National Dam Safety Program. J. Bristow Lake Dam (MO 30985), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. J. Bristow Lake Dam (MO 30985), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. J. Bristow Lake Dam (MO 30985), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report by : Steve Brady

Download or read book National Dam Safety Program. J. Bristow Lake Dam (MO 30985), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report written by Steve Brady and published by . This book was released on 1980 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report presents the results of field inspection and evaluation of the J. Bristow Lake Dam (MO 30985). This dam has been classified as unsafe, non-emergency by the St. Louis District as a result of the application of the following criteria: (a) Spillway will not pass 50 percent of the Probable Maximum Flood without overtopping the dam; (b) Overtopping of the dam could result in failure of the dam; and (c) Dam failure significantly increases the hazard to loss of life downstream.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 206 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 206 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1620 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1982 with total page 1620 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Mach Lake Dam (MO 30133), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Mach Lake Dam (MO 30133), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Mach Lake Dam (MO 30133), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report by : Steven L. Brady

Download or read book National Dam Safety Program. Mach Lake Dam (MO 30133), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report written by Steven L. Brady and published by . This book was released on 1981 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of this inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the combined spillways do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The combined spillways will pass 14 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the low height of dam (33 feet) and the small storage capacity (103 acre-ft), fifty percent of the PMF has been determined to be the appropriate spillway design flood. The 100-year flood (1 percent probability flood) will not overtop the dam. The 1 percent probability flood is one that has a 1 percent chance of being exceeded in any given year.

National Dam Safety Program. Stubblefield Lake Dam (MO 30363), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Stubblefield Lake Dam (MO 30363), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 66 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Stubblefield Lake Dam (MO 30363), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report by : ANDERSON ENGINEERING INC SPRINGFIELD MO.

Download or read book National Dam Safety Program. Stubblefield Lake Dam (MO 30363), Mississippi - Kaskaskia - St. Louis River Basin, Crawford County, Missouri. Phase I Inspection Report written by ANDERSON ENGINEERING INC SPRINGFIELD MO. and published by . This book was released on 1980 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: Our inspection and evaluation indicates that the combined spillways do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The combined spillways will pass 30 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the low height of the dam and the small storage capacity, 50 percent of the PMF has been determined to be the appropriate spillway design flood. The 1 percent probability flood will not overtop the dam. The 1 percent probability flood is one that has a 1 percent chance of being exceeded in any given year. Deficiencies visually observed by the inspection team were: scattered trees and brush on both the upstream and downstream face; lack of wave protection for the upstream embankment face; minor erosion at the left downstream dam-abutment contact; minor slough above the outlet of the drawdown pipe; and possible seepage area beyond the downstream toe on the left side of the valley. Another deficiency was the lack of seepage and stability analysis records.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1300 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1982 with total page 1300 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

National Dam Safety Program. Holiday Lake Dam (MO 30587), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Holiday Lake Dam (MO 30587), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Holiday Lake Dam (MO 30587), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report by : Steve Brady

Download or read book National Dam Safety Program. Holiday Lake Dam (MO 30587), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report written by Steve Brady and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is located in the southeastern part of Crawford County, Missouri on Shoal Creek. The dam was constructed primarily for recreational purposes, although some flood protection is also provided. The dam appears to be generally in good condition. Some sloughing of the upstream slope above the riprap was noted. The riprap consists of concrete and rock rubble from old buildings. A few small trees were observed on the downstream face of the embankment. The horizontal and vertical alignments of the crest are good. No surface cracking of the embankment was noted. Shallow auger probes into the embankment indicated the dam to consist of a reddish brown silty clay with rock fragments. Information from the builder indicates that the borrow material for construction of the embankment was obtained from the hillside in the east abutment area, the emergency spillway area and the lake area.

National Dam Safety Program. R. Haas & A. Heck Dam (MO 30526), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. R. Haas & A. Heck Dam (MO 30526), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 52 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. R. Haas & A. Heck Dam (MO 30526), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report by : ANDERSON ENGINEERING INC SPRINGFIELD MO.

Download or read book National Dam Safety Program. R. Haas & A. Heck Dam (MO 30526), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report written by ANDERSON ENGINEERING INC SPRINGFIELD MO. and published by . This book was released on 1979 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. City Park Lake Dam (MO 30588), Upper Mississippi - Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. City Park Lake Dam (MO 30588), Upper Mississippi - Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 39 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. City Park Lake Dam (MO 30588), Upper Mississippi - Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report by : Ervin H. Baumeyer

Download or read book National Dam Safety Program. City Park Lake Dam (MO 30588), Upper Mississippi - Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report written by Ervin H. Baumeyer and published by . This book was released on 1978 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: This report was prepared under the National Program of Inspection of Non-Federal Dams. This report assesses the general condition of the dam with respect to safety, based on available data and on visual inspection, to determine if the dam poses hazards to human life or property. (Author).

National Dam Safety Program. Spring Lake Dam (MO 31180), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Spring Lake Dam (MO 31180), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 64 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Spring Lake Dam (MO 31180), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report by : Nathan Wilcoxon

Download or read book National Dam Safety Program. Spring Lake Dam (MO 31180), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report written by Nathan Wilcoxon and published by . This book was released on 1981 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Lake Dam is an earthfill structure approximately 21 feet high and 400 feet long at the crest. The appurtenant works consist of a drop-inlet pipe principal spillway and a trapezoidal channel cut into natural ground at the left abutment which acts as an emergency spillway. Our inspection and evaluation indicates that the spillway has not met the criteria set forth in the guidelines for a small size dam in the high hazard potential category. This structure has the capability to hold and pass approximately 40 percent of the Probable Maximum Flood (PMF) before overtopping. The dam appeared to be in fair condition. Deficiencies visually observed by the inspection team were: (1) a row of trees (approximately 8) along the upstream face of the dam; (2) a significant potential for restriction to flow into the principal spillway intake; (3) some minor erosion on the downstream face of the dam; (4) the emergency spillway channel is partially obstructed by six steel drums and a fence; and (5) minor seepage into the principal spillway conduit from within the embankment.

National Dam Safety Program. Ellis Lake Dam (MO 31067), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Ellis Lake Dam (MO 31067), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Ellis Lake Dam (MO 31067), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report by : Steve Brady

Download or read book National Dam Safety Program. Ellis Lake Dam (MO 31067), Mississippi - Kaskaskia - St. Louis River Basin, Perry County, Missouri. Phase I Inspection Report written by Steve Brady and published by . This book was released on 1981 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: Ellis Lake Dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Our inspection and evaluation indicates that the combined spillways do not meet the criteria set forth in the guidelines for a dam of its size and hazard potential. The combined spillways will pass 13 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the low height of the dam and the small storage capacity, 50 percent of the PMF has been determined to be the appropriate spillway design flood. The 1 percent probability flood will not overtop the dam. The 1 percent probability flood is one that has a 1 percent chance of being exceeded in any given year.

National Dam Safety Program. Spring Lake Dam (MO 30725), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Spring Lake Dam (MO 30725), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 59 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Spring Lake Dam (MO 30725), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report by : Richard G. Berggreen

Download or read book National Dam Safety Program. Spring Lake Dam (MO 30725), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report written by Richard G. Berggreen and published by . This book was released on 1980 with total page 59 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam has been classified as unsafe, non-emergency by the St Louis District as a result of the application of the following criteria: (a) Spillway will not pass 50 percent of the Probable Maximum Flood without overtopping the dam; (b) Overtopping of the dam could result in failure of the dam; and (c) Dam failure significantly increases the hazard to loss of life downstream.

National Dam Safety Program. Kemp Lake Dam (M0 30035), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Kemp Lake Dam (M0 30035), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Kemp Lake Dam (M0 30035), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report by : Steve Brady

Download or read book National Dam Safety Program. Kemp Lake Dam (M0 30035), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report written by Steve Brady and published by . This book was released on 1979 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the spillway does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The spillway will pass 17 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the small volume of water impounded, the small size of the dam and the large floodplain downstream, 50 percent of the PMF has been determined to be the appropriate spillway design flood.

National Dam Safety Program. Haladale Lake Dam (MO 30527), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Haladale Lake Dam (MO 30527), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 53 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Haladale Lake Dam (MO 30527), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report by : Steve Brady

Download or read book National Dam Safety Program. Haladale Lake Dam (MO 30527), Mississippi - Kaskaskia - St. Louis Basin, Crawford County, Missouri. Phase I Inspection Report written by Steve Brady and published by . This book was released on 1979 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. The inspection and evaluation indicates that the combined spillways do meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The combined spillways will pass 62 percent of the Probable Maximum Flood without overtopping. The Probable Maximum Flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorologic and hydrologic conditions that are reasonably possible in the region. The guidelines require that a dam of small size with a high downstream hazard potential pass 50 to 100 percent of the PMF. Considering the small size of the dam, the low impoundment capacity of the reservoir and the large floodplain downstream, 50 percent of the PMF has been determined to be the appropriate spillway design flood.

National Dam Safety Program. PJ's Bass Lake Dam (MO 31189), Mississippi - Kaskaskia - St. Louis Basin, St. Francois County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. PJ's Bass Lake Dam (MO 31189), Mississippi - Kaskaskia - St. Louis Basin, St. Francois County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 73 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. PJ's Bass Lake Dam (MO 31189), Mississippi - Kaskaskia - St. Louis Basin, St. Francois County, Missouri. Phase I Inspection Report by : Richard G. Berggreen

Download or read book National Dam Safety Program. PJ's Bass Lake Dam (MO 31189), Mississippi - Kaskaskia - St. Louis Basin, St. Francois County, Missouri. Phase I Inspection Report written by Richard G. Berggreen and published by . This book was released on 1981 with total page 73 pages. Available in PDF, EPUB and Kindle. Book excerpt: This dam has been classified as unsafe, non-emergency by the St. Louis District as a result of the application of the following criteria: (a) Spillway will not pass 50 percent of the Probable Maximum Flood without overtopping the dam; (b) Overtopping of the dam could result in failure of the dam; and (c) Dam failure significantly increases the hazard to loss of life downstream.

National Dam Safety Program. Lake Boutin Dam (MO 40008), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Lake Boutin Dam (MO 40008), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Boutin Dam (MO 40008), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report by : Nathan Wilcoxon

Download or read book National Dam Safety Program. Lake Boutin Dam (MO 40008), Mississippi - Kaskaskia - St. Louis River Basin, Cape Girardeau County, Missouri. Phase I Inspection Report written by Nathan Wilcoxon and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Boutin Dam is an earthfill structure approximately 45.5 feet high and 674 feet long at the crest. The dam has no drawdown facilities and the spillway is a trapezoidal channel cut into natural ground at the left abutment. Our inspection and hydrologic and hydraulic analyses indicate that the spillway capacity of the dam does not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. The dam will hold and pass approximately 50 percent of the Probable Maximum Flood (PMF) without overtopping. The overall condition of the dam appeared to be poor and several deficiencies were noted during the inspection.

National Dam Safety Program. Dresser Number 4 Dam (MO 30474), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report

Download National Dam Safety Program. Dresser Number 4 Dam (MO 30474), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 65 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dresser Number 4 Dam (MO 30474), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report by : Kenneth B. King

Download or read book National Dam Safety Program. Dresser Number 4 Dam (MO 30474), Mississippi - Kaskaskia - St. Louis Basin, Washington County, Missouri. Phase I Inspection Report written by Kenneth B. King and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of Dresser No. 4 Dam is to impound tailings from a barite separation and beneficiation operation. The dam completely encircles the impoundment except for a 300-foot wide breach at the north (up-stream) end where the structure failed in 1975. The dam cannot retain water in its present state because of this breach in the dam. This dam is classified as large. The U.S. Corps of Engineers has classified it as having a high downstream hazard potential to indicate that failure of this dam could threaten life and property. The damage zone, estimated by the U.S. Corps of Engineers, extends about 6 miles downstream of the dam. Since the embankment cannot retain water, the overtopping potential of the embankment was not analyzed. Instead, studies were made to estimate the amount of flow that could occur in the diversion ditch (located to the west and south of the impoundment) under different flood conditions. It was calculated that the diversion ditch could pass a 100-year flood probably without significant erosion of the ditch or adjacent embankment toe. However, it was estimated that the ditch cannot pass 50 percent of the Probable Maximum Flood without significant erosion of the ditch and adjacent embankment materials.