Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade

Download Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade by :

Download or read book Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In order to provide a higher performance building block cryomodule for the CEBAF 12 GeV upgrade, modifications have been made to the design of the Upgrade Cryomodule. The prototype cryomodule will be completed in 2004 and be installed for operation in CEBAF. Design changes enable the use of higher gradient cavities to achieve greater than 100 MV per cryomodule while not exceeding the budgeted cryogenic load of 300 W during steady-state operation.

Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

Download Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade by : G. Davis

Download or read book Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade written by G. Davis and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup.

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

Download Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 3 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project by :

Download or read book Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project written by and published by . This book was released on 2012 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes

Download Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes by : T. Powers

Download or read book Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes written by T. Powers and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: We have installed two new cryomodules, one in the nuclear physics accelerator (CEBAF) and the other in the Free Electron Laser (FEL) of Jefferson Lab. The new cryomodules consist of 7-cell cavities with the original CEBAF cell shape and were designed to deliver gradients of 70 MV/module. Several significant design innovations were demonstrated in these cryomodules. This paper describes the production procedures, the performance characteristics of these cavities in vertical tests, results of tests in the new cryomodule test facility (CMTF) as well as the commissioning in the CEBAF tunnel and FEL. Performances and limitations after installation in the accelerators are discussed in this paper along with improvements proposed for future cryomodules.

Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade

Download Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade by :

Download or read book Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is nearing completion of an energy upgrade from 6 to 12 GeV. An integral part of the upgrade is the addition of ten new cryomodules, each consisting of eight seven-cell superconducting radio-frequency (SRF) cavities. An average performance of 100+MV of acceleration per cryomodule is needed to achieve the 12 GeV beam energy goal. The production methodology was for industry to provide and deliver the major components to Jefferson Lab, where they were tested and assembled into cryomodules. The production process begins with an inspection upon receiving of all major components followed by individual performance qualification testing. The SRF cavities received their final chemical processing and cleaning at Jefferson Lab. The qualified components along with all associated hardware and instrumentation are assembled, tested, installed into CEBAF and run through an integrated system checkout in preparation for beam operations. The production process is complete and one of the first completed cryomodules has successfully produced 108 MV of acceleration with a linac beam current of 465?A.

Optimization of the SRF Cavity Design for the Cebaf 12 GeV Upgrade

Download Optimization of the SRF Cavity Design for the Cebaf 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (893 download)

DOWNLOAD NOW!


Book Synopsis Optimization of the SRF Cavity Design for the Cebaf 12 GeV Upgrade by :

Download or read book Optimization of the SRF Cavity Design for the Cebaf 12 GeV Upgrade written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Based on initial testing of the "HG" and "LL" 7-cell cavities in the prototype cryomodule Renascence, several opportunities for improved optimization were identified. The HOM damping configuration was refined so as to meet the requirements for damping key dipole modes while simultaneously dramatically reducing risk of HOM pickup probe heating and also creating beamline clearance for mounting the tuner to stainless steel helium vessel endplates (rather than NbTi/Ti transitions to a titanium helium vessel). Code modeling and bench measurements were performed. The new design maintains the 7-cell LL cells and incorporates a brazed transition between Nb and the SS helium vessel. The resulting configuration is now called the "C100" design. Cavity design details as well as vertical dewar and horizontal test bed performance are presented.

Performance of the Cebaf Prototype Cryomodule Renascence

Download Performance of the Cebaf Prototype Cryomodule Renascence PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (893 download)

DOWNLOAD NOW!


Book Synopsis Performance of the Cebaf Prototype Cryomodule Renascence by :

Download or read book Performance of the Cebaf Prototype Cryomodule Renascence written by and published by . This book was released on 2008 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The prototype cryomodule Renascence was constructed as an energy building block for securing 6 GeV operation of CEBAF and to validate design elements for future CEBAF upgrade modules. These elements include the new "HG" and "LL" 7-cell cavity designs and a new tuner design.[1,2] Issues were identified during initial testing in 2005. The module has been reworked to address the issues with thermal stability, component breakage, and tuner motion. In addition, opportunity was taken to employ upgraded cleaning and assembly techniques for the cavity string. The HOM coupler heating issue was resolved, and seven of the eight cavities in the cryomodule have run stably at an average of 20 MV/m CW. The cryogenic, rf, and mechanical performance of the cryomodule are presented. Commissioning in CEBAF has just been completed in October 2007.

CEBAF Upgrade

Download CEBAF Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 8 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis CEBAF Upgrade by :

Download or read book CEBAF Upgrade written by and published by . This book was released on 2014 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

MECHANICAL CAVITY DESIGN FOR 100MV UPGRADE CRYOMODULE.

Download MECHANICAL CAVITY DESIGN FOR 100MV UPGRADE CRYOMODULE. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis MECHANICAL CAVITY DESIGN FOR 100MV UPGRADE CRYOMODULE. by :

Download or read book MECHANICAL CAVITY DESIGN FOR 100MV UPGRADE CRYOMODULE. written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: To achieve up to 6 GeV, each cryomodule in the CEBAF accelerator currently provides about 30 MV of acceleration. To raise the accelerator energy to 12 GeV, ten additional cryomodules capable of providing over 100 MV of acceleration are required. A prototype of the 100 MV cryomodule has been designed, is presently under construction, and will be completed in 2004. This prototype cryomodule comprises two new cavity designs, four cavities of the low loss design and four cavities of the high gradient design. Although the cavity shapes were designed for their RF properties, the mechanical implications must be considered. In addition to the new cavity shapes, changes have also been made to the cavity end dish assemblies, weld joints, and stiffening rings. This paper will present the results of the stress and vibration analyses used for designing the cryomodule.

12 GeV Upgrade Project - Cryomodule Production

Download 12 GeV Upgrade Project - Cryomodule Production PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis 12 GeV Upgrade Project - Cryomodule Production by :

Download or read book 12 GeV Upgrade Project - Cryomodule Production written by and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

A 100 MV Cryomodule for CW Operation

Download A 100 MV Cryomodule for CW Operation PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis A 100 MV Cryomodule for CW Operation by : Charles Reece

Download or read book A 100 MV Cryomodule for CW Operation written by Charles Reece and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: A cryomodule designed for high-gradient CW operation has been built at Jefferson Lab. The Renascence cryomodule is the final prototype of a design for use in the 12 GeV CEBAF upgrade. The module uses eight 7-cell 1497 MHz cavities to be individually powered by 13 kW klystrons. Specifications call for providing>109 MV CW with

Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine

Download Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (8 download)

DOWNLOAD NOW!


Book Synopsis Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine by :

Download or read book Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine written by and published by . This book was released on 1928 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB).

Download CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB). PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB). by :

Download or read book CEBAF Upgrade Cryomodule Component Testing in the Horizontal Test Bed (HTB). written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The planned upgrade of the CEBAF electron accelerator includes the development of an improved cryomodule. Several components differ substantially from the original CEBAF cryomodule; these include: the new 7-cell, 1.5 GHz cavities with integral helium vessel, a new, backlash-free cavity tuner, the waveguide coupler with its room-temperature ceramic window, and the HOM damping filters. In order to test the design features and performance of the new components, a horizontal cryostat (Horizontal Test Bed) has been constructed which allows testing with a turn around time of less than three weeks. This cryostat provides the environment for testing one or two cavities, with associated auxiliary components, in a condition similar to that of a real cryomodule. A series of tests has been performed on a prototype 7-cell cavity and the above-mentioned systems. In this paper the results of the tests on the cryostat, on the cavity performance, on its coupler, on the tuner characteristics, and on the microphonics behavior will be reported.

High Gradient Operation with the CEBAF Upgrade RF Control System

Download High Gradient Operation with the CEBAF Upgrade RF Control System PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis High Gradient Operation with the CEBAF Upgrade RF Control System by : G. Davis

Download or read book High Gradient Operation with the CEBAF Upgrade RF Control System written by G. Davis and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF Accelerator at Jefferson Lab is presently a 6 GeV five pass electron accelerator consisting of two superconducting linacs joined by independent magnetic transport arcs. Energy will be upgraded to 12 GeV with the addition of 10 new high gradient cryomodules (17+ MV/m). The higher gradients pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new LLRF control system is needed. A prototype system has been developed incorporating a large FPGA and using digital down and up conversion to minimize the need for analog components. The new system is more flexible and less susceptible to drifts and component nonlinearities. Because resonance control is critical to reach high gradients quickly, the new cryomodules will include a piezoelectric tuner for each cavity, and the LLRF controls must incorporate both feedback and feed-forward methods to achieve optimal resonance control performance. This paper discusses development of the new RF system, system performance for phase and amplitude stability and resonance control under Lorentz detuning measured during recent tests on a prototype cryomodule.

Treaty Series

Download Treaty Series PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 506 pages
Book Rating : 4.:/5 (812 download)

DOWNLOAD NOW!


Book Synopsis Treaty Series by :

Download or read book Treaty Series written by and published by . This book was released on 1991 with total page 506 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Development of a Cryomodule for the CEBAF Upgrade

Download Development of a Cryomodule for the CEBAF Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Development of a Cryomodule for the CEBAF Upgrade by :

Download or read book Development of a Cryomodule for the CEBAF Upgrade written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Long-term plans for the CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of those plans, an Upgrade Cryomodule, capable of providing more than three times the voltage of the original CEBAF cryomodule specification within the same length, is under development. In particular, this requires the development of superconducting cavities capable of consistently operating at gradients above 12 MV/m and Q(approximately)101°, new frequency tuners with excellent resolution, and cavity control systems.

Advances in Cryogenic Engineering

Download Advances in Cryogenic Engineering PDF Online Free

Author :
Publisher : Springer
ISBN 13 : 1461542154
Total Pages : 967 pages
Book Rating : 4.4/5 (615 download)

DOWNLOAD NOW!


Book Synopsis Advances in Cryogenic Engineering by : Quan-Sheng Shu

Download or read book Advances in Cryogenic Engineering written by Quan-Sheng Shu and published by Springer. This book was released on 2013-12-19 with total page 967 pages. Available in PDF, EPUB and Kindle. Book excerpt: In recent years, the technology of cryogenic comminution has been widely applied in the field of chemical engineering, food making, medicine production, and particularly in recycling of waste materials. Because of the increasing pollution of waste tires and the shortage of raw rubber resource, the recycling process for waste rubber products has become important and commercially viable. This technology has shown a great number of advantages such as causing no environmental pollution, requiring low energy consumption and producing high quality products. Hence, the normal crusher which was used to reclaim materials, such as waste tires, nylon, plastic and many polymer materials at atmospheric 12 temperature is being replaced by a cryogenic crusher. • In the cryogenic crusher, the property of the milled material is usually very sensitive to temperature change. When a crusher is in operation, it will generate a great deal of heat that causes the material temperature increased. Once the temperature increases over the vitrification temperature, the material property will change and lose the brittle behavior causing the energy consumption to rise sharply. Consequently, the comminution process cannot be continued. Therefore, it is believed that the cryogenic crusher is the most critical component in the cryogenic comminution system. The research on the temperature increase and energy consumption in the cryogenic crusher is not only to reduce the energy consumption of the crasher, but also to reduce the energy consumption of the cryogenic system.