Read Books Online and Download eBooks, EPub, PDF, Mobi, Kindle, Text Full Free.
Magma Gulf Technadril Dept Of Energy Mgt Doe Amoco Fee No 1 Well Cameron Parish Louisiana
Download Magma Gulf Technadril Dept Of Energy Mgt Doe Amoco Fee No 1 Well Cameron Parish Louisiana full books in PDF, epub, and Kindle. Read online Magma Gulf Technadril Dept Of Energy Mgt Doe Amoco Fee No 1 Well Cameron Parish Louisiana ebook anywhere anytime directly on your device. Fast Download speed and no annoying ads. We cannot guarantee that every ebooks is available!
Book Synopsis Magma Gulf/technadril Dept. of Energy MGT-DOE Amoco Fee No. 1 Well Cameron Parish, Louisiana by :
Download or read book Magma Gulf/technadril Dept. of Energy MGT-DOE Amoco Fee No. 1 Well Cameron Parish, Louisiana written by and published by . This book was released on 1980 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Geothermal Energy Update written by and published by . This book was released on 1981-06 with total page 300 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Download or read book Energy Research Abstracts written by and published by . This book was released on 1981 with total page 1740 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Book Synopsis Government reports annual index by :
Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 940 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Book Synopsis Gladys McCall Geopressured Design Well. Annual Progress Report, October 1, 1980-September 30, 1981. T-F and S/DOE Gladys McMcall No. 1 Well, Cameron Parish, Louisiana by :
Download or read book Gladys McCall Geopressured Design Well. Annual Progress Report, October 1, 1980-September 30, 1981. T-F and S/DOE Gladys McMcall No. 1 Well, Cameron Parish, Louisiana written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The following aspects of the geopressured design well program are described: administration, control systems, financial summary, procurement, sites, significant problems, and future plans. (MHR).
Book Synopsis T-F and S/DOE Gladys McCall No. 1 Well, Cameron Parish, Louisiana. Geopressured-geothermal Well Report, Volume II. Well Workover and Production Testing, February 1982-October 1985. Final Report by :
Download or read book T-F and S/DOE Gladys McCall No. 1 Well, Cameron Parish, Louisiana. Geopressured-geothermal Well Report, Volume II. Well Workover and Production Testing, February 1982-October 1985. Final Report written by and published by . This book was released on 1985 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The T-F and S/DOE Gladys McCall No. 1 well was the fourth in a series of wells in the DOE Design Wells Program that were drilled into deep, large geopressured-geothermal brine aquifers in order to provide basic data with which to determine the technological and economic viability of producing energy from these unconventional resources. This brine production well was spudded on May 27, 1981 and drilling operations were completed on November 2, 1981 after using 160 days of rig time. The well was drilled to a total depth of 16,510 feet. The target sands lie at a depth of 14,412 to 15,860 feet in the Fleming Formation of the lower Miocene. This report covers well production testing operations and necessary well workover operations during the February 1982 to October 1985 period. The primary goals of the well testing program were: (1) to determine reservoir size, shape, volume, drive mechanisms, and other reservoir parameters, (2) to determine and demonstrate the technological and economic viability of producing energy from a geopressured-geothermal brine aquifer through long-term production testing, and (3) to determine problem areas associated with such long-term production, and to develop solutions therefor.
Book Synopsis T-F and S/DOE Gladys McCall No. 1 Well, Cameron Parish, Louisiana. Geopressured-geothermal Well Report, Volume II. Well Workover and Production Testing, February 1982-October 1985. Final Report. Appendices 1-7 by :
Download or read book T-F and S/DOE Gladys McCall No. 1 Well, Cameron Parish, Louisiana. Geopressured-geothermal Well Report, Volume II. Well Workover and Production Testing, February 1982-October 1985. Final Report. Appendices 1-7 written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: These appendices contain the following reports: (1) investigation of coupling failure from the Gladys McCall No. 1 well; (2) failure analysis - oil well casing coupling; (3) technical remedial requirements for 5-inch production tubing string; (4) reservoir limit test data for sand zone No. 9; (5) reservoir fluid study - sand zone No. 9; (6) engineering interpretation of exploration drawdown tests; and (7) reservoir analysis. (ACR).
Book Synopsis Drilling and Completion Test Well and Disposal Well by : Magma Gulf-Technadril
Download or read book Drilling and Completion Test Well and Disposal Well written by Magma Gulf-Technadril and published by . This book was released on with total page 325 pages. Available in PDF, EPUB and Kindle. Book excerpt:
Book Synopsis Godchaux Well No. 1, Vermilion Parish, Louisiana by :
Download or read book Godchaux Well No. 1, Vermilion Parish, Louisiana written by and published by . This book was released on 1981 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Godchaux Well No. 1 was originally drilled too a total depth of 16,000 feet in January, 1981 by C and K Petroleum, Inc. and was temporarily abandoned. The well was re-entered by Eaton on 6 August 1981 in an effort to clean out the original open hole below the 7-5/8 inch liner and test a section of the Planulina sand at a depth ranging from 15,584 to 15,692 feet. The reservoir pressure was estimated to be 14,480 psi, and the temperature of the formation water was expected to be 298°F. The water salinity was predicted to be 70,000 ppM. The well was expected to produce up to 20,000 BWPD, was a gas content of 44 SCF per barrel. An optional test of a zone from 14,905 to 15,006 feet was also proposed in the detailed completion prognosis, which preceded the attempted test. In the process of drilling the cement plug set by the original operators, the drill string became side-tracked from the original hole. While drilling at 14,510 feet a severe loss of circulation of drilling fluid occurred through a hole in the intermediate casing. The reduction in hydrostatic head resulting from lost circulation caused the open hole to close around and stick the drill string. Efforts to repair the intermediate casing and return to normal operations were estimated to be prohibitively expensive in view of the expected poor probability of success; accordingly, the decision to plug and abandon was carried out on September 12, 1981.