National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an ashlar faced stone wall dam with an upstream earth embankment. The dam is about 605 feet long, 12.6 feet high and has a crest width of 54 ft. The dam has been classified as having a high hazard potential. The recommended test flood ranges from a probable maximum flood (1/2 the PMF) to a full PMF. The dam is judged to be in generally fair condition.

National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 101 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of an earth dike, about 250 ft. long on the left bank of the river, and a z-shaped stone masonry spillway about 212 ft. long. The dam itself is generally in good condition. There was no evidence of settlement, lateral movement or other signs of structural failure. It is small in size with a high hazard potential.

National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 78 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam at Shoe Pond, Beverly, Mass., is a 17 foot high, 250 foot long earth embankment with a concrete core wall. The dam is in fair condition. The dam has been classified in the 'small' size and in the 'significant' hazard categories. A test flood equal to 1/2 the PMF was used to evaluate the capacity of the spillway.

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 107 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of a 1,300 foot long, 49.5 foot high earth fill embankment having a concrete core wall. The reservoir is a pump storage facility, having no inlet stream or spillway. Between the design high water level, elevation 144, and the top of dam, elevation 147.5, there is 221 acre-feet of available storage. This capacity is sufficient to store all the runoff, 203 acre-feet, from the drainage area. There will be no test flood outflow. The dam will not be overtopped. The following remedial measures should be instituted by the Owner: grass and brush on the dam should be cut and maintained; animal burrows should be filled-in and prevented from reoccuring; trespassing on the dam should be prevented; a formal warning system for the downstream impact area should be developed and the dam should be inspected once every year by a qualified registered professional engineer.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 98 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an earth embankment dam believed to have been constructed around 1900. The facility is used as a bridge across the Agawam River and to impound water for recreational purposes. The dam is about 285 ft. long and 16.5 ft. high. The dam has two spillways. The primary spillway is a concrete sluiceway located near the left abutment. A two bay stoplog structure located at the downstream end of the sluiceway controls flows through the facility. The secondary spillway is a 5 ft. dia. metal pipe culvert located on the right side of the dam. A stoplog structure having a weir length of 5.4 ft. is located on the upstream end of this spillway. An 18 in. dia. outlet passes through the dam near mid-point. Outflow is controlled at a 6 ft. by 8 ft. by 6 ft. upstream concrete intake structure. The dam and appurtenant works are judged to be in fair condition. There is no low level outlet for draining the pond. Seepage was noted at four locations. There was erosion of both the upstream and downstream embankments in the vicinity of the 18 in. dia. outlet pipe. Tree and brush growth is abundant. The test flood inflow is 3,420 cfs; the routed test flood outflow of 3,150 cfs would overtop the low point in the left abutment by about 2.0 ft. The spillways can pass about 7 percent of the routed test flood outflow without overtopping the low point in the left abutment.

National Program for Inspection of Non-Federal Dams. Lancaster Millpond Dam MA 00887, Merrimack River Basin, Clinton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lancaster Millpond Dam MA 00887, Merrimack River Basin, Clinton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lancaster Millpond Dam MA 00887, Merrimack River Basin, Clinton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lancaster Millpond Dam MA 00887, Merrimack River Basin, Clinton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lancaster Millpond Dam is a stone-masonry structure with stone abutments. It is 490 feet long and has an estimated hydraulic height of 24.5 feet. The spillway is 190 feet long and discharges to the Nashua River. As a result of the visual inspection and a review of available data, Lancaster Millpond Dam is considered to be in fair condition. Major concerns are: erosion of the soil near the right abutment on the downstream side; trees growing on the soil of the right abutment and on the field nearby; a tree growing out of the stone masonry at the intersection of the dam and the left training wall; seepage through the spillway; and the lack of controls on diversion and discharge structures. The test flood inflow was estimated to be 14,800 cubic feet per second (cfs) and resulted in an outflow discharge estimated to be 14,800 cfs, which would overtop the dam crest by about 13 feet. This would result in the water rising to within about 1 foot of the bridge at State Routes 62 and 70 immediately upstream of the dam.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1118 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985 with total page 1118 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams, Shaker Mill Pond Dam (MA 00732), Housatonic River Basin, West Stockbridge, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Shaker Mill Pond Dam (MA 00732), Housatonic River Basin, West Stockbridge, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 93 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Shaker Mill Pond Dam (MA 00732), Housatonic River Basin, West Stockbridge, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Shaker Mill Pond Dam (MA 00732), Housatonic River Basin, West Stockbridge, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: Shaker Mill Pond Dam consists of a gunite covered concrete and masonry spillway structure between approach channel walls and abutting earth roadway embankments. The overall length of the dam is about 50 ft. and its maximum height is 20.4 ft. There are two regulating outlets at the dam site. The dam is in fair condition, based on a visual examination of the structure. Several deficiencies, mainly due to deterioration, were noted. However, there was no evidence of settlement, lateral movement or other signs of structural failure of the dam, or other conditions which would warrant urgent remedial action. With the water level at the top of dam (level of Route 102 bridge deck), the ungated spillway capacity is approximately 1,600 cfs which is 6 percent of the test flood outflow.

National Program for Inspection of Non-Federal Dams. Old Grist Mill Pond Dam (MA 00668), Blackstone River Basin, Upton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Old Grist Mill Pond Dam (MA 00668), Blackstone River Basin, Upton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 67 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Old Grist Mill Pond Dam (MA 00668), Blackstone River Basin, Upton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Old Grist Mill Pond Dam (MA 00668), Blackstone River Basin, Upton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill embankment 90 feet long and 24 feet high with concrete headwalls on the upstream and downstream slopes. There is a concrete outlet structure located on the upstream face of the dam. The structure contains three weirs and a grated outlet. The following are visible signs of distress which indicate a potential hazard at the site: erosion and spalling of the concrete on the outlet structure; slight seepage at the top of the outlet gate; slight seepage at the toe of the dam; a small tree growing at the toe of the dam; erosion of the embankment slopes near the west abutment; accumulation of rock debris in the floor of the box culvert; and minor efflorescence, cracking and seepage in the walls of the box culvert. In addition, the channel downstream of the dam contains heavy overgrowth of trees and brush, an accumulation of rock and soil 2 feet above the floor of the box culvert, and pieces of rock fallen from the side walls. The outlet structure can only discharge 29 percent of the test flood before overtopping the dam occurs. In the event flow overtops the dam, complete failure of the dam is unlikely to occur. The highway pavement and concrete headwalls will serve to protect the dam under flood conditions. However, erosion of the dam could occur, resulting in a breach and partial failure of the dam.

National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The South Barre Mill Pond dam is a small dam consisting of two adjacent concrete ogee spillways, a short earth embankment on the right side and an outlet works to a penstock at the left abutment. The present dam, constructed about 1904, was extensively damaged in the floods of 1936 and 1938 and has been reconstructed on several occasions, the latest work in 1944. The dam is in fair to good condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway will not pass one-half the probable maximum flood and the spillway is considered inadequate, Recommendations for remedial work include repair of concrete at the left training wall and right spillway weir and restoration of gates to good operating condition. Additional investigation of the right spillway weir is recommended, since no data are available concerning this portion of the structure.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam MA 00436, Merrimack River Basin, Ashland, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam MA 00436, Merrimack River Basin, Ashland, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam MA 00436, Merrimack River Basin, Ashland, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam MA 00436, Merrimack River Basin, Ashland, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 250 ft. long and 10 ft. high. The dam is in poor condition. It is small in size and has a hazard potential of 'high'. As an alternative to modifying and repairing the seriously inadequate existing structure consideration should be given to replacing it with a properly designed new dam or removing the dam altogether. (Author).

National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a former mill pond dam about 330 ft. long. It has a maximum height of about 8 ft. Past inspection records and the lack of operating and maintenance procedures, there are several deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It is small in size with a hazard potential of high.

National Program for Inspection of Non-Federal Dams. Williams Mill Pond Dam (MA 00121), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Williams Mill Pond Dam (MA 00121), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 55 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Williams Mill Pond Dam (MA 00121), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Williams Mill Pond Dam (MA 00121), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: Williams Mill Pond Dam is a 360-foot long, 14-foot high earthfill dam. The original dam at this site, which was constructed around 1888, was partly rebuilt after being washed out in 1923. There is no other information available on the construction of this dam. The stone masonry spillway has a sharp-crested concrete weir and a stepped stone cascade. The 47-foot long spillway crest has been breached in a 20.2-foot section near the right training wall. The crest is at Elevation (EL) 505.4 in the breached section and 508.0 in the unbreached section. There is no apparent outlet at this dam. The dam is in poor condition. The following are visible signs of distress that could indicate a potential hazard at the site: breached section of the spillway; lack of a low level outlet; erosion at several locations along the embankment and down the left bank of the discharge channel; possible seepage through the left embankment; dense growth of trees and brush on both slopes and on the spillway crest; loose and displaced stone blocks on the spillway, the side walls, and the apron of the cascade; erosion and unidentified flow from beneath the concrete retaining wall; and accumulation of branches and debris in the downstream channel. An outflow test flood of 4,170 cfs (one-fourth the estimated probable maximum flood) will overtop the dam by a maximum of 1.8 feet. The spillway can discharge 45 percent of the outflow test flood.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 56 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00575), Connecticut River Basin, Springfield, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 56 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is about 48 ft. long and 13 ft. high. It is constructed of cut stone masonry. The dam is generally in poor condition. The right end of the dam has had a partial failure at the crest. The dam is classified as small in size with a hazard potential of low. Recommendations for remedial work include repair of the failed area at the right end of the crest of the dam, the plugging of pressure leaks in the dam and mortaring of open joints, and the repair of erosion damage at the right abutment. (Author).

National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 88 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: White's Mill Pond dam which was built before 1923 is a 340-foot long earthfill dam with upstream and downstream dry stone masonry walls. The dam has a maximum height of 13 feet and consists of a spillway, low level outlet, an intake toi a plant, and an earth dike. The following deficiencies were observed at the site: severe seepage at several locations along the toe of the dam; downstream stone masonry walls are out of plumb; lack of access to the low level outlet operator; erosion at the low point of the dam crest; bulging of the downstream masonry wall in several locations; stone missing from the upstream face of the spillway, mortar missing from the stone masonry spillway of the dam; heavy growth of brush and trees on the dam crest and on the dike; and an accumulation of debris in the discharge channel. Hydraulic analyses indicate that the spillway (without stoplogs) can discharge 520 cfs, or 76 percent of the test flood outflow before the dam is overtopped. (With the stoplogs, the spillway can discharge 170 cfs or 22 percent of the test flood outflow before the dam is overtopped).

National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 133 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt: