National Dam Safety Program. Stony Creek Number 9 (Inventory Number VA 17101), Shenandoah County, State of Virginia, Phase I Inspection Report

Download National Dam Safety Program. Stony Creek Number 9 (Inventory Number VA 17101), Shenandoah County, State of Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Stony Creek Number 9 (Inventory Number VA 17101), Shenandoah County, State of Virginia, Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Stony Creek Number 9 (Inventory Number VA 17101), Shenandoah County, State of Virginia, Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1048 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government reports annual index

Download Government reports annual index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 906 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government reports annual index by :

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 906 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1432 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1979 with total page 1432 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 840 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1979 with total page 840 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Potomac River Basin. Woodstock (Inventory Number VA 17104, Shenandoah County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Potomac River Basin. Woodstock (Inventory Number VA 17104, Shenandoah County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac River Basin. Woodstock (Inventory Number VA 17104, Shenandoah County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Potomac River Basin. Woodstock (Inventory Number VA 17104, Shenandoah County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Lower North River Number 81C (Inventory Number VA 16506). Rockingham County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lower North River Number 81C (Inventory Number VA 16506). Rockingham County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lower North River Number 81C (Inventory Number VA 16506). Rockingham County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Lower North River Number 81C (Inventory Number VA 16506). Rockingham County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Toms Creek Dam (Inventory Number VA 19510), Wise County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Toms Creek Dam (Inventory Number VA 19510), Wise County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 79 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Toms Creek Dam (Inventory Number VA 19510), Wise County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Toms Creek Dam (Inventory Number VA 19510), Wise County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 79 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Moss Number 2 (Inventory Number VA 16705), Russell County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Moss Number 2 (Inventory Number VA 16705), Russell County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Moss Number 2 (Inventory Number VA 16705), Russell County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Moss Number 2 (Inventory Number VA 16705), Russell County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, DC 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Johns Creek Dam Number 1, Inventory Number VA-04502. Craig County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Johns Creek Dam Number 1, Inventory Number VA-04502. Craig County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 93 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Johns Creek Dam Number 1, Inventory Number VA-04502. Craig County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Johns Creek Dam Number 1, Inventory Number VA-04502. Craig County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 93 pages. Available in PDF, EPUB and Kindle. Book excerpt: Johns Creek No. 1 Dam is a zoned, earthfill dam approximately 1500 feet long and 62 feet high. The dam, located approximately 21 miles southwest of New Castle, Virginia, is used for flood control. Visual inspection and office analyses indicate no deficiencies requiring emergency attention. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the 1/2 Proabable Maximum Flood (1/2 PMF) was selected as the spillway design flood (SDF). The SDF was routed through the reservoir and found to overtop the dam by a maximum depth of 1.6 feet with an average critical velocity of 3.4 f.p.s. Total duration of dam overtopping would be approximately 5.8 hours. The spillway is capable of passing only 25 percent of the PMF and is therefore judged as inadequate. The dam and appurtenant structures were found to be in generally good overall condition. No conditions indicating embankment instability were detected during the field inspection and office analyses.

National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report

Download National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 67 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : michael Baker (III.)

Download or read book National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by michael Baker (III.) and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Roanoke Number 72A Inventory Number VA-03702. Roanoke River Basin, Charlotte County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Roanoke Number 72A Inventory Number VA-03702. Roanoke River Basin, Charlotte County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 91 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Roanoke Number 72A Inventory Number VA-03702. Roanoke River Basin, Charlotte County, State of Virginia. Phase I Inspection Report by : Roland B. Phillips

Download or read book National Dam Safety Program. Roanoke Number 72A Inventory Number VA-03702. Roanoke River Basin, Charlotte County, State of Virginia. Phase I Inspection Report written by Roland B. Phillips and published by . This book was released on 1979 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: Roanoke Creek No. 72A is a zoned, earthfill dam approximately 650 feet long and 46 feet high. The dam, located on Twittys Creek approximately 2 miles east of the Town of Drakes Branch, Virginia, is used for flood control. Roanoke No. 72A dam is an 'intermediate' 'size-high' hazard structure as defined by the Recommended Guidelines for Safety Inspection of Dams. Visual inspection and office analyses indicate no deficiencies requiring emergency attention.

National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report

Download National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. Phase I reports include project information, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 128 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report by : Carl S Anderson (Jr)

Download or read book National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report written by Carl S Anderson (Jr) and published by . This book was released on 1981 with total page 128 pages. Available in PDF, EPUB and Kindle. Book excerpt: Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1979 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including remedial measures.