National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report

Download National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 71 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report by : SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA.

Download or read book National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report written by SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA. and published by . This book was released on 1981 with total page 71 pages. Available in PDF, EPUB and Kindle. Book excerpt: University Commons Dam is a zoned earthfill structure about 300 ft long and 24 ft high. The spillway consists of an ogee shaped, concrete overflow spillway, which extends 254 ft across the dam. The dam is small size structure and is assigned a high hazard classification. The dam is located on Little Westhampton Creek, on the Campus of the University of Richmond in the City of Richmond, Virginia. The lake is used for recreation and is owned and maintained by the University of Richmond. The University Commons Dam spillway runs under the University Commons Building with a 6 ft clearance. The spillway abutments are part of the building foundation, and the building comprises the balance of the dam length beyond the spillway. Based on the criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 75 percent of the Probable Maximum Flood (PMF) or 150 percent of the SDF without reaching the masonry overhang of the University Commons Building. The spillway is rated adequate. The visual inspection did not reveal any problems which would require immediate attention. The dam is considered stable and a stability analysis is not required. An emergency operation and warning plan should be developed.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 200 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 200 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : michael Baker (III.)

Download or read book National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by michael Baker (III.) and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 37 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 46 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report by : MARTIN (DEWARD M) AND ASSOCIATES INC WILLIAMSBURG VA.

Download or read book National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report written by MARTIN (DEWARD M) AND ASSOCIATES INC WILLIAMSBURG VA. and published by . This book was released on 1979 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Grahams Dam (VA-00342). James River Basin. Albermarle County. State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Grahams Dam (VA-00342). James River Basin. Albermarle County. State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Grahams Dam (VA-00342). James River Basin. Albermarle County. State of Virginia. Phase I Inspection Report by : Michael Baker (Jr.)

Download or read book National Dam Safety Program. Grahams Dam (VA-00342). James River Basin. Albermarle County. State of Virginia. Phase I Inspection Report written by Michael Baker (Jr.) and published by . This book was released on 1980 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigations and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigations is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report

Download National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. Phase I reports include project information, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. James River Basin. Sugar Hollow (Inventory Number VA 00303), Albemarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. James River Basin. Sugar Hollow (Inventory Number VA 00303), Albemarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. James River Basin. Sugar Hollow (Inventory Number VA 00303), Albemarle County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. James River Basin. Sugar Hollow (Inventory Number VA 00303), Albemarle County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Birdwood Dam (VA-00344). James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Birdwood Dam (VA-00344). James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 46 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Birdwood Dam (VA-00344). James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : Michael Baker (Jr.)

Download or read book National Dam Safety Program. Birdwood Dam (VA-00344). James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by Michael Baker (Jr.) and published by . This book was released on 1980 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigations and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigations is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Bahnhofs- und Ortsverzeichnis für den Gepäck- und Expreßgutverkehr

Download Bahnhofs- und Ortsverzeichnis für den Gepäck- und Expreßgutverkehr PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 72 pages
Book Rating : 4.:/5 (698 download)

DOWNLOAD NOW!


Book Synopsis Bahnhofs- und Ortsverzeichnis für den Gepäck- und Expreßgutverkehr by :

Download or read book Bahnhofs- und Ortsverzeichnis für den Gepäck- und Expreßgutverkehr written by and published by . This book was released on 1983 with total page 72 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Swift Creek Reservoir Dam (Inventory Number VA-04112), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Swift Creek Reservoir Dam (Inventory Number VA-04112), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 104 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Swift Creek Reservoir Dam (Inventory Number VA-04112), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Swift Creek Reservoir Dam (Inventory Number VA-04112), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 104 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report

Download National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Ragged Mountain Dam Number 1 (VA00304), James River Basin, Albemarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Ragged Mountain Dam Number 1 (VA00304), James River Basin, Albemarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Ragged Mountain Dam Number 1 (VA00304), James River Basin, Albemarle County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Ragged Mountain Dam Number 1 (VA00304), James River Basin, Albemarle County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I invesigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geolgic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Johns Creek Number 3 (Inventory Number VA-04503), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report

Download National Dam Safety Program. Johns Creek Number 3 (Inventory Number VA-04503), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Johns Creek Number 3 (Inventory Number VA-04503), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Johns Creek Number 3 (Inventory Number VA-04503), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. Phase I reports include project information, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Aviation, Golf and Farm Club Dam. (Inventory Number VA 01703), James River Basin, Bath County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Aviation, Golf and Farm Club Dam. (Inventory Number VA 01703), James River Basin, Bath County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Aviation, Golf and Farm Club Dam. (Inventory Number VA 01703), James River Basin, Bath County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Aviation, Golf and Farm Club Dam. (Inventory Number VA 01703), James River Basin, Bath County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the Recommended Guidelines for Safety Inspection of Dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. (Author).