Project W-320, 241-C-106 Sluicing Piping Calculations

Download Project W-320, 241-C-106 Sluicing Piping Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing Piping Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing Piping Calculations written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 197 pages
Book Rating : 4.:/5 (873 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 197 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 645 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 645 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 397 pages
Book Rating : 4.:/5 (873 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 397 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe support to the Civil Engineering group.

Project W-320, 241-C-106 Sluicing Piping Calculations

Download Project W-320, 241-C-106 Sluicing Piping Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 230 pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing Piping Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing Piping Calculations written by and published by . This book was released on 1998 with total page 230 pages. Available in PDF, EPUB and Kindle. Book excerpt: The object of this report is to calculate the hydraulic forces imposed at the sluicer nozzle. This is required by Project W-320 waste retrieval for tank 241-C-106. The method of analysis used is Bernoulli's momentum equation for stead flow.

Project W-320, 241-C-106 Sluicing: Piping Calculations

Download Project W-320, 241-C-106 Sluicing: Piping Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing: Piping Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing: Piping Calculations written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the structural analysis of the Pipe Supports designed for Slurry and Supernate transfer pipe lines in order to meet the requirements of applicable ASME codes. The pipe support design loads are obtained from the piping stress calculations W320-27-I-4 and W320-27-I-5. These loads are the total summation of the gravity, pressure, thermal and seismic loads. Since standard typical designs are used for each type of pipe support such as Y-Stop, Guide and Anchors, each type of support is evaluated for the maximum loads to which this type of supports are subjected. These loads are obtained from the AutoPipe analysis and used to check the structural adequacy of these supports.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 316 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 316 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objective of this calculation is to perform the hydraulic analysis on the slurry line and the supernate line for W-320. This calculation will use the As-Built conditions of the slurry line and the supernate line. Booster Pump Curves vs System Curves shall be generated for the supernate system and the slurry system.

Project W-320, 241-C-106 Sluicing: Piping Calculations

Download Project W-320, 241-C-106 Sluicing: Piping Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing: Piping Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing: Piping Calculations written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The objectives of this calculation are (1) To perform static and Safety Class 2 dynamic stress analysis of the Slurry and Supernate Process (inner) piping connecting Tanks 241-C-106 and 241-AY-102 in order to be in compliance with the Code requirements; (2) To assure the thermal expansion of the process pipe not be strained by the outer encasement pipe; and (3) To furnish process pipe support to the Civil Engineering group.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 129 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 129 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable.

Project W-320, 241-C-106 Sluicing: Civil/structural Calculations

Download Project W-320, 241-C-106 Sluicing: Civil/structural Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing: Civil/structural Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing: Civil/structural Calculations written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable. The purpose of this calculation is to conservatively estimate the weight of equipment and structures being added over Tank 241-C-106 as a result of Project W-320 and combine these weights with the estimated weights of existing structures and equipment as calculated in Attachment 1. The combined weights will be compared to the allowable live load limit to provide a preliminary assessment of loading conditions above Tank 241-C-106.

Project W-320, 241-C-106 Sluicing HVAC Calculations

Download Project W-320, 241-C-106 Sluicing HVAC Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing HVAC Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing HVAC Calculations written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. The report contains the following design calculations: Cooling load in pump pit 241-AY-102; Pressure relief seal loop design; Process building piping stress analysis; Exhaust skid maximum allowable leakage criteria; and Recirculation heat, N509 duct requirements.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 349 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 349 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 242 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 242 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320 readily retrievable.

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 468 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 468 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW civil/structural calculations for Project W-320 readily retrievable. The Equipment Removal System (ERS) has been identified by WHC as not having any safety class 1 items present in the tank pits during equipment removal activities, Documentation of this finding is provided in Letter of Instruction 3/1 Analysis Requirements for Project W-320 Equipment Removal System (REF: LOI KGS-94-013). Based on this specific direction from WHC, 3/1 analysis for any component of the Project W-320 ERS is required. No further documentation of non-safety impacting safety items is required per DOE-RL Audit finding No. 90-02, and filing of this memorandum in the W-320 project files satisfies the intent of the referenced DOE observation.

Project W-320, 241-C-106 Sluicing Electrical Calculations

Download Project W-320, 241-C-106 Sluicing Electrical Calculations PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 143 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing Electrical Calculations by :

Download or read book Project W-320, 241-C-106 Sluicing Electrical Calculations written by and published by . This book was released on 1998 with total page 143 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the FDNW calculations for Project W-320, readily retrievable. These calculations are required: To determine the power requirements needed to power electrical heat tracing segments contained within three manufactured insulated tubing assemblies; To verify thermal adequacy of tubing assembly selection by others; To size the heat tracing feeder and branch circuit conductors and conduits; To size protective circuit breaker and fuses; and To accomplish thermal design for two electrical heat tracing segments: One at C-106 tank riser 7 (CCTV) and one at the exhaust hatchway (condensate drain). Contents include: C-Farm electrical heat tracing; Cable ampacity, lighting, conduit fill and voltage drop; and Control circuit sizing and voltage drop analysis for the seismic shutdown system.

Utredning och förslag angående lag om obligatorisk æ betslöshetsförsäkring

Download Utredning och förslag angående lag om obligatorisk æ betslöshetsförsäkring PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 532 pages
Book Rating : 4.:/5 (483 download)

DOWNLOAD NOW!


Book Synopsis Utredning och förslag angående lag om obligatorisk æ betslöshetsförsäkring by :

Download or read book Utredning och förslag angående lag om obligatorisk æ betslöshetsförsäkring written by and published by . This book was released on 1948 with total page 532 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Project W-320, 241-C-106 Sluicing

Download Project W-320, 241-C-106 Sluicing PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 250 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Project W-320, 241-C-106 Sluicing by :

Download or read book Project W-320, 241-C-106 Sluicing written by and published by . This book was released on 1998 with total page 250 pages. Available in PDF, EPUB and Kindle. Book excerpt: This supporting document has been prepared to make the construction specifications for Project W-320 readily available. Project W-320, Waste Retrieval Sluicing System (WRSS), specification is for procurement, fabrication and installation of equipment at the C Tank Farm, including Operator Station and some equipment just outside the C Tank Farm fence, necessary to support the sluicing operation. Work consists of furnishing labor, equipment, and materials to provide the means to procure materials and equipment, fabricate items, excavate and place concrete, and install equipment, piping, wiring, and structures in accordance with the Contract Documents. Major work elements include: Excavation for process and fire protection piping, electrical conduit trenches, and foundations for small structures; Placement of concrete cover blocks, foundations, and equipment pads; Procurement and installation of double walled piping, electrical conduit, fire and raw water piping, chilled water piping, and electrical cable; Procurement and installation of above-ground ventilation system piping between the (HVAC) Process building and Tank C-106; Core drill existing concrete; Furnish and installation of electrical distribution equipment; Installation of the concrete foundation, and assembly installation of the two Seismic Shutdown Systems with Environmental Enclosures; Fabrication and installation of in-pit pipe jumpers, including related valves, instruments and wiring; and Installation of a vertical submersible pump, horizontal booster pump, and winch assembly into tank access riser pits.