National Dam Safety Program. Edmondson Dam (Inventory Number VA 19103), Tennessee River Basin, Washington County, Virginia, Phase I Inspection Report

Download National Dam Safety Program. Edmondson Dam (Inventory Number VA 19103), Tennessee River Basin, Washington County, Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 42 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Edmondson Dam (Inventory Number VA 19103), Tennessee River Basin, Washington County, Virginia, Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Edmondson Dam (Inventory Number VA 19103), Tennessee River Basin, Washington County, Virginia, Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 228 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 228 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Hidden Valley Lake (Inventory Number VA 19104) Tennessee River Basin, Washington County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Hidden Valley Lake (Inventory Number VA 19104) Tennessee River Basin, Washington County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Hidden Valley Lake (Inventory Number VA 19104) Tennessee River Basin, Washington County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Hidden Valley Lake (Inventory Number VA 19104) Tennessee River Basin, Washington County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Hidden Valley Lake Dam is an earthfill embankment structure about 560 feet long and 32.3 feet high. The dam is classified as an intermediate size dam with a significant hazard classification. The principal spillway is a concrete drop-inlet riser, and the emergency spillway is an open channel in the right abutment. The dam is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The spillways will pass 39 percent of the PMF or 78 percent of the SDF without overtopping the dam. The SDF will overtop the dam by 1.1 feet, reach an average critical velocity of 4.8 feet per second (fps) and flow over the dam for 2.5 hours. Flows overtopping the dam during the SDF are not considered detrimental to the structure. The spillways are adjudged as inadequate, but not seriously inadequate.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 940 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1981 with total page 940 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 990 pages
Book Rating : 4.:/5 (334 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1981-03 with total page 990 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Black Creek Lake Dam (Inventory Number VA 19513), Tennessee River Basin, Wise County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Black Creek Lake Dam (Inventory Number VA 19513), Tennessee River Basin, Wise County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 39 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Black Creek Lake Dam (Inventory Number VA 19513), Tennessee River Basin, Wise County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Black Creek Lake Dam (Inventory Number VA 19513), Tennessee River Basin, Wise County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is classified as a small size dam with a significant hazard classification. The primary spillway consists of five 6-inch diameter PVC pipes passing through the concrete wier forming the secondary spillway. The spillways will pass 16 percent of the PMF or about 50 percent of the SDF without overtopping the dam. The spillways are adjudged as inadequate but not seriously inadequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures.

National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : michael Baker (III.)

Download or read book National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by michael Baker (III.) and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Warrenton Dam is comprised of a 550 foot long concrete slab and buttress dam and two earthen dikes separated by a grassy knoll. The dikes are in the reservoir located in a low lying area north of the dam. One dike is about 300 feet long and 13 feet high. The other dike, perpendicular to the first, is about 175 feet long and 6 feet high. A concrete intake structure comprised of three 8-inch intakes at different elevations allows flow to discharge into the stream below the dam, furnishing water to the Warrenton Filtration Plant about 2 miles downstream. The concrete intake structure also has a 24-inch inlet and a 24-inch outlet. The maximum height is 30.8 feet for the concrete spillway. The dam is located 0.5 miles north of the Warrenton town limits and is used as the water supply for Warrenton, Virginia. The dam is owned and maintained by the Town of Warrenton, Virginia. The dam is classified as a small dam with a significant hazard classification. Based on criteria established by the Department of the Army Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 100 year flood. Since the spillway was sized for the 21 percent PMF, which is greater than the 100 year flood, the spillway is adjudged as adequate.

National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam is an earthfill structure about 738 feet long and 40.5 feet high. The dam is classified as 'intermediate' on the basis of size, and given a hazard classification of 'significant' on the basis of downstream area development. The principal spillway consists of an octagonally shaped concrete riser with eight rectangular openings serving as drop inlets. The emergency spillway is an open concrete channel cut at the right abutment. The spillway will pass 41 percent of the PMF or 82 percent of the SDF without overtopping the crest of the dam. The spillway is adjudged inadequate but not seriously inadequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures.

National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 77 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Goshen Dam, Inventory Number: VA-16301. Rockbridge County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Goshen Dam, Inventory Number: VA-16301. Rockbridge County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 81 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Goshen Dam, Inventory Number: VA-16301. Rockbridge County, Virginia. Phase I Inspection Report by : SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA.

Download or read book National Dam Safety Program. Goshen Dam, Inventory Number: VA-16301. Rockbridge County, Virginia. Phase I Inspection Report written by SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA. and published by . This book was released on 1979 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Laurel Bed Dam Number (VA 16701), Tennessee River Basin, Russell County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Laurel Bed Dam Number (VA 16701), Tennessee River Basin, Russell County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Laurel Bed Dam Number (VA 16701), Tennessee River Basin, Russell County, Virginia. Phase I Inspection Report by : Thomas E. Roberts

Download or read book National Dam Safety Program. Laurel Bed Dam Number (VA 16701), Tennessee River Basin, Russell County, Virginia. Phase I Inspection Report written by Thomas E. Roberts and published by . This book was released on 1978 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering technicques employed give a reasonable accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Powell Dam, (Inventory Number VA 08336), Roanoke River Basin, City of South Boston, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Powell Dam, (Inventory Number VA 08336), Roanoke River Basin, City of South Boston, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 41 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Powell Dam, (Inventory Number VA 08336), Roanoke River Basin, City of South Boston, Virginia. Phase I Inspection Report by : ARMY ENGINEER DISTRICT NORFOLK VA.

Download or read book National Dam Safety Program. Powell Dam, (Inventory Number VA 08336), Roanoke River Basin, City of South Boston, Virginia. Phase I Inspection Report written by ARMY ENGINEER DISTRICT NORFOLK VA. and published by . This book was released on 1980 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Powell dam is an earthen embankment about 400 feet long and 25.3 feet high. The dam is owned and maintained by Mr. Fred Powell. The dam is classified as a small dam with a high hazard classification (on the basis of location). The spillway is an earthen channel located at the left abutment. The reservoir is used to irrigate surrounding cropland. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass 37 percent of the PMF and 80 percent of the SDF without overtopping the lowest point on the dam crest. The SDF will overtop the lowest point on the dam crest by 0.2 feet with an average critical velocity of 2.1 feet per second and flow over the dam for 0.5 hours. Therefore, the spillway is adjudged as inadequate but not seriously inadequate. The visual inspection revealed no apparent problems or remedial measures in need of immediate attention. There is no formal regular maintenance operation program or warning system, and it is recommended that a formal maintenance program and warning system be established. The maintenance items listed should be accomplished as a part of the regular maintenance program within the next 12 months.