National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 78 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Shoe Pond Dam (MA 00183) Danvers River Basin, Beverly, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 78 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam at Shoe Pond, Beverly, Mass., is a 17 foot high, 250 foot long earth embankment with a concrete core wall. The dam is in fair condition. The dam has been classified in the 'small' size and in the 'significant' hazard categories. A test flood equal to 1/2 the PMF was used to evaluate the capacity of the spillway.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 760 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985 with total page 760 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00161) Danvers River Basin, Danvers, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an ashlar faced stone wall dam with an upstream earth embankment. The dam is about 605 feet long, 12.6 feet high and has a crest width of 54 ft. The dam has been classified as having a high hazard potential. The recommended test flood ranges from a probable maximum flood (1/2 the PMF) to a full PMF. The dam is judged to be in generally fair condition.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1160 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1160 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 77 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Chaffin Pond Dam (MA 00621), Merrimack River Basin, Holden, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Chaffin Pond Dam is actually a section of roadway embankment approximately 135 ft. long, 11 ft. high and with a minimum width of 100 ft. Three submerged culvert outlets pass through the dam between upstream and downstream headwalls, allowing the water level to be the same on both sides of the dam. The control entrance to the assumed 30-in. diameter outlet on the left side has slots for stoplogs; however, none are in place. The control for a 4-ft. box culvert in the center is an open wood gate. The third outlet culvert is also gated but apparently blocked. Water from Chaffin Pond flows to outlet works at a second pond downstream from the dam where water is drawn for hydraulic research purposes. The dam is in poor condition, based on a visual examination of the structure. The headwalls have experienced major structural failures and the potential for a collapse of the upstream headwall with possible obstruction of flow to the outlet does exist. Hydraulic analyses indicate that the test flood would surcharge the pond by 680 acre-ft. and raise the pond level to about 4.2 ft. below the top of the dam. Therefore, no overtopping would be expected.

National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 133 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 89 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Spring Pond Dam MA 00193, North River Basin, Peabody, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 89 pages. Available in PDF, EPUB and Kindle. Book excerpt: Spring Pond Dam is an earthfill embankment with a maximum height of about 10 feet and a relatively straight crest about 225 feet long, averaging about 20 feet wide. The dam is considered to be in good condition. The dam is classified as small in size with a significant hazard potential.

National Program for Inspection of Non-Federal Dams. Pierce Pond Dam (MA 00883) Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Pierce Pond Dam (MA 00883) Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 81 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Pierce Pond Dam (MA 00883) Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Pierce Pond Dam (MA 00883) Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a 470 ft. long earthfill dam with a maximum height of 14 ft. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally the dam is in poor condition. It is small in size with a hazard potential of high. (Author).

National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 122 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Wampanoag Dam is approximately 660 feet long including the spillway and has a maximum height of approximately 22 feet. It consists of an earth embankment with riprap at the upstream face and a loamed and seeded crest and downstream face. Based on the size classification (intermediate) and hazard potential classification (high), the spillway test flood is the PMF.

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Bailey Pond (MA 00180) Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Bailey Pond (MA 00180) Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Bailey Pond (MA 00180) Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Bailey Pond (MA 00180) Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: Bailey Pond Dam, Amesbury, Mass., is a 180 foot long earth embankment with concrete walls forming a portion of the upstream face of the dam and the approach channel to the spillway. The height of the dam is 15 ft. which is the height of the inlet chamber below the spillway. The dam and spillway are generally in fair condition. A test flood equal to 1/4 the PMF was selected.

National Program for Inspection of Non-Federal Dams. Browns Pond Dam MA 00192, North River Basin, Peabody, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Browns Pond Dam MA 00192, North River Basin, Peabody, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Browns Pond Dam MA 00192, North River Basin, Peabody, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Browns Pond Dam MA 00192, North River Basin, Peabody, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: Browns Pond Dam is an earthfill embankment about 200-feet long, with a maximum height of about 5 feet and a crest of about 10 feet. The dam has inadequacies and deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The dam is classified as small in size with a low hazard potential.

National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 98 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Dam (MA 00027), Wareham River Basin, Wareham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 98 pages. Available in PDF, EPUB and Kindle. Book excerpt: Mill Pond Dam is an earth embankment dam believed to have been constructed around 1900. The facility is used as a bridge across the Agawam River and to impound water for recreational purposes. The dam is about 285 ft. long and 16.5 ft. high. The dam has two spillways. The primary spillway is a concrete sluiceway located near the left abutment. A two bay stoplog structure located at the downstream end of the sluiceway controls flows through the facility. The secondary spillway is a 5 ft. dia. metal pipe culvert located on the right side of the dam. A stoplog structure having a weir length of 5.4 ft. is located on the upstream end of this spillway. An 18 in. dia. outlet passes through the dam near mid-point. Outflow is controlled at a 6 ft. by 8 ft. by 6 ft. upstream concrete intake structure. The dam and appurtenant works are judged to be in fair condition. There is no low level outlet for draining the pond. Seepage was noted at four locations. There was erosion of both the upstream and downstream embankments in the vicinity of the 18 in. dia. outlet pipe. Tree and brush growth is abundant. The test flood inflow is 3,420 cfs; the routed test flood outflow of 3,150 cfs would overtop the low point in the left abutment by about 2.0 ft. The spillways can pass about 7 percent of the routed test flood outflow without overtopping the low point in the left abutment.

National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 49 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam appears to be in good condition, The 'V' spillway is 90 ft. long with effective abutments of about 10 ft. on either end. The dam is about 15 ft. high at the abutments. Although the dam is in the small size category the hazard potential is extremely high and thus the situation was analyzed using the full probable maximum flood. A failure of the dam would overflow the left bank immediately below the dam, flood nearby buildings and streets.

National Program for Inspection of Non-Federal Dams. Weymouth Great Pond Dam (MA 00777), Weymouth Back River Basin, Weymouth, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Weymouth Great Pond Dam (MA 00777), Weymouth Back River Basin, Weymouth, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Weymouth Great Pond Dam (MA 00777), Weymouth Back River Basin, Weymouth, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Weymouth Great Pond Dam (MA 00777), Weymouth Back River Basin, Weymouth, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam, which is a 190-foot long, earthfill dam, was built in about 1884. The height of the dam, from the crest to the bottom of the stream bed, is 8.5 feet. The spillway is located in the middle of the dam, and consists of two overflow sections separated by a concrete wall. There is no emergency low level outlet to the pond. The following are visible signs of distress at the site: deterioration of the stoplogs in the east spillway; erosion at several locations on the embankments; growth of trees and brush on the crest and upstream slopes of the dam; a depression in middle of east embankment crest; missing and dislodged riprap on the upstream slopes; spalled concrete in the spillway structure and side walls; cracked inlet headwall of the box culvert, and accumulated debris in the discharge channel. With the stoplogs in place, the spillway can discharge 9 percent of the test flood outflow of 530 cfs. The test flood would overtop the dam by 0.8 feet. Without the stoplogs, the test flood outflow would be 140 cfs at El 161.0, and would not overtop the dam.

National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 87 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Simonds Pond Dam (MA 00874), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1981 with total page 87 pages. Available in PDF, EPUB and Kindle. Book excerpt: Simonds Pond is approximately 365 feet long and has a hydraulic height of 26 feet. The storage capacity is 86.5 acre-feet. The dam has a concrete cap and stone abutments. The emergency spillway is 48 feet long and occupies the center portion of the dam. As a result of the visual inspection and a review of available data, Simonds Pond Dam is considered to be in poor condition. Major concerns are: significant seepage at the toe of the dam; missing mortar and poor condition of the joints of the spillway; extensive spalling and cracking of the concrete cap on the top of the dam and spillway; deterioration of the spillway apron; extensive spalling of the concrete gatehouse foundation; and inadequate spillway capacity. The test flood inflow was estimated to be 2,500 cfs and resulted in an outflow discharge estimated to be 2,460 cfs, which would overtop the dam by approximately 1.3 feet. The maximum spillway capacity with the water level at the dam crest was estimated to be 700 cfs, which is approximately 28 percent of the test flood discharge.

National Program for Inspection of Non-Federal Dams. Dorothy Pond Dam (MA 00146), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Dorothy Pond Dam (MA 00146), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Dorothy Pond Dam (MA 00146), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Dorothy Pond Dam (MA 00146), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dorothy Pond Dam which was constructed around 1825 is an earthfill dam with an upstream mortared masonry headwall. The dam has a maximum height of 13 feet and is approximately 200 feet long. The outlet conduit is a 24-inch diameter cast-iron pipe controlled by a rack and pinion operated wooden slide gate. The spillway, which is located 180 feet west and from the dam, consists of a mortared stone paved channel that discharges into an earth channel. Generally, the dam is considered to be in fair condition. However, there are several visible signs of distress which indicate a potential hazard at this site: slight-to-moderate seepage at the downstream toe of the dam, erosion on the upstream headwall and face of the dam, large trees on the dam crest, and accumulation of debris in the spillway channel. Hydraulic analyses indicate that the existing spillway can discharge a flow of 264 cubic feet per second (cfs) at Elevation (El) 396 which is the top of the dam. An inflow test flood of 2,850 cfs (one-half of the probable maximum flood) will overtop the main dam by about 2.0 feet.