National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 49 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Elon Water Works Dam (Inventory Number VA 00908), James River Basin. Amherst County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Elon Water Works Dam is a zoned earth fill dam approximately 52.1 feet high and 490 feet long. The dam is classified as an intermediate size dam with a significant hazard classification. The emergency spillway is an earthen channel with a trapezoidal cross section at the left abutment. The principal spillway is a concrete drop-inlet with a fixed crest elevation of 663 feet. The reservoir is used for water supply. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass 32 percent of the PMF or 64 percent of the SDF without overtopping the dam. The SDF will overtop the dam by a maximum of 1.2 feet, reach an average critical velocity of 5.1 feet per second and flow over the dam for 2.4 hours. The emergency spillway is adjudged inadequate, but not seriously inadequate.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 180 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 180 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1008 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1982 with total page 1008 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 66 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report by :

Download or read book National Dam Safety Program. Pedlar River Dam (Inventory Number VA 00905), James River Basin, Amherst County, Virginia. Phase I Inspection Report written by and published by . This book was released on 1980 with total page 66 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1620 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1982 with total page 1620 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 102 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Buffalo River Dam Number 2 (Inventory Number VA 00912), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 102 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general condition of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations testing, and detailed computational evaluations are beyond the scope of a Phase I investigation. In reviewing this report, it should be realized that the reported condition of the dam is based on observations of field conditions at the time of inspection along with data available to the inspection team. In cases where the reservoir was lowered or drained prior to inspection, such action, while improving the stability and safety of the dam, removes the normal load on the structure and may obscure certain conditions which might otherwise be detectable if inspected under the normal operating environment of the structure. It is important to note that the condition of a dam depends on numerous and constantly changing internal and external conditions, and is evolutionary in nature.

National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Buffalo River Number 3 (Inventory Number VA 00911), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: Buffalo River No. 3 is a zoned, earthfill dam approximately 500 feet long and 60 feet high. The dam, located on Stonehouse Creek approximately 7 miles northwest of Amherst, Virgina, is used for flood control. Visual inspection and office analysis indicate no deficiencies requiring emergency attention. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the Probable Maximum Flood (PMF) was selected as the spillway design flood (SDF). The Soil Conservation Service (SCS) freeboard hydrograph (which establishes top of dam) is essentially equal to the PMF hydrograph. The spillways will essentially pass the PMF without overtopping the dam, and are therefore considered adequate. The dam and appurtenant structures were found to be in generally good condition. No conditions indicating embankment instability were detected during the field inspection and office analyses.

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1016 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1982 with total page 1016 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report

Download National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Coleman Falls Dam (VA-00903), Upper James River Basin, Amherst County, Virginia, Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : michael Baker (III.)

Download or read book National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by michael Baker (III.) and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam is an earthfill structure about 738 feet long and 40.5 feet high. The dam is classified as 'intermediate' on the basis of size, and given a hazard classification of 'significant' on the basis of downstream area development. The principal spillway consists of an octagonally shaped concrete riser with eight rectangular openings serving as drop inlets. The emergency spillway is an open concrete channel cut at the right abutment. The spillway will pass 41 percent of the PMF or 82 percent of the SDF without overtopping the crest of the dam. The spillway is adjudged inadequate but not seriously inadequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures.

National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 41 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill structure about 800 feet long and 45.2 feet high. The dam is classified as an intermediate size dam with a significant hazard classification. The designed principal spillway is a 10-inch steel drop-inlet stand pipe located in the reservoir. Because of underlying cavernous limestone beneath the reservoir, the water level is considerably below the normal design pool. There are two emergency spillways. The left emergency spillway is an open channel spillway which is a low point in natural ground. The right emergency spillway is an open channel cut into natural ground. The spillways will pass the PMF without overtopping; therefore, the spillways are adjudged as adequate. The visual inspection revealed no apparent problems or remedial measures in need of immediate attention.

National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report

Download National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The College Lake Dam is an earthern embankment about 300 feet long and 35.4 feet high. The dam is owned and maintained by the City of Lynchburg. The dam is classified as an intermediate size structure with a high hazard classification. The spillway is a deteriorated masonry weir across a rock cut located in the right abutment. This reservoir is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the Probable Maximum Flood (PMF). The spillways will pass 10 percent of the PMF without overtopping the dam. Therefore the spillway is adjudged as inadequate but not seriously inadequate. The visual inspection revealed no problems or remedial measures in need of immediate attention. There is no regular maintenance operation program or warning system, and it is recommended that a maintenance program and a warning system be established. The maintenance items listed should be accomplished as a part of the regular maintenance program within the next 12 months.