Author : Jüri Sutt
Publisher : John Wiley & Sons
ISBN 13 : 1118556070
Total Pages : 117 pages
Book Rating : 4.1/5 (185 download)
Book Synopsis The Engineer's Manual of Construction Site Planning by : Jüri Sutt
Download or read book The Engineer's Manual of Construction Site Planning written by Jüri Sutt and published by John Wiley & Sons. This book was released on 2013-05-28 with total page 117 pages. Available in PDF, EPUB and Kindle. Book excerpt: This handbook addresses problems facing the engineer when preparing to build, both during the contract bidding phase and after a contract has been concluded. It offers clear guidelines for planning the resources and machinery on site, as well as the safe positioning of roads, cranes, storage and temporary buildings. Site planning activities are presented here in logical sequence, offering an efficient and safe design of the construction site and of the temporary works. The book describes the process of engineering preparation of on-site construction works in all phases of the construction life-cycle, from the design phase - preparing the financial plan and procurement scheme for the owner before tendering the contract; the tendering phase; and after bid completion. A list of procedures is presented for planning the construction site in order to simplify the engineer’s work of site and temporary works planning. The Engineer’s Manual of Construction Site Planning is for all those involved in the planning of construction sites, construction managers, construction engineers and quantity surveyors, as well as for students in civil engineering and construction.