Author :
Publisher :
ISBN 13 :
Total Pages : 6 pages
Book Rating : 4.:/5 (684 download)
Book Synopsis Advanced Reservoir Characterizstion in the Antelope Shale to Establish the Viability of CO2 Enhanced Oil Recovery in California's Monterey Formation Siliceous Shales. Quarterly Report, July 1 - September 30, 1996 by :
Download or read book Advanced Reservoir Characterizstion in the Antelope Shale to Establish the Viability of CO2 Enhanced Oil Recovery in California's Monterey Formation Siliceous Shales. Quarterly Report, July 1 - September 30, 1996 written by and published by . This book was released on 1996 with total page 6 pages. Available in PDF, EPUB and Kindle. Book excerpt: The primary objective of this research is to conduct advanced reservoir characterization and modeling studies in the Antelope Shale reservoir. Characterization studies will be used to determine the technical feasibility of implementing a CO2 enhanced oil recovery project in the Antelope Shale in Buena Vista Hills field. The Buena Vista Hills Pilot CO2 project will demonstrate the economic viability and widespread applicability of CO2 flooding in fractured siliceous shales reservoirs of the San Joaquin Valley. The research consists of four primary work processes: Reservoir Matrix and Fluid Characterization; Fracture Characterization; Reservoir Modeling and Simulation; and, CO2 Pilot Flood and Evaluation. Work done in these areas is subdivided into two phases or budget periods. The first phase of the project will focus on the application of a variety of advanced reservoir characterization techniques to determine the production characteristics of the Antelope Shale reservoir. Reservoir models based on the results of the characterization work will be used to evaluate how the reservoir will respond to secondary recovery and EOR processes. The second phase of the project will include the implementation and evaluation of an advanced enhanced oil recovery (EOR) pilot in the West Dome of the Buena Vista Hills field. The project took a major step in the third quarter of 1996 with the drilling of the pilot injector well. The well spudded on July 1 and was completed on July 29 at a total measured depth of 4907 ft. The well was cored continuously through the entire Brown Shale and the productive portion of the Antelope Shale to just below the P2 e-log marker. The reservoir matrix and fluid characterization are discussed in this report.