National Program for Inspection of Non-Federal Dams. Cedar Swamp Pond Dam (MA 00628), Charles River Basin, Milford, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cedar Swamp Pond Dam (MA 00628), Charles River Basin, Milford, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cedar Swamp Pond Dam (MA 00628), Charles River Basin, Milford, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cedar Swamp Pond Dam (MA 00628), Charles River Basin, Milford, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Cedar Swamp Pond dam, which was constructed in 1939, consists of an 11 foot high concrete spillway combined with an 8 foot high earthfill embankment. The concrete ogee-type spillway is about 100 feet long. The outlet control is comprised of two 4-foot square steel slide gates located in the left abutment of the spillway section. Based on the visual inspection, drawings available for the dam, and past operational performance, it is judged that Cedar Swamp Pond Dam is in good condition. However, there are a number of problems which should be corrected. These include: local erosion of the dam slopes, large trees on the dam embankment, spalling of the spillway concrete, and an accumulation of weeds, soil, and debris in the downstream channel. It was also noted that the access plates to the flashboards on the spillway deck are welded shut. Hydraulic analyses indicate that the existing spillway can discharge a flow of 2,840 cubic feet per second (cfs) at Elevation (El) 272.5 which is the minimum top of the dam. The spillway is adequate to discharge the inflow test flood of 3,513 cfs (one-half of the probable maximum flood) without significantly overtopping the main dam.

National Program for Inspection of Non-Federal Dams. Red Dam (MA 00170), Charles River Basin, Wrentham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Red Dam (MA 00170), Charles River Basin, Wrentham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 123 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Red Dam (MA 00170), Charles River Basin, Wrentham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Red Dam (MA 00170), Charles River Basin, Wrentham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 123 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 133 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 107 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an ashlar faced stone wall dam with an upstream earth embankment. The dam is about 605 feet long, 12.6 feet high and has a crest width of 54 ft. The dam has been classified as having a high hazard potential. The recommended test flood ranges from a probable maximum flood (1/2 the PMF) to a full PMF. The dam is judged to be in generally fair condition.

National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 77 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chaffin Pond Dam is actually a section of roadway embankment approximately 135 ft. long, 11 ft. high and with a minimum width of 100 ft. Three submerged culvert outlets pass through the dam between upstream and downstream headwalls, allowing the water level to be the same on both sides of the dam. The control entrance to the assumed 30-in. diameter outlet on the left side has slots for stoplogs; however, none are in place. The control for a 4-ft. box culvert in the center is an open wood gate. The third outlet culvert is also gated but apparently blocked. Water from Chaffin Pond flows to outlet works at a second pond downstream from the dam where water is drawn for hydraulic research purposes. The dam is in poor condition, based on a visual examination of the structure. The headwalls have experienced major structural failures and the potential for a collapse of the upstream headwall with possible obstruction of flow to the outlet does exist. Hydraulic analyses indicate that the test flood would surcharge the pond by 680 acre-ft. and raise the pond level to about 4.2 ft. below the top of the dam. Therefore, no overtopping would be expected.

National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 89 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Pond Dam is an earthfill embankment with a maximum height of about 10 feet and a relatively straight crest about 225 feet long, averaging about 20 feet wide. The dam is considered to be in good condition. The dam is classified as small in size with a significant hazard potential.

National Program for Inspection of Non-Federal Dams. Bolivar Pond Dam (MA 00807), Neponset River Basin, Canton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Bolivar Pond Dam (MA 00807), Neponset River Basin, Canton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 77 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Bolivar Pond Dam (MA 00807), Neponset River Basin, Canton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Bolivar Pond Dam (MA 00807), Neponset River Basin, Canton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Bolivar Pond Dam is an earth embankment approximately 150 feet long. Both the upstream and downstream faces of the dam are vertical stone walls. Bolivar Street, which is approximately 40 feet wide, is located on the crest of the dam. The concrete overflow service spillway is located approximately 250 feet right of the dam. The drop-inlet closed conduit auxiliary spillway is located about 175 feet to the right of the service spillway. The dam appears to be in poor condition. Several indications of structural cracking are apparent on both the upstream wall and the downstream wall which is a wall of the Town of Canton DPW garage. About 5 gpm seepage was noted discharging from the downstream wall inside the Town of Canton garage. The dam does not have a reservoir drain system. The test flood inflow for the facility is approximately 9,410 cfs. The routed test flood outflow of 9.405 cfs overtops the dam by 2.9 feet. The spillway system is able to pass 115 cfs or about 1 percent of the routed test flood outflow without overtopping the dam.

National Program for Inspection of Non-Federal Dams. Quinsigamond Pond Dam (MA 00139), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Quinsigamond Pond Dam (MA 00139), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 130 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Quinsigamond Pond Dam (MA 00139), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Quinsigamond Pond Dam (MA 00139), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 130 pages. Available in PDF, EPUB and Kindle. Book excerpt: Quinsigamond Pond Dam is an earthfill dam with an arched, stone masonry spillway. The dam and spillway is about 240 feet long and 18 feet high. The dam is considered to be in fair condition. In addition, the dam has been classified in the 'high' hazard category. Based on size and hazard classification, the test flood is 1/2 the PMF.

National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 87 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 87 pages. Available in PDF, EPUB and Kindle. Book excerpt: Simonds Pond is approximately 365 feet long and has a hydraulic height of 26 feet. The storage capacity is 86.5 acre-feet. The dam has a concrete cap and stone abutments. The emergency spillway is 48 feet long and occupies the center portion of the dam. As a result of the visual inspection and a review of available data, Simonds Pond Dam is considered to be in poor condition. Major concerns are: significant seepage at the toe of the dam; missing mortar and poor condition of the joints of the spillway; extensive spalling and cracking of the concrete cap on the top of the dam and spillway; deterioration of the spillway apron; extensive spalling of the concrete gatehouse foundation; and inadequate spillway capacity. The test flood inflow was estimated to be 2,500 cfs and resulted in an outflow discharge estimated to be 2,460 cfs, which would overtop the dam by approximately 1.3 feet. The maximum spillway capacity with the water level at the dam crest was estimated to be 700 cfs, which is approximately 28 percent of the test flood discharge.

National Program for Inspection of Non-Federal Dams, Crocker Pond Dam (MA 00638), Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Crocker Pond Dam (MA 00638), Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 106 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Crocker Pond Dam (MA 00638), Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Crocker Pond Dam (MA 00638), Merrimack River Basin, Westminster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 106 pages. Available in PDF, EPUB and Kindle. Book excerpt: Crocker Pond Dam is a 520-foot long earthfill dam built in 1933 for storage. The facility has a maximum height of 38.5 feet and includes a spillway, flood gate, gate house and outlet structures. The spillway is a concrete ogee weir, 120-feet long (including the closed flood gate). There are five separate outlets for the dam, and 8-foot wide by 12-foot high flood gate, which when closed is part of the spillway; a 42-inch diameter main low level outlet; a 24-inch diameter auxiliary low level outlet; a 3-foot square drain; and a 3-foot square trash chute. The following deficiencies were observed at the site: spalled, cracked and deteriorated concrete on the east and west approach channel sidewalls, the spillway face, the sidewall between the spillway and the flood gate, the east and west sidewalls of the spillway, and the west face of the gate house; burrow holes and foot paths on the downstream face of the dam; missing stones along the downstream bench of the east section of the dam; logs and debris caught on the spillway weir and trees overhanging the west side of the downstream channel. The test flood would overtop the dam by 2.2 feet with no flashboards in place andf 3.8 feet with flashboards in place. Hydraulic analyses indicate that the spillway without flashboards can discharge 10,500 cfs, or 57 percent of the test flood outflow before the dam is overtopped with flashboards, the spillway can discharge 6,300 cfs or 34 percent of the test flood outflow before the dam is overtopped. This assumes that the flood gate remains closed during the test flood.

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 98 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an earth embankment dam believed to have been constructed around 1900. The facility is used as a bridge across the Agawam River and to impound water for recreational purposes. The dam is about 285 ft. long and 16.5 ft. high. The dam has two spillways. The primary spillway is a concrete sluiceway located near the left abutment. A two bay stoplog structure located at the downstream end of the sluiceway controls flows through the facility. The secondary spillway is a 5 ft. dia. metal pipe culvert located on the right side of the dam. A stoplog structure having a weir length of 5.4 ft. is located on the upstream end of this spillway. An 18 in. dia. outlet passes through the dam near mid-point. Outflow is controlled at a 6 ft. by 8 ft. by 6 ft. upstream concrete intake structure. The dam and appurtenant works are judged to be in fair condition. There is no low level outlet for draining the pond. Seepage was noted at four locations. There was erosion of both the upstream and downstream embankments in the vicinity of the 18 in. dia. outlet pipe. Tree and brush growth is abundant. The test flood inflow is 3,420 cfs; the routed test flood outflow of 3,150 cfs would overtop the low point in the left abutment by about 2.0 ft. The spillways can pass about 7 percent of the routed test flood outflow without overtopping the low point in the left abutment.

National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Thirty Acre Pond Dam is an earthen dam about 600 ft. long and 13 ft. high. The dam is in fair condition. The dam is considered to be small in size and has a high hazard potential. The spillway test flood selected is Probable Maximum Flood. Investigations are recommended to check the adequacy of the structure under seismic loading, etc.

National Program for Inspection of Non-Federal Dams. Nagog Pond Dam (MA 00129), Merrimack River Basin, Acton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Nagog Pond Dam (MA 00129), Merrimack River Basin, Acton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 86 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Nagog Pond Dam (MA 00129), Merrimack River Basin, Acton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Nagog Pond Dam (MA 00129), Merrimack River Basin, Acton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a concrete gravity section keyed into bed-rock. The top of the dam is approximately 168 ft. long and 15 ft. high. The dam is in good condition, based on a visual examination of the structure. Although some deficiencies were noted, there was no evidence of settlement, lateral movement or other signs of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classification in accordance with Corps of Engineers guidelines, the test flood for this dam is the 100-year flood. With the water level at top of dam, the spillway has a capacity of 60 cfs. Hydraulic analyses indicate the test flood outflow of 22 cfs (17.7 csm) can be passed with a freeboard of 0.76 ft. remaining.

National Program for Inspection of Non-Federal Dams. Stodge Meadow Pond Dam (MA 00009), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Stodge Meadow Pond Dam (MA 00009), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 65 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Stodge Meadow Pond Dam (MA 00009), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Stodge Meadow Pond Dam (MA 00009), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: Stodge Meadow Pond Dam is formed by an approximately 250 ft. long earth embankment which has a maximum height of 15 ft. A conduit spillway controlled by an overflow weir with stoplogs and a gated outlet conduit are both appurtenant to the dam. The dam is over 100 years old, except for the conduit spillway, which was constructed in 1977. The pond has a maximum storage capacity of about 900 acre-ft. and is used for recreational purposes by the surrounding group of property owners, who collectively own the pond and dam. The dam is in good condition, based on a visual examination of the structure. Although some deficiencies were noted, there was no evidence of settlement, lateral movement or other signs of structural failure or other conditions which would warrant urgent remedial action. With the water level at the top of the dam, the ungated spillway capacity is 325 cfs. Hydraulic analyses indicate that the test flood outflow of 240 cfs (inflow 605 cfs or 2,600 csm) can be passed with a freeboard of 0.4 ft. and an unused surcharge-storage of 210 acre-ft. remaining.

National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 103 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Haskell Pond Dam (MA 00155), Massachusetts Coastal Basin, Gloucester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 103 pages. Available in PDF, EPUB and Kindle. Book excerpt: