National Dam Safety Program. Spring Lake Dam (Inventory Number VA 18703), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Spring Lake Dam (Inventory Number VA 18703), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Spring Lake Dam (Inventory Number VA 18703), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Spring Lake Dam (Inventory Number VA 18703), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 174 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 174 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lake Front Royal Dam (Inventory Number VA 18705), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Front Royal Dam (Inventory Number VA 18705), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Front Royal Dam (Inventory Number VA 18705), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Lake Front Royal Dam (Inventory Number VA 18705), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 15 percent of the Probable Maximum Flood (PMF) or 30 percent of the SDF without overtopping the dam. During the SDF, the dam will be overtopped by a maximum of .4 ft for a period of 4 hours at a maximum velocity of 2.7 fps. Flows overtopping the dam during the SDF are not considered detrimental to the embankment with respect to erosion. The spillway is judged inadequate, but not seriously inadequate. The visual inspection revealed no apparent problems, however, two saturated areas encountered on the downstream embankment slope above the toe are concern. An evaluation of the stability condition could not be made since there is insufficient design and construction data for this structure.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1212 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1982 with total page 1212 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 77 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Upper South Lake Dam (Inventory Number VA-05913), Potomac River Basin, Tributary to Snakeden Branch, Fairfax County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 77 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 856 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1982 with total page 856 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1016 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1982 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Newman Lake Dam (Inventory Number VA 66001), Potomac River Basin, Harrisonburg, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Newman Lake Dam (Inventory Number VA 66001), Potomac River Basin, Harrisonburg, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 75 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Newman Lake Dam (Inventory Number VA 66001), Potomac River Basin, Harrisonburg, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Newman Lake Dam (Inventory Number VA 66001), Potomac River Basin, Harrisonburg, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the Recommended Guidelines for Safety Inspection of Dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. (Author).

National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 45 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Lake Arrowhead Dam (Inventory Number VA 17908), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Arrowhead Dam (Inventory Number VA 17908), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 48 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Arrowhead Dam (Inventory Number VA 17908), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Lake Arrowhead Dam (Inventory Number VA 17908), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1980 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. (Author).

National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1979 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including remedial measures.

National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Warrenton Dam (Inventory Number VA 06101), Potomac River Basin, Fauquier County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Warrenton Dam is comprised of a 550 foot long concrete slab and buttress dam and two earthen dikes separated by a grassy knoll. The dikes are in the reservoir located in a low lying area north of the dam. One dike is about 300 feet long and 13 feet high. The other dike, perpendicular to the first, is about 175 feet long and 6 feet high. A concrete intake structure comprised of three 8-inch intakes at different elevations allows flow to discharge into the stream below the dam, furnishing water to the Warrenton Filtration Plant about 2 miles downstream. The concrete intake structure also has a 24-inch inlet and a 24-inch outlet. The maximum height is 30.8 feet for the concrete spillway. The dam is located 0.5 miles north of the Warrenton town limits and is used as the water supply for Warrenton, Virginia. The dam is owned and maintained by the Town of Warrenton, Virginia. The dam is classified as a small dam with a significant hazard classification. Based on criteria established by the Department of the Army Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 100 year flood. Since the spillway was sized for the 21 percent PMF, which is greater than the 100 year flood, the spillway is adjudged as adequate.

National Dam Safety Program. Precision Dynamics Lake Dam (Inventory Number VA 10711), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Precision Dynamics Lake Dam (Inventory Number VA 10711), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Precision Dynamics Lake Dam (Inventory Number VA 10711), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Precision Dynamics Lake Dam (Inventory Number VA 10711), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I Inspection is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspection. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures. (Author).

National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report

Download National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 67 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Wheatlands Dam (Inventory Number VA 06913), Potomac River Basin, Frederick County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Wheatlands Dam (Inventory Number VA 06913), Potomac River Basin, Frederick County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 105 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Wheatlands Dam (Inventory Number VA 06913), Potomac River Basin, Frederick County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Wheatlands Dam (Inventory Number VA 06913), Potomac River Basin, Frederick County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 105 pages. Available in PDF, EPUB and Kindle. Book excerpt: Wheatlands Dam is an earthfill structure approximately 680 feet long and 71 feet high. The dam is owned by Mr. J.L. Bowman and F.L. Glaize of Stevens City, Virginia. The dam is classified as an intermediate size dam with a significant hazard classification. The principal spillway is a 72-inch corrugated metal pipe (CMP) serving as a drop-inlet that passes into a 60-inch CMP that passes through the dam at low level. The emergency spillway is an open channel earthen cut left of the left abutment. The reservoir was designed to provide recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the PMF. The spillways will pass 100 percent of the PMF or 100 percent of the SDF without overtopping the crest of the dam with normal pool established at the present condition. The spillways are adjudged as adequate. In 1978, the 72-inch CMP drop-inlet was damaged during an ice thaw draining the lake to its present lake level. A portion of the upstream slope eroded as part of that failure. The visual inspection revealed no problems that required immediate remedial measures. However, a professional engineering consultant should be retained to inspect the 60-inch CMP spillway.

National Dam Safety Program. Potomac Creek Number 1 Dam (Inventory Number VA 17902), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Potomac Creek Number 1 Dam (Inventory Number VA 17902), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 88 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac Creek Number 1 Dam (Inventory Number VA 17902), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Potomac Creek Number 1 Dam (Inventory Number VA 17902), Potomac River Basin, Stafford County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 88 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Sleeter Lake Dam (Inventory Number 10710), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Sleeter Lake Dam (Inventory Number 10710), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 55 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Sleeter Lake Dam (Inventory Number 10710), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Sleeter Lake Dam (Inventory Number 10710), Potomac River Basin, Loudoun County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I Inspection is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspection. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.