Author : Raymond Baksi
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (911 download)
Book Synopsis Updating Selected Digital Information Related to the Mackenzie Gas Project by : Raymond Baksi
Download or read book Updating Selected Digital Information Related to the Mackenzie Gas Project written by Raymond Baksi and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The background and history of the various proposals since its inception in the early 1970's for a Mackenzie Valley gas pipeline in the Northwest Territories have been well documented. Within the most recent push of the last few years to get approval and construction started, the Proponent (Including the Producer and Aboriginal Pipeline Groups) have expressed a desire to have a pipeline in place and operating by 2010. As with many ongoing projects in the logistics and planning stages many changes have been made to streamline, simplified, and improve the overall venture. It is these changes and new release of data that was analysed for content relating to requirements of granular resources in terms of when and where, the quantity and quality, and the granular deposits projected to provide these resources. The following data, image manipulation, and data analysis was conducted using a Geographical Information System (GIS) called Manifold GIS Universal Edition 6.5. Preliminary Engineering Alignment Sheets dated February 1, 2005 reveal terrain units along the pipeline right-of-way. The 23 images containing this information were georegistered using a combination of matchline coordinates in degree-minute-second format and visual identification using images from the Mackenzie Gathering System COGOA Volume 4, given in UTM coordinates. The COGOA Volume 4 maps were georeferenced in the report titled ?Summary of Granular Resource Requirements and Availability for the Mackenzie Valley Gas Pipeline Corridor? March 2005 by Raymond Baksi. With the help of the Canadian Spatial Reference System GSRUG's online computation, the degree-minute-second coordinates were converted to UTM coordinates and the Algorithmic method 'Affine' (Scale, shift, rotate) in Manifold was applied to georegister the images. Terrain units depicting sand and gravel within a corridor around the gathering pipelines were digitized into area polygons. One-hundred-seventy-eight (178) in total were identified and logged, 73 of those were unique values. Pits, roads, and water sources were extracted from 1:50000 scale images of the route, georeferenced and provided by Ward Kilby at Cal Data Ltd. There were 126 distinct pits identified, 143 water sources, and 340 road or road segments connecting the pits, water sources, and the pipeline route. Land and water project permit applications for each of the four (4) land claim settlement areas; Gwich'in, Inuvialuit, Sahtu, and Deh Cho Regions were reviewed for mention of borrow materials. A hyperlink document tree was created for each of these applications to guide those interested in borrow material directly to those sections. ... The borrow sites identified in the Environmental Impact Statement Volume 2 Project Description from August 2004 were compared with that of the newly released February 2006 update Mackenzie Gas Project EIS Additional Information for the Joint Review Panel Environmental Inputs and Outputs. This report also estimates the total increase in volume of required granular material at 1.6 million cubic meters (Mm3) for a total of 6.5 Mm3. There were a total of 14 borrow sites added and 22 removed from the official list of granular resources sites. This results in a total of eight (8) less granular sites under consideration for use. Additionally, some borrow sites initially considered primary sites have moved to become secondary sites and some secondary sites moved to primary consideration. This ongoing project has seen many changes over the life of the proposal. As the proponent group moves ever closer to construction, the finer details of the project will be negotiated and finalized. As these decisions are made they should be incorporated into the knowledge base being built by DIAND. It can be reasonably expected that even after construction has commenced there will be further modifications. The Department of Indian Affairs and Northern Development in context of granular resources will likely want to stay abreast o f the issues to continue its efforts in granular management. -- ASTIS (online) database.