National Program for Inspection of Non-Federal Dams. Main Street Dam (MA 00448). Merrimack River Basin. Hudson, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Main Street Dam (MA 00448). Merrimack River Basin. Hudson, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 65 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Main Street Dam (MA 00448). Merrimack River Basin. Hudson, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Main Street Dam (MA 00448). Merrimack River Basin. Hudson, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of earth embankments wtih a stone masonry downstream face and a stone masonry spillway. The left embankment is approximately 200 Ft. long, the right embankment is about 120 ft. long, and the spillway is about 21 ft. long. The left and right embankments are about 18 ft. high while the spillway is about 15 ft. high. The spillway is in good condition with no noticeable deficiencies. The dam has a classification of small and a hazard potential of high.

National Program for Inspection of Non-Federal Dams. Washington Street Dam (MA 00447), Merrimack River Basin, Hudson, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Washington Street Dam (MA 00447), Merrimack River Basin, Hudson, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 74 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Washington Street Dam (MA 00447), Merrimack River Basin, Hudson, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Washington Street Dam (MA 00447), Merrimack River Basin, Hudson, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 74 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a stone masonry spillway 67 feet long and 8 feet high with 15 feet high masonry walls and embankments on each side. The dam is in poor condition. The dam is intermediate in size and has a hazard potential of significant. Investigations are recommended to determine the structural stability of the spillway and to determine the present condition of the former sluiceway.

National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 122 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Wampanoag Dam is approximately 660 feet long including the spillway and has a maximum height of approximately 22 feet. It consists of an earth embankment with riprap at the upstream face and a loamed and seeded crest and downstream face. Based on the size classification (intermediate) and hazard potential classification (high), the spillway test flood is the PMF.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 530 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985-08 with total page 530 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 101 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Snows Mill Pond Dam (MA 00878), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of an earth dike, about 250 ft. long on the left bank of the river, and a z-shaped stone masonry spillway about 212 ft. long. The dam itself is generally in good condition. There was no evidence of settlement, lateral movement or other signs of structural failure. It is small in size with a high hazard potential.

National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 85 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Reservoir Number One (MA 00337) Merrimack River Basin. Framingham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 85 pages. Available in PDF, EPUB and Kindle. Book excerpt: Total length of the dam is about 800 ft. with a height of about 22 ft. Although there were some minor deficiencies noted the dam is considered to be in good condition. It is intermediate in size with a hazard potential of high.

National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 120 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 120 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 81 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Pleasant Street Dam (MA 00838), Merrimack River Basin, Dracut, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pleasant Street Dam consists of an approximately 93 ft. long stone masonry spillway with a brick building at each abutment. The spillway itself is approximately 15 ft. high and probably founded on bedrock. There is a 4 ft. square low-level gated outlet through the spillway structure and stoplogged conduit outlets through the building at the right abutment. The overall condition of Pleasant Street Dam can only be considered fair, primarily because the spillway of the dam was obscured by heavily flowing water and the operation of the low-level outlet was not demonstrated. However, visible portions of the dam are generally in good condition, and the dam is performing adequately. There was no evidence of settlement, lateral movement or other signs of structural failure, or other conditions which would warrant urgent remedial action. With the water level 3.8 ft. above the spillway crest, corresponding to the estimated top of dam level, the spillway capacity is approximately 2,500 cfs, which is 12 percent of the test flood outflow.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1022 pages
Book Rating : 4.:/5 (89 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1022 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Fall Brook Reservoir Dam (MA 00869), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Fall Brook Reservoir Dam (MA 00869), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Fall Brook Reservoir Dam (MA 00869), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Fall Brook Reservoir Dam (MA 00869), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: The impounding structures at Fall Brook Reservoir include a 1392-foot long, 37-foot high main dam with a spillway and outlet, and a 256-foot long, 11-foot high dike. The spillway is located at the south abutment of the dam, and consists of a broad-crested weir 19 feet long with vertical stone masonry training walls that extend the length of the discharge channel. The outlet for the dam consists of a 30-inch diameter cast-iron pipe which discharges at the toe of th dam. The dam is generally in fair condition. The test flood outflow of 2,370 cfs and pool at El 657.6 will overtop the dam by 0.6 feet and the dike by 1.4 feet. The spillway capacity at El 646.2 (the low point on the crest of the dike) is 500 cfs, which is 21 percent of the test flood outflow.

National Program for Inspection of Non-Federal Dams, Lovell Reservoir Dam (MA 00872) and Dike (MA 01334), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Lovell Reservoir Dam (MA 00872) and Dike (MA 01334), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 140 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Lovell Reservoir Dam (MA 00872) and Dike (MA 01334), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Lovell Reservoir Dam (MA 00872) and Dike (MA 01334), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 140 pages. Available in PDF, EPUB and Kindle. Book excerpt: The project is comprised of and 800 foot long, 80 foot hydraulic height, earthfill main dam, and a 18 foot hydraulic height, 1,600 foot long earthfill dike. The main dam has a 78.5 foot long concrete spillway with a 450 foot long concrete and stone outlet channel. The spillway has a capacity of 4,320 cfs (to top of dam elevation 770.5) which is approximately 73 percent of the test flood outflow. The dam and dike are generally in fair condition.

National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill Pond Reservoir Main Dam (MA 01121), Merrimack River Basin, Burlington, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is comprised of a 1,300 foot long, 49.5 foot high earth fill embankment having a concrete core wall. The reservoir is a pump storage facility, having no inlet stream or spillway. Between the design high water level, elevation 144, and the top of dam, elevation 147.5, there is 221 acre-feet of available storage. This capacity is sufficient to store all the runoff, 203 acre-feet, from the drainage area. There will be no test flood outflow. The dam will not be overtopped. The following remedial measures should be instituted by the Owner: grass and brush on the dam should be cut and maintained; animal burrows should be filled-in and prevented from reoccuring; trespassing on the dam should be prevented; a formal warning system for the downstream impact area should be developed and the dam should be inspected once every year by a qualified registered professional engineer.

National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 49 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Stevens Pond Outlet Dam (MA 00232), Merrimack River Basin, Lawrence, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam appears to be in good condition, The 'V' spillway is 90 ft. long with effective abutments of about 10 ft. on either end. The dam is about 15 ft. high at the abutments. Although the dam is in the small size category the hazard potential is extremely high and thus the situation was analyzed using the full probable maximum flood. A failure of the dam would overflow the left bank immediately below the dam, flood nearby buildings and streets.

National Program for Inspection of Non-Federal Dams. Rockwell Pond Dam (MA 00882), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Rockwell Pond Dam (MA 00882), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 73 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Rockwell Pond Dam (MA 00882), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Rockwell Pond Dam (MA 00882), Merrimack River Basin, Leominster, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 73 pages. Available in PDF, EPUB and Kindle. Book excerpt: Rockwell Pond Dam is a 460-foot lon>, 20-foot high earthfill dam built in the 1800's. The 75.7-foot long, modified sharp-crested spillway has a crest at El 416.4. A concrete bridge spans the spillway channel. The main outlet is a 12-inch diameter pipe controlled by a valve which is submerged in a manhole. The following deficiencies were observed at the site: mssing riprap and localized growth of brush and small trees on the upstream face of the right embankment; localized erosion of upstream and downstream earth slopes; voids exposing soil behind the spillway weir wall; cracked or missing mortar from joints in the spillway training walls; spalled concrete and exposed reinforcing steel on the bridge pier; efflorescence and spalling on the underside of the bridge deck; a submerged inoperable valve on the main outlet; and an inoperable slide gate on the intake of the auxiliary outlet. The test flood would overtop the dam by about 1.6 feet. The spillway can discharge 60 percent of the test flood before the dam is overtopped.

National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 144 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Overlook Reservoir Dam and Dike; Dam (MA 00876), Dike (MA 01335), Merrimack River Basin, Fitchburg, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 144 pages. Available in PDF, EPUB and Kindle. Book excerpt: Overlook Reservoir Dam is a 370 foot long, 47 foot high, earth embankment structure with a masonry core wall and a stone masonry gatehouse. There is a separate 900 foot long, 25 foot high dike with an 10 foot long concrete channel spillway, located along the northern part of the reservoir. The visual inspection indicated the dam and dike to be in generally fair condition. Heavy vegetation, animal burrows, surficial sloughing and erosion were observed on the side slopes of the dam. Excessive tree growth and seepage was observed at the dike. Leakage into the valve chamber located upstream of the chlorination building was observed and the functionability of the control valves at the facility are questionable. The test flood outflow requires only 5 percent of the spillways capacity. Therefore, neither the dam or dike would be overtopped by the test flood.

National Program for Inspection of Non-Federal Dams. Ames Pond Dam (MA 01006) Dike A (MA 01296) Merrimack River Basin, Tewksbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Ames Pond Dam (MA 01006) Dike A (MA 01296) Merrimack River Basin, Tewksbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 101 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Ames Pond Dam (MA 01006) Dike A (MA 01296) Merrimack River Basin, Tewksbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Ames Pond Dam (MA 01006) Dike A (MA 01296) Merrimack River Basin, Tewksbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 101 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of an earth dam, two dikes, a spillway and outlet structures. The dam is about 210 ft. long and 9.7 ft. high. Dike A, an earth embankment dike is located on the east rim of the pond about 700 ft. north of the dam. Failure of the dam or dike would flood several homes and several roadways with the potential for the loss of more than a few lives. It is small in size with a hazard potential of high. (Author).

National Program for Inspection of Non-Federal Dams, Sudbury Dam (MA 00741), Merrimack River Basin, Southborough, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Sudbury Dam (MA 00741), Merrimack River Basin, Southborough, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Sudbury Dam (MA 00741), Merrimack River Basin, Southborough, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Sudbury Dam (MA 00741), Merrimack River Basin, Southborough, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sudbury Dam is a dam of intermediate size, consisting of an earth embankment approximately 70 ft. high and a central stone masonry ogee spillway, together approximately 2000 ft. long. The dam is generally in good condition. There were no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway is adequate in size to safely pass the test flood, determined to be the probable maximum flood, without overtopping the dam. Recommendations for remedial work include cutting of grass and brush on the downstream slope and immediately downstream of the toe, and pointing of facing stones at the spillway crest and elsewhere as required.