River Protection Project System Plan

Download River Protection Project System Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (893 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project System Plan by :

Download or read book River Protection Project System Plan written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

River Protection Project (RPP) System Plan

Download River Protection Project (RPP) System Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 159 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project (RPP) System Plan by :

Download or read book River Protection Project (RPP) System Plan written by and published by . This book was released on 2003 with total page 159 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Department of Energy, Office of River Protection (ORP) is responsible for the retrieval, treatment, and disposal of the radioactive wastes contained in the Hanford Site waste tanks, and closure of all the tanks and associated facilities. Currently, the ORP is committed to completing the treatment of all the tank wastes by 2028, and closure of all facilities by 2034. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Removing pumpable liquids remaining in single-shell tanks (SSTs) to the extent practical (will be completed in 2004); (2) Retrieving wastes remaining in SSTs to double-shell tanks (DSTs) for staging to the Waste Treatment and Immobilization Plant (WTP), or directly to transuranic (TRU) packaging or supplemental treatment; (3) Aggressively managing DST space so that the retrieval and closure of SSTs can be accelerated to maximize overall risk reduction; (4) Constructing and operating the WTP which will pretreat and immobilize the most hazardous wastes contained in tank farms, and maximizing its capability and capacity; (5) Deploying packaging capabilities for tank waste that is TRU for shipment and disposal in the Waste Isolation Pilot Plant (WIPP); (6) Developing and deploying supplemental treatment capacity that can safely treat and immobilize a significant fraction of the low-activity waste (LAW) contained in tank farms; (7) Disposing of immobilized low-activity waste (ILAW) in an integrated facility on site; and (8) Closing SST and DST tank farms, ancillary facilities, and all waste management and treatment facilities. The ORP has established contracts to implement this strategy to accelerate overall risk reduction and establish a basic capability to complete the overall mission. Major decisions regarding the supplemental treatment technology, the ultimate needed capacity, and its relationship to the WTP have not yet been made. A major programmatic decision point has been established in 2005 that will determine the ultimate deployment strategy for supplemental treatment versus additional capacity added to the WTP. This System Plan investigates the impacts of potential innovations associated with the WTP ILAW facility; and alternative configurations of supplemental treatment.

River Protection Project (RPP) Project Management Plan

Download River Protection Project (RPP) Project Management Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 95 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project (RPP) Project Management Plan by :

Download or read book River Protection Project (RPP) Project Management Plan written by and published by . This book was released on 2001 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

River Protection Project (RPP) Project Management Plan

Download River Protection Project (RPP) Project Management Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 95 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project (RPP) Project Management Plan by :

Download or read book River Protection Project (RPP) Project Management Plan written by and published by . This book was released on 2001 with total page 95 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

River Protection Project (RPP) Environmental Program Plan

Download River Protection Project (RPP) Environmental Program Plan PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 52 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project (RPP) Environmental Program Plan by :

Download or read book River Protection Project (RPP) Environmental Program Plan written by and published by . This book was released on 2000 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

Rapport au gouvernement de la Republique Malgache

Download Rapport au gouvernement de la Republique Malgache PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 482 pages
Book Rating : 4.:/5 (431 download)

DOWNLOAD NOW!


Book Synopsis Rapport au gouvernement de la Republique Malgache by :

Download or read book Rapport au gouvernement de la Republique Malgache written by and published by . This book was released on 1975 with total page 482 pages. Available in PDF, EPUB and Kindle. Book excerpt:

River Protection Project FY 2000 Multi Year Work Plan Summary

Download River Protection Project FY 2000 Multi Year Work Plan Summary PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 235 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project FY 2000 Multi Year Work Plan Summary by :

Download or read book River Protection Project FY 2000 Multi Year Work Plan Summary written by and published by . This book was released on 1999 with total page 235 pages. Available in PDF, EPUB and Kindle. Book excerpt: The River Protection Project (RPP), formerly the Tank Waste Remediation System (TWRS), is a major part of the U.S. Department of Energy's (DOE) Office of River Protection (ORP). The ORP was established as directed by Congress in Section 3139 of the Strom Thurmond National Defense Authorization Act for Fiscal Year (FY) 1999. The ORP was established to elevate the reporting and accountability for the RPP to the DOE-Headquarters level. This was done to gain Congressional visibility and obtain support for a major $10 billion high-level liquid waste vitrification effort.

Nuclear Waste

Download Nuclear Waste PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437923488
Total Pages : 57 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Nuclear Waste by : Gene Aloise

Download or read book Nuclear Waste written by Gene Aloise and published by DIANE Publishing. This book was released on 2010 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: At its Hanford Site in Washington State, the Dept. of Energy (DoE) is responsible for one of the world¿s biggest cleanup projects: the treatment and disposal of about 56 million gallons of radioactive and hazardous waste, stored in 177 underground tanks. Two decades and several halted efforts later, none of this waste has yet been treated, cleanup costs have grown steadily, and prospective cleanup time frames have lengthened. This report assesses: (1) DoE¿s current tank waste cleanup strategy and key technical, legal, and other uncertainties; (2) the extent to which DoE has analyzed whether this strategy is commensurate with risks from the wastes; and (3) opportunities to reduce tank waste cleanup costs. Includes recommend. Charts and tables.

Remediation of Legacy Hazardous and Nuclear Industrial Sites

Download Remediation of Legacy Hazardous and Nuclear Industrial Sites PDF Online Free

Author :
Publisher : CRC Press
ISBN 13 : 1040114849
Total Pages : 281 pages
Book Rating : 4.0/5 (41 download)

DOWNLOAD NOW!


Book Synopsis Remediation of Legacy Hazardous and Nuclear Industrial Sites by : Stuart T. Arm

Download or read book Remediation of Legacy Hazardous and Nuclear Industrial Sites written by Stuart T. Arm and published by CRC Press. This book was released on 2024-09-12 with total page 281 pages. Available in PDF, EPUB and Kindle. Book excerpt: Remediation of Legacy Hazardous and Nuclear Industrial Sites provides an overview of the key elements involved in remediating complex waste sites using the Hanford nuclear site as a case study. Hanford is one of the most complex waste sites in the world and has examples of most, if not all, characteristics of the complex waste sites that exist globally. This book is aimed at a non-technical audience and describes the stages of remediation based on general RCRA/CERCLA processes, from establishing a strategy that includes all stakeholders to site assessment, waste treatment and disposal, and long-term monitoring. Features: Informs a non-technical audience of the important elements involved in complex waste site remediation Employs the Hanford Site as a case study throughout to explain real-world applications of remediation steps Connects the “human” element to the technical aspects through interviews with key current and retired individuals at the Hanford Site Includes discussion of stakeholders and the engagement process in remediation Demonstrates how all elements of complex waste site remediation from demolition of buildings to groundwater management are interrelated Focuses on broader technical and sociopolitical challenges for remediation of a contaminated site Aimed at a broad audience, this book offers approachable guidance to technical and non-technical readers through a series of real-world examples that cover each important step in the complex waste cleanup process.

Review of the Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Download Review of the Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation PDF Online Free

Author :
Publisher : National Academies Press
ISBN 13 : 0309475155
Total Pages : 55 pages
Book Rating : 4.3/5 (94 download)

DOWNLOAD NOW!


Book Synopsis Review of the Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation by : National Academies of Sciences, Engineering, and Medicine

Download or read book Review of the Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation written by National Academies of Sciences, Engineering, and Medicine and published by National Academies Press. This book was released on 2018-06-08 with total page 55 pages. Available in PDF, EPUB and Kindle. Book excerpt: In 1943, as part of the Manhattan Project, the Hanford Nuclear Reservation was established with the mission to produce plutonium for nuclear weapons. During 45 years of operations, the Hanford Site produced about 67 metric tonnes of plutoniumâ€"approximately two-thirds of the nation's stockpile. Production processes generated radioactive and other hazardous wastes and resulted in airborne, surface, subsurface, and groundwater contamination. Presently, 177 underground tanks contain collectively about 210 million liters (about 56 million gallons) of waste. The chemically complex and diverse waste is difficult to manage and dispose of safely. Section 3134 of the National Defense Authorization Act for Fiscal Year 2017 calls for a Federally Funded Research and Development Center (FFRDC) to conduct an analysis of approaches for treating the portion of low-activity waste (LAW) at the Hanford Nuclear Reservation intended for supplemental treatment. The first of four, this report reviews the analysis carried out by the FFRDC. It evaluates the technical quality and completeness of the methods used to conduct the risk, cost benefit, schedule, and regulatory compliance assessments and their implementations; waste conditioning and supplemental treatment approaches considered in the assessments; and other key information and data used in the assessments.

Sacramento River Bank Protection Project, California, First Phase

Download Sacramento River Bank Protection Project, California, First Phase PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 156 pages
Book Rating : 4.3/5 (121 download)

DOWNLOAD NOW!


Book Synopsis Sacramento River Bank Protection Project, California, First Phase by : United States. Army. Corps of Engineers

Download or read book Sacramento River Bank Protection Project, California, First Phase written by United States. Army. Corps of Engineers and published by . This book was released on 1979 with total page 156 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Water Resources Development by the U.S. Army Corps of Engineers in Indiana

Download Water Resources Development by the U.S. Army Corps of Engineers in Indiana PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (31 download)

DOWNLOAD NOW!


Book Synopsis Water Resources Development by the U.S. Army Corps of Engineers in Indiana by :

Download or read book Water Resources Development by the U.S. Army Corps of Engineers in Indiana written by and published by . This book was released on 1971 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:

River Protection Project Integrated Safety Management System Phase II Verification Report, Volumes I and II - 8

Download River Protection Project Integrated Safety Management System Phase II Verification Report, Volumes I and II - 8 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 197 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis River Protection Project Integrated Safety Management System Phase II Verification Report, Volumes I and II - 8 by :

Download or read book River Protection Project Integrated Safety Management System Phase II Verification Report, Volumes I and II - 8 written by and published by . This book was released on 1999 with total page 197 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Department of Energy policy (DOE P 450.4) is that safety is integrated into all aspects of the management and operations of its facilities. In simple and straightforward terms, the Department will ''Do work safely.'' The purpose of this River Protection Project (RPP) Integrated Safety Management System (ISMS) Phase II Verification was to determine whether ISMS programs and processes are implemented within RFP to accomplish the goal of ''Do work safely.'' The goal of an implemented ISMS is to have a single integrated system that includes Environment, Safety, and Health (ES & H) requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and federal property over the RPP life cycle. The ISMS is comprised of the (1) described functions, components, processes, and interfaces (system map or blueprint) and (2) personnel who are executing those assigned roles and responsibilities to manage and control the ISMS. Therefore, this review evaluated both the ''paper'' and ''people'' aspects of the ISMS to ensure that the system is implemented within RPP. Richland Operations Office (RL) conducted an ISMS Phase I Verification of the TWRS from September 28-October 9, 1998. The resulting verification report recommended that TWRS-RL and the contractor proceed with Phase II of ISMS verification given that the concerns identified from the Phase I verification review are incorporated into the Phase II implementation plan.

Sacramento River Bank Projection Project, Implementation of Streambank Protection, Sacramento County

Download Sacramento River Bank Projection Project, Implementation of Streambank Protection, Sacramento County PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 604 pages
Book Rating : 4.3/5 (555 download)

DOWNLOAD NOW!


Book Synopsis Sacramento River Bank Projection Project, Implementation of Streambank Protection, Sacramento County by :

Download or read book Sacramento River Bank Projection Project, Implementation of Streambank Protection, Sacramento County written by and published by . This book was released on 1998 with total page 604 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Download Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation PDF Online Free

Author :
Publisher : National Academies Press
ISBN 13 : 0309495210
Total Pages : 81 pages
Book Rating : 4.3/5 (94 download)

DOWNLOAD NOW!


Book Synopsis Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation by : National Academies of Sciences, Engineering, and Medicine

Download or read book Review of the Final Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation written by National Academies of Sciences, Engineering, and Medicine and published by National Academies Press. This book was released on 2019-09-15 with total page 81 pages. Available in PDF, EPUB and Kindle. Book excerpt: In 1943, as part of the Manhattan Project, the Hanford Nuclear Reservation was established with the mission to produce plutonium for nuclear weapons. During 45 years of operations, the Hanford Site produced about 67 metric tonnes of plutoniumâ€"approximately two-thirds of the nation's stockpile. Production processes generated radioactive and other hazardous wastes and resulted in airborne, surface, subsurface, and groundwater contamination. Presently, 177 underground tanks contain collectively about 210 million liters (about 56 million gallons) of waste. The chemically complex and diverse waste is difficult to manage and dispose of safely. Section 3134 of the National Defense Authorization Act for Fiscal Year 2017 calls for a Federally Funded Research and Development Center (FFRDC) to conduct an analysis of approaches for treating the portion of low-activity waste at the Hanford Nuclear Reservation intended for supplemental treatment. The third of four, this report provides an overall assessment of the FFRDC team's final draft report, dated April 5, 2019.

Final Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Download Final Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation PDF Online Free

Author :
Publisher : National Academies Press
ISBN 13 : 0309672910
Total Pages : 131 pages
Book Rating : 4.3/5 (96 download)

DOWNLOAD NOW!


Book Synopsis Final Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation by : National Academies of Sciences, Engineering, and Medicine

Download or read book Final Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation written by National Academies of Sciences, Engineering, and Medicine and published by National Academies Press. This book was released on 2020-03-30 with total page 131 pages. Available in PDF, EPUB and Kindle. Book excerpt: The U.S. Department of Energy's Office of Environmental Management is responsible for managing and cleaning up the waste and contamination at the Hanford Nuclear Reservation, the nation's biggest and most complex nuclear cleanup challenge. At the site, 177 underground tanks collectively contain about 211 million liters of waste that includes high-activity and low-activity materials. At the request of Congress, Final Review of the Study on Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation: Review #4 focuses on approaches for treatment and disposal of the supplemental portion of the low-activity waste from the tanks. This review report discusses developments since the publication of Review #3 and provides a summary of public comments on the third committee review report. The authoring committee then shares their views on these comments and whether they change any of the findings or recommendations in the third review report.

Review of the Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation

Download Review of the Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation PDF Online Free

Author :
Publisher : National Academies Press
ISBN 13 : 0309483549
Total Pages : 75 pages
Book Rating : 4.3/5 (94 download)

DOWNLOAD NOW!


Book Synopsis Review of the Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation by : National Academies of Sciences, Engineering, and Medicine

Download or read book Review of the Draft Analysis of Supplemental Treatment Approaches of Low-Activity Waste at the Hanford Nuclear Reservation written by National Academies of Sciences, Engineering, and Medicine and published by National Academies Press. This book was released on 2018-11-02 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: In 1943, as part of the Manhattan Project, the Hanford Nuclear Reservation was established with the mission to produce plutonium for nuclear weapons. During 45 years of operations, the Hanford Site produced about 67 metric tonnes of plutoniumâ€"approximately two-thirds of the nation's stockpile. Production processes generated radioactive and other hazardous wastes and resulted in airborne, surface, subsurface, and groundwater contamination. Presently, 177 underground tanks contain collectively about 210 million liters (about 56 million gallons) of waste. The chemically complex and diverse waste is difficult to manage and dispose of safely. Section 3134 of the National Defense Authorization Act for Fiscal Year 2017 calls for a Federally Funded Research and Development Center (FFRDC) to conduct an analysis of approaches for treating the portion of low-activity waste (LAW) at the Hanford Nuclear Reservation intended for supplemental treatment. The second of four, this report reviews the results of the assessments, including the formulation and presentation of conclusions and the characterization and treatment of uncertainties.