National Program for Inspection of Non-Federal Dams. Lake Mirimichi Dam (MA 00168), Taunton River Basin, Foxborough, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Mirimichi Dam (MA 00168), Taunton River Basin, Foxborough, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 67 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Mirimichi Dam (MA 00168), Taunton River Basin, Foxborough, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Mirimichi Dam (MA 00168), Taunton River Basin, Foxborough, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Mirimichi Dam is a 620-foot long, 14-foot high earthfill dam including a ogee spillway. The 36.5-foot long, concrete spillway essentially bisects the dam. The outlet conduit is a 24-inch pipe located between the spillway and the right abutment of the dam. Flow through the conduit is controlled by two slide gates housed in a concrete chamber located in the embankment. The dam is in fair condition. The following are visible signs of distress: seepage just beyond the downstream toe of the dam and dike, growth of brush and trees on the dam and dike, erosion at several locations on the embankment, lack of adequate riprap protection on the upstream face of the dam and dike, corrosion of stems on the slide gates and spalled and cracked concrete on the weir and training walls of the spillway. The test flood would overtop the dike by about 2.2 feet, the dam by 0.8 foot, and a swale at the south end of the lake by 1.3 feet. The spillway can discharge only 17.5 percent of the test flood before the dike is overtopped.

National Program for Inspection of Non-Federal Dams. Waldo Lake Dam MA 00426, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Waldo Lake Dam MA 00426, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 90 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Waldo Lake Dam MA 00426, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Waldo Lake Dam MA 00426, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 90 pages. Available in PDF, EPUB and Kindle. Book excerpt: Waldo Lake is an earth dam about 400 ft. long and 17 ft. high. The facility is in fair condition. The spillway capacity is limited and the left dike is essentially unprotected against erosion during any overtopping flow. The size classification is small and the hazard potential is high, the spillway test flood selected is the Probable Maximum Flood.

National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 66 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Mill River Dam (MA 00813), Taunton River Basin, Taunton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam consists of a 120 ft. long spillway which was originally built in 1932. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It has been classified as small in size with a hazard potential of high. A test flood equal to one half the probable maximum flood. Recommendations were presented for constructing additional spillway capacity at both Morey's Bridge and Mill River dams. These recommendations have not been implemented.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1130 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1985 with total page 1130 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Thirty Acre Pond Dam (MA 00423), Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Thirty Acre Pond Dam is an earthen dam about 600 ft. long and 13 ft. high. The dam is in fair condition. The dam is considered to be small in size and has a high hazard potential. The spillway test flood selected is Probable Maximum Flood. Investigations are recommended to check the adequacy of the structure under seismic loading, etc.

National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 122 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Wampanoag Dam (MA 00010), Merrimack River Basin, Ashburnham, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 122 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lake Wampanoag Dam is approximately 660 feet long including the spillway and has a maximum height of approximately 22 feet. It consists of an earth embankment with riprap at the upstream face and a loamed and seeded crest and downstream face. Based on the size classification (intermediate) and hazard potential classification (high), the spillway test flood is the PMF.

National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 120 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lake Gardner Dam (MA 00152), Merrimack River Basin, Amesbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 120 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Falls Pond Dam (MA 00865), Taunton River Basin, North Attleboro, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: Falls Pond Dam is an earthfill dam with a vertical stone masonry wall on the downstream face. The dam is a maximum 19 feet high and 185 feet long including main and auxiliary spillways at the south abutment. The main spillway is separated into three bays, each 15 feet long and controlled by a steel tainter gate. The auxiliary spillway is located adjacent to the main spillway and is ungated. Generally, the dam is i fair condition. Th following are deficiencies and visible signs of distress at the site: lack of a low-level outlet for draining the pond; deterioration of the downstream stone masonry wall; slight seepage through a crack on the auxiliary spillway, and at the toe of the main spillway; spalled concrete on both spillways; missing and dislodged riprap on the upstream face of the dam; trees growing on the embankment; and the accumulation of debris on the spillways and in the discharge channel. An outflow test flood of 7,010 cfs will overtop the dam by 3.1 feet. The spillways have the capacity to discharge 55 percent of the test flood before the dam is overtopped.

National Program for Inspection of Non-Federal Dams, Brockton Reservoir Dam (MA 00786), Taunton River Basin, Avon, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams, Brockton Reservoir Dam (MA 00786), Taunton River Basin, Avon, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 92 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams, Brockton Reservoir Dam (MA 00786), Taunton River Basin, Avon, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams, Brockton Reservoir Dam (MA 00786), Taunton River Basin, Avon, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 92 pages. Available in PDF, EPUB and Kindle. Book excerpt: Brockton Reservoir Dam is a 94 year old earth embankment approximately 1,800 feet long with a top width of 16 feet and a maximum height of about 10 feet. Both the upstream and downstream side slopes are 2H:1V. The concrete spillway with a 25-foot long broad crested weir, which has been fitted with steel flashboards, is located at the left abutment. The dam appears to be in fair condition. Small trees growing from the upstream slope may displace riprap in addition to the riprap already displaced, thus exposing additional embankment to hydraulic erosion. The marshy area near the right abutment immediately downstream of the dam may be an indication of seepage through the dam, foundation or abutment. The dam does not have a low level outlet which could be used to drawdown the reservoir during emergencies. The routed test flood outflow of 2,300 cfs overtops the dam by 0.4 feet. The spillway capacity without overtopping the dam with the flashboards in place is 495 cfs and without the flashboards in place the capacity is 978 cfs or about 22 percent and 43 percent, respectively, of the routed test flood outflow.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1016 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1985 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 86 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Lower Porter Pond Dam (MA 00424) Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 86 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Porter Dam is an ill-defined earth embankment about 200 ft. long with a maximum height of about 12 ft. and a top width averageing 15 ft. The dam appears to be in fair condition. With a classification size of small and a hazard potential of significant, the recommended range for test flood is 1/2 of the Probable Maximum Flood. The owner should implement various operational and maintenance procedures.

National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 83 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Forge Pond Dam (MA 00800), Taunton River Basin, Freetown, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 83 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a former mill pond dam about 330 ft. long. It has a maximum height of about 8 ft. Past inspection records and the lack of operating and maintenance procedures, there are several deficiencies which must be corrected to assure the continued performance of the dam. Generally, the dam is in poor condition. It is small in size with a hazard potential of high.

National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Longwater Pond Dam (MA 00171), Taunton River Basin, Easton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Longwater Pond Dam is a 200-foot long, 10-foot high earth dam. The upstream face of the dam is a vertical concrete wall with earth fill at the toe, and the downstream face is a vertical stone masonry wall. The outlet works consist of a central outlet plus a side channel spillway located to the right of the outlet. The intake to the central outlet is 7 feet by 7.5 feet and controlled by a dual set of stoplogs. The crest of the side channel spillway is 1 foot wide, 85 feet long and 6 feet wide. There are deficiencies which must be corrected to assure the continued performance of this dam. The following signs of distress were noted at the site: absence of riprap on the upstream slope of the dam below the concrete wall; uncompacted earth fill adjacent to the left abutment of the outlet; scoured and eroded concrete on the outlet works; and spalling on the crest of the side channel spillway; cracking and local depressions in the pavement on the crest of the dam. The stoplogs were replaced shortly after the inspection, and the pond level returned on a higher elevation. At a second visit to the site, seepage was noted through the crest of the spillway. The spillway can discharge 50 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 133 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Cook Pond Dam (MA 00123), Blackstone River Basin, Worcester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1978 with total page 133 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 53 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Upper Porter Pond Dam MA 00425, Taunton River Basin, Brockton, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is a gravel and clay fill embankment about 340 feet long with a maximum height of about 11 feet and a top width averaging 80 feet. The dam appears to be in fair condition. The upstream slope and crest are well maintained. It has a classification of small in size and a significant hazard potential. The owner should retain the services of a registered professional engineer for various purposes.

National Program for Inspection of Non-Federal Dams. Fernwood Lake East Dam (MA 01336), Fernwood Lake West Dam (MA 01337), Massachusetts Coastal Basin, Glouchester, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Fernwood Lake East Dam (MA 01336), Fernwood Lake West Dam (MA 01337), Massachusetts Coastal Basin, Glouchester, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 117 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Fernwood Lake East Dam (MA 01336), Fernwood Lake West Dam (MA 01337), Massachusetts Coastal Basin, Glouchester, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Fernwood Lake East Dam (MA 01336), Fernwood Lake West Dam (MA 01337), Massachusetts Coastal Basin, Glouchester, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1980 with total page 117 pages. Available in PDF, EPUB and Kindle. Book excerpt: Fernwood Lake is impounded by three separate earth embankment dams believed to have been built in 1877. (There is also a 325 ft. long South Dike separating a portion of the south end of the lake; however, it has a low hazard potential and thus was excluded from inspection.) East Dam is approximately 100 ft. long and has a maximum height of 5 ft. Its 8-in diameter outlet pipe has been blocked. West Dam is approximately 400 ft. in length and a maximum of 11 ft. in height. It has a 14-in. diameter low-level outlet. The main dam at the north end of the lake is 450 ft. in length, 19 ft. in height and has a 19 ft. long spillway crest. The main Fernwood Lake (North) Dam - MA 00184 was the subject of a previous Phase I Inspection Report dated April 1979. The East and West dams are both in poor condition, based on visual examination of the structures. Hydraulic analyses indicate that the test flood outflow of 370 cfs (inflow 475 cfs or 913 csm) would overtop East Dam by 0.5 ft. and that a freeboard of 1.5 ft. would remain at West Dam. (A freeboard of 1.6 ft. would remain at North Dam and South Dike would be overtopped by 0.3 ft.) With the water level at the top of East Dam, the spillway capacity at North Dam with flashboards in place is about 80 cfs or 22 percent of the peak test flood outflow.

National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report

Download National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 80 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report by : CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.

Download or read book National Program for Inspection of Non-Federal Dams. Singletary Pond Dam (MA 00144), Blackstone River Basin, Millbury, Massachusetts. Phase I Inspection Report written by CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV. and published by . This book was released on 1979 with total page 80 pages. Available in PDF, EPUB and Kindle. Book excerpt: