCO) SAMPLING SYSTEM VALIDATION (OCRWM). by :

Download or read book SPENT NUCLEAR FUEL (SNF) PROJECT CANISTER STORAGE BUILDING (CSB) MULTI CANISTER OVERPACK (MCO) SAMPLING SYSTEM VALIDATION (OCRWM). written by and published by . This book was released on 2003 with total page 158 pages. Available in PDF, EPUB and Kindle. Book excerpt: Approximately 400 Multi-canister overpacks (MCO) containing spent nuclear fuel are to be interim stored at the Canister Storage Building (CSB). Several MCOs (monitored MCOs) are designated to be gas sampled periodically at the CSB sampling/weld station (Bader 2002a). The monitoring program includes pressure, temperature and gas composition measurements of monitored MCOs during their first two years of interim storage at the CSB. The MCO sample cart (CART-001) is used at the sampling/weld station to measure the monitored MCO gas temperature and pressure, obtain gas samples for laboratory analysis and refill the monitored MCO with high purity helium as needed. The sample cart and support equipment were functionally and operationally tested and validated before sampling of the first monitored MCO (H-036). This report documents the results of validation testing using training MCO (TR-003) at the CSB. Another report (Bader 2002b) documents the sample results from gas sampling of the first monitored MCO (H-036). Validation testing of the MCO gas sampling system showed the equipment and procedure as originally constituted will satisfactorily sample the first monitored MCO. Subsequent system and procedural improvements will provide increased flexibility and reliability for future MCO gas sampling. The physical operation of the sampling equipment during testing provided evidence that theoretical correlation factors for extrapolating MCO gas composition from sample results are unnecessarily conservative. Empirically derived correlation factors showed adequate conservatism and support use of the sample system for ongoing monitored MCO sampling.

As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine

Download As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 20 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine by :

Download or read book As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine written by and published by . This book was released on 2000 with total page 20 pages. Available in PDF, EPUB and Kindle. Book excerpt: This as-built verification plan outlines the methodology and responsibilities that will be implemented during the as-built field verification activity for the Canister Storage Building (CSB) MCO HANDLING MACHINE (MHM). This as-built verification plan covers THE ELECTRICAL PORTION of the CONSTRUCTION PERFORMED BY POWER CITY UNDER CONTRACT TO MOWAT. The as-built verifications will be performed in accordance Administrative Procedure AP 6-012-00, Spent Nuclear Fuel Project As-Built Verification Plan Development Process, revision I. The results of the verification walkdown will be documented in a verification walkdown completion package, approved by the Design Authority (DA), and maintained in the CSB project files.

Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Procurement Specifications[SEC 1 and 2].

Download Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Procurement Specifications[SEC 1 and 2]. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Procurement Specifications[SEC 1 and 2]. by :

Download or read book Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Procurement Specifications[SEC 1 and 2]. written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This specification section defines the welding, brazing, thermal treatment, examination and testing requirements for carbon steel, and stainless steel piping.

Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements

Download Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 91 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements by :

Download or read book Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements written by and published by . This book was released on 2000 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: In 1998, a major change in the technical strategy for managing Multi Canister Overpacks (MCO) while stored within the Canister Storage Building (CSB) occurred. The technical strategy is documented in Baseline Change Request (BCR) No. SNF-98-006, Simplified SNF Project Baseline (MCO Sealing) (FDH 1998). This BCR deleted the hot conditioning process initially adopted for the Spent Nuclear Fuel Project (SNF Project) as documented in WHC-SD-SNF-SP-005, Integrated Process Strategy for K Basins Spent Nuclear Fuel (WHC 199.5). In summary, MCOs containing Spent Nuclear Fuel (SNF) from K Basins would be placed in interim storage following processing through the Cold Vacuum Drying (CVD) facility. With this change, the needs for the Hot Conditioning System (HCS) and inerting/pressure retaining capabilities of the CSB storage tubes and the MCO Handling Machine (MHM) were eliminated. Mechanical seals will be used on the MCOs prior to transport to the CSB. Covers will be welded on the MCOs for the final seal at the CSB. Approval of BCR No. SNF-98-006, imposed the need to review and update the CSB functions and requirements baseline documented herein including changing the document title to ''Spent Nuclear Fuel Project Canister Storage Building Functions and Requirements.'' This revision aligns the functions and requirements baseline with the CSB Simplified SNF Project Baseline (MCO Sealing). This document represents the Canister Storage Building (CSB) Subproject technical baseline. It establishes the functions and requirements baseline for the implementation of the CSB Subproject. The document is organized in eight sections. Sections 1.0 Introduction and 2.0 Overview provide brief introductions to the document and the CSB Subproject. Sections 3.0 Functions, 4.0 Requirements, 5.0 Architecture, and 6.0 Interfaces provide the data described by their titles. Section 7.0 Glossary lists the acronyms and defines the terms used in this document. Section 8.0 References lists the references used for this document.

Canister Storage Building (CSB) Design Basis Accident Analysis Documentation

Download Canister Storage Building (CSB) Design Basis Accident Analysis Documentation PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Canister Storage Building (CSB) Design Basis Accident Analysis Documentation by :

Download or read book Canister Storage Building (CSB) Design Basis Accident Analysis Documentation written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provided the detailed accident analysis to support HNF-3553, Spent Nuclear Fuel Project Final Safety Analysis Report, Annex A, ''Canister Storage Building Final Safety Analysis Report''. All assumptions, parameters, and models used to provide the analysis of the design basis accidents are documented to support the conclusions in the Canister Storage Building Final Safety Analysis Report.

Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Process Flow Diagram Mass Balance Calculations

Download Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Process Flow Diagram Mass Balance Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Process Flow Diagram Mass Balance Calculations by :

Download or read book Spent Nuclear Fuel (SNF) Project Canister Storage Building (CSB) Process Flow Diagram Mass Balance Calculations written by and published by . This book was released on 2000 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of these calculations is to develop the material balances for documentation of the Canister Storage Building (CSB) Process Flow Diagram (PFD) and future reference. The attached mass balances were prepared to support revision two of the PFD for the CSB. The calculations refer to diagram H-2-825869.

Canister Storage Building (CSB) Safety Analysis Report Phase 3

Download Canister Storage Building (CSB) Safety Analysis Report Phase 3 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 714 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Canister Storage Building (CSB) Safety Analysis Report Phase 3 by :

Download or read book Canister Storage Building (CSB) Safety Analysis Report Phase 3 written by and published by . This book was released on 1997 with total page 714 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Canister Storage Building (CSB) will be constructed in the 200 East Area of the U.S. Department of Energy (DOE) Hanford Site. The CSB will be used to stage and store spent nuclear fuel (SNF) removed from the Hanford Site K Basins. The objective of this chapter is to describe the characteristics of the site on which the CSB will be located. This description will support the hazard analysis and accident analyses in Chapter 3.0. The purpose of this report is to provide an evaluation of the CSB design criteria, the design's compliance with the applicable criteria, and the basis for authorization to proceed with construction of the CSB.

Spent Nuclear Fuel Canister Storage Building Conceptual Design Report

Download Spent Nuclear Fuel Canister Storage Building Conceptual Design Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 380 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel Canister Storage Building Conceptual Design Report by :

Download or read book Spent Nuclear Fuel Canister Storage Building Conceptual Design Report written by and published by . This book was released on 1996 with total page 380 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Conceptual Design Report provides the technical basis for the Spent Nuclear Fuels Project, Canister Storage Building, and as amended by letter (correspondence number 9555700, M.E. Witherspoon to E.B. Sellers, T̀̀echnical Baseline and Updated Cost Estimate for the Canister Storage Building, ̀̀ dated October 24, 1995), includes the project cost baseline and Criteria to be used as the basis for starting detailed design in fiscal year 1995.

Department of Energy's Hanford Spent Nuclear Fuel Project

Download Department of Energy's Hanford Spent Nuclear Fuel Project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 352 pages
Book Rating : 4.0/5 ( download)

DOWNLOAD NOW!


Book Synopsis Department of Energy's Hanford Spent Nuclear Fuel Project by : United States. Congress. House. Committee on Commerce. Subcommittee on Oversight and Investigations

Download or read book Department of Energy's Hanford Spent Nuclear Fuel Project written by United States. Congress. House. Committee on Commerce. Subcommittee on Oversight and Investigations and published by . This book was released on 1998 with total page 352 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

Download Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 13 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process by :

Download or read book Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process written by and published by . This book was released on 2000 with total page 13 pages. Available in PDF, EPUB and Kindle. Book excerpt: This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work.