Advanced Turbine Systems Program. Topical Report

Download Advanced Turbine Systems Program. Topical Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 75 pages
Book Rating : 4.:/5 (871 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program. Topical Report by :

Download or read book Advanced Turbine Systems Program. Topical Report written by and published by . This book was released on 1993 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3 -- System Selection ; Topical Report

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3 -- System Selection ; Topical Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 56 pages
Book Rating : 4.:/5 (682 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3 -- System Selection ; Topical Report by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3 -- System Selection ; Topical Report written by and published by . This book was released on 1994 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: Solar Turbines Incorporated has elected to pursue an intercooled and recuperated (ICR) gas turbine system to exceed the goals of the DOE Advanced Turbine Systems (ATS) program, which are to develop and commercialize an industrial gas turbine system that operates at thermal efficiencies at least 15% higher than 1991 products, and with emissions not exceeding eight ppmv NOx and 20 ppmv CO and UHC. Solar's goal is to develop a commercially viable industrial system (3--20 MW) driven by a gas turbine engine with a thermal efficiency of 50% (ATS50), with the flexibility to meet the differing operational requirements of various markets. Dispersed power generation is currently considered to be the primary future target market for the ICR in the 5--15 MW size class. The ICR integrated system approach provides an ideal candidate for the assumed dispersed power market, with its small footprint, easy transportability, and environmental friendliness. In comparison with other systems that use water or toxic chemicals such as ammonia for NOx control, the ICR has no consumables other than fuel and air. The low pressure ratio of the gas turbine engine also is favorable in that less parasitic power is needed to pump the natural gas into the combustor than for simple-cycle machines. Solar has narrowed the ICR configuration to two basic approaches, a 1-spool, and a 2-spool version of the ATS50. The 1-spool engine will have a lower first-cost but lower part-power efficiencies. The 2-spool ATS may not only have better part-power efficiency, its efficiency will also be less sensitive to reduced turbine rotor inlet temperature levels. Thus hot-end parts life can be increased with only small sacrifices in efficiency. The flexibility of the 2-spool arrangement in meeting customer needs is its major advantage over the 1-spool. This Task 3 Topical Report is intended to present Solar's preliminary system selection based upon the initial trade-off studies performed to date.

Advanced Turbine Systems Program

Download Advanced Turbine Systems Program PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 6 pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program by :

Download or read book Advanced Turbine Systems Program written by and published by . This book was released on 1994 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report has been prepared by Solar Turbines Incorporated (Solar) in accordance with Task 2 of the Advanced Turbine Systems (ATS) Contract. This report addresses only the work that will be performed under Task 8 (Design and Test of Critical Components) of the Contract. The discussion is divided into four general sections: Project Description; Potential Environmental Impacts; Required Permits and Licenses; and Environmental, Safety and Health (ES and H) Agency Contact Information. As described in further detail herein, the activities to occur during the project (i.e., Task 8) consists primarily of short duration testing of laboratory-scale components (or portions of components) for the ATS program. The testing involved will fall in the following general categories: recuperator, combustor, and blade/airfoil cooling. All activities contemplated will occur at existing facilities. Solar believes that the information in this report supports the conclusion that no significant environmental impacts will be associated with the project.

Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report

Download Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Advanced Turbine Systems Program Conceptual Design and Product Development. Topical Report, April 1995

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Topical Report, April 1995 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development. Topical Report, April 1995 by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development. Topical Report, April 1995 written by and published by . This book was released on 1996 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 78 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994 by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994 written by and published by . This book was released on 1994 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Yearly Technical Progress Report covers the period August 3, 1993 through July 31, 1994 for Phase 2 of the Advanced Turbine Systems (ATS) Program by Solar Turbines Incorporated under DOE Contract No. DE-AC421-93MC30246. As allowed by the Contract (Part 3, Section J, Attachment B) this report is also intended to fulfill the requirements for a fourth quarterly report. The objective of Phase 2 of the ATS Program is to provide the conceptual design and product development plan for an ultra-high efficiency, environmentally superior and cost-competitive industrial gas turbine system to be commercialized in the year 2000. During the period covered by this report, Solar has completed three of eight program tasks and has submitted topical reports. These three tasks included a Project Plan submission of information required by NEPA, and the selection of a Gas-Fueled Advanced Turbine System (GFATS). In the latest of the three tasks, Solar's Engineering team identified an intercooled and recuperated (ICR) gas turbine as the eventual outcome of DOE's ATS program coupled with Solar's internal New Product Introduction (NPI) program. This machine, designated ''ATS50'' will operate at a thermal efficiency (turbine shaft power/fuel LHV) of 50 percent, will emit less than 10 parts per million of NOx and will reduce the cost of electricity by 10 percent. It will also demonstrate levels of reliability, availability, maintainability, and durability (RAMD) equal to or better than those of today's gas turbine systems. Current activity is concentrated in three of the remaining five tasks a Market Study, GFATS System Definition and Analysis, and the Design and Test of Critical Components.

Advanced Turbine Systems Program Conceptual Design and Product Development Task 8.3 - Autothermal Fuel Reformer (ATR). Topical Report

Download Advanced Turbine Systems Program Conceptual Design and Product Development Task 8.3 - Autothermal Fuel Reformer (ATR). Topical Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 41 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development Task 8.3 - Autothermal Fuel Reformer (ATR). Topical Report by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development Task 8.3 - Autothermal Fuel Reformer (ATR). Topical Report written by and published by . This book was released on 1996 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: Autothermal fuel reforming (ATR) consists of reacting a hydrocarbon fuel such as natural gas or diesel with steam to produce a hydrogen-rich {open_quotes}reformed{close_quotes} fuel. This work has been designed to investigate the fuel reformation and the product gas combustion under gas turbine conditions. The hydrogen-rich gas has a high flammability with a wide range of combustion stability. Being lighter and more reactive than methane, the hydrogen-rich gas mixes readily with air and can be burned at low fuel/air ratios producing inherently low emissions. The reformed fuel also has a low ignition temperature which makes low temperature catalytic combustion possible. ATR can be designed for use with a variety of alternative fuels including heavy crudes, biomass and coal-derived fuels. When the steam required for fuel reforming is raised by using energy from the gas turbine exhaust, cycle efficiency is improved because of the steam and fuel chemically recuperating. Reformation of natural gas or diesel fuels to a homogeneous hydrogen-rich fuel has been demonstrated. Performance tests on screening various reforming catalysts and operating conditions were conducted on a batch-tube reactor. Producing over 70 percent of hydrogen (on a dry basis) in the product stream was obtained using natural gas as a feedstock. Hydrogen concentration is seen to increase with temperature but less rapidly above 1300°F. The percent reforming increases as the steam to carbon ratio is increased. Two basic groups of reforming catalysts, nickel - and platinum-basis, have been tested for the reforming activity.

Selection of Natural Gas Fired Advanced Turbine Systems (GFATS) Program - Task 3. Topical Report

Download Selection of Natural Gas Fired Advanced Turbine Systems (GFATS) Program - Task 3. Topical Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 9 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Selection of Natural Gas Fired Advanced Turbine Systems (GFATS) Program - Task 3. Topical Report by :

Download or read book Selection of Natural Gas Fired Advanced Turbine Systems (GFATS) Program - Task 3. Topical Report written by and published by . This book was released on 1994 with total page 9 pages. Available in PDF, EPUB and Kindle. Book excerpt: Research continued on natural gas-fired turbines. The objective of Task 3 was to perform initial trade studies and select one engine system (Gas-Fired Advanced Turbine System [GFATS]) that the contractor could demonstrate, at full scale, in the 1998 to 2000 time frame. This report describes the results of the selection process. This task, including Allison internal management reviews of the selected system, has been completed. Allison's approach to ATS is to offer an engine family that is based on the newest T406 high technology engine. This selection was based on a number of parameters including return on investment (ROI), internal rate of return (IRR) market size and potential sales into that market. This base engine family continues a history at Allison of converting flight engine products to industrial use.

Comprehensive Program Plan for Advanced Turbine Systems

Download Comprehensive Program Plan for Advanced Turbine Systems PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.:/5 (291 download)

DOWNLOAD NOW!


Book Synopsis Comprehensive Program Plan for Advanced Turbine Systems by : United States. Office of Fossil Energy

Download or read book Comprehensive Program Plan for Advanced Turbine Systems written by United States. Office of Fossil Energy and published by . This book was released on 1993 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Report to Congress

Download Report to Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 45 pages
Book Rating : 4.:/5 (339 download)

DOWNLOAD NOW!


Book Synopsis Report to Congress by : United States. Office of Fossil Energy

Download or read book Report to Congress written by United States. Office of Fossil Energy and published by . This book was released on 1994 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report

Download Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 99 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report by :

Download or read book Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report written by and published by . This book was released on 1996 with total page 99 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Final Technical Report presents the accomplishments on Phase 2 of the Advanced Turbine Systems (ATS). The ATS is an advanced, natural gas fired gas turbine system that will represent a major advance on currently available industrial gas turbines in the size range of 1--20 MW. This report covers a market-driven development. The Market Survey reported in Section 5 identified the customer's performance needs. This market survey used analyses performed by Solar turbine Incorporated backed up by the analyses done by two consultants, Research Decision Consultants (RDC) and Onsite Energy Corporation (Onsite). This back-up was important because it is the belief of all parties that growth of the ATS will depend both on continued participation in Solar's traditional oil and gas market but to a major extent on a new market. This new market is distributed electrical power generation. Difficult decisions have had to be made to meet the different demands of the two markets. Available resources, reasonable development schedules, avoidance of schedule or technology failures, probable acceptance by the marketplace, plus product cost, performance and environmental friendliness are a few of the complex factors influencing the selection of the Gas Fired Advanced Turbine System described in Section 3. Section 4 entitled ''Conversion to Coal'' was a task which addresses the possibility of a future interruption to an economic supply of natural gas. System definition and analysis is covered in Section 6. Two major objectives were met by this work. The first was identification of those critical technologies that can support overall attainment of the program goals. Separate technology or component programs were begun to identify and parameterize these technologies and are described in Section 7. The second objective was to prepare parametric analyses to assess performance sensitivity to operating variables and to select design approaches to meet the overall program goals.

Advanced Turbine Systems Program Conceptual Design and Product Development

Download Advanced Turbine Systems Program Conceptual Design and Product Development PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 38 pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development written by and published by . This book was released on 1994 with total page 38 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Topical Report presents the results of Task 4 of the Westinghouse ATS Program. The purpose of Task 4 is to determine the technical development needs for conversion of the gas-fired ATS (GFATS). Two closely related, advanced, coal-based power plant technologies have been selected for consideration as the CFATS -- air-blown, coal gasification with hot gas cleaning incorporated into an Integrated Gasification Combined Cycle (IGCC), and the Second-Generation Pressurized Fluidized Bed Combustion (PFBC) combined cycle. These are described and their estimated performance and emissions in the CFATS are reported. A development program for the CFATS is described that focuses on major commercialization issues. These issues are in the areas of combustion, flow distribution, structural analysis, and materials selection.

Advanced Turbine Systems Program, Conceptual Design and Product Development. Task 6, System Definition and Analysis

Download Advanced Turbine Systems Program, Conceptual Design and Product Development. Task 6, System Definition and Analysis PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 56 pages
Book Rating : 4.:/5 (683 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program, Conceptual Design and Product Development. Task 6, System Definition and Analysis by :

Download or read book Advanced Turbine Systems Program, Conceptual Design and Product Development. Task 6, System Definition and Analysis written by and published by . This book was released on 1995 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: The strategy of the ATS program is to develop a new baseline for industrial gas turbine systems for the 21st century, meeting the buying criteria of industrial gas turbine end users, and having growth potential. These criteria guided the Solar ATS Team in selecting the system definition described in this Topical Report. The key to selecting the ATS system definition was meeting or exceeding each technical goal without negatively impacting other commercial goals. Among the most crucial goals are the buying criteria of the industrial gas turbine market. Solar started by preliminarily considering several cycles with the potential to meet ATS program goals. These candidates were initially narrowed based on a qualitative assessment of several factors such as the potential for meeting program goals and for future growth; the probability of successful demonstration within the program's schedule and expected level of funding; and the appropriateness of the cycle in light of end users' buying criteria. A first level Quality Function Deployment (QFD) analysis then translated customer needs into functional requirements, and ensured favorable interaction between concept features. Based on this analysis, Solar selected a recuperated cycle as the best approach to fulfilling both D.O.E. and Solar marketing goals. This report details the design and analysis of the selected engine concept, and explains how advanced features of system components achieve program goals. Estimates of cost, performance, emissions and RAMD (reliability, availability, maintainability, durability) are also documented in this report.

Die Preisentwicklung der wichtigsten Rohstoffe am Weltmarkt von Mitte 1932 bis Mitte November 1933

Download Die Preisentwicklung der wichtigsten Rohstoffe am Weltmarkt von Mitte 1932 bis Mitte November 1933 PDF Online Free

Author :
Publisher :
ISBN 13 : 9789644178764
Total Pages : 16 pages
Book Rating : 4.1/5 (787 download)

DOWNLOAD NOW!


Book Synopsis Die Preisentwicklung der wichtigsten Rohstoffe am Weltmarkt von Mitte 1932 bis Mitte November 1933 by :

Download or read book Die Preisentwicklung der wichtigsten Rohstoffe am Weltmarkt von Mitte 1932 bis Mitte November 1933 written by and published by . This book was released on 1933 with total page 16 pages. Available in PDF, EPUB and Kindle. Book excerpt: Somebody has robbed the Lampies' village! And it can't be Lord Sparr-because he has mysteriously disappeared. The rumor is that a terrible beast is behind the crime.

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, February 1995-April 1995

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, February 1995-April 1995 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 0 pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, February 1995-April 1995 by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, February 1995-April 1995 written by and published by . This book was released on 1994 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Liber I, Sententiarum

Download Liber I, Sententiarum PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 694 pages
Book Rating : 4.:/5 (61 download)

DOWNLOAD NOW!


Book Synopsis Liber I, Sententiarum by :

Download or read book Liber I, Sententiarum written by and published by . This book was released on 1934 with total page 694 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994-July 1995

Download Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994-July 1995 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (88 download)

DOWNLOAD NOW!


Book Synopsis Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994-July 1995 by :

Download or read book Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994-July 1995 written by and published by . This book was released on 1995 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: