New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab

Download New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 14002 pages
Book Rating : 4.:/5 (727 download)

DOWNLOAD NOW!


Book Synopsis New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab by :

Download or read book New RF Control System for the 12 GeV Energy Upgrade of the CEBAF Accelerator at Jefferson Lab written by and published by . This book was released on 2008 with total page 14002 pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF Accelerator at Jefferson Lab presently consists of 50 MeV injector, two anti-parallel superconducting linacs and two arcs for transporting beam between the linacs. By the mid-1990s, the accelerator was providing electrons up to 5.75 GeV. The 12 GeV Upgrade is a major accelerator project aimed at doubling the energy by adding 10 (five per linac) new high gradient cryomodules, each providing 100 MV of field. The new cryomodule will consist of eight 7-cell superconducting cavities operating at an average accelerating gradient of 19.5 MV/m and with an external Q=3.2 x 10^7. The high gradient, very high quality factor and large Lorentz detuning coefficient (KL up to 4) pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new digital LLRF control system has been developed. The main highlights of the new RF Control system include: a RF front-end with low temperature drift and good linearity, a large FPGA.

สมัยก่อนประวัติศาสตร์ในประเทศไทย

Download สมัยก่อนประวัติศาสตร์ในประเทศไทย PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (773 download)

DOWNLOAD NOW!


Book Synopsis สมัยก่อนประวัติศาสตร์ในประเทศไทย by :

Download or read book สมัยก่อนประวัติศาสตร์ในประเทศไทย written by and published by . This book was released on 1986 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

High Gradient Operation with the CEBAF Upgrade RF Control System

Download High Gradient Operation with the CEBAF Upgrade RF Control System PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis High Gradient Operation with the CEBAF Upgrade RF Control System by : G. Davis

Download or read book High Gradient Operation with the CEBAF Upgrade RF Control System written by G. Davis and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF Accelerator at Jefferson Lab is presently a 6 GeV five pass electron accelerator consisting of two superconducting linacs joined by independent magnetic transport arcs. Energy will be upgraded to 12 GeV with the addition of 10 new high gradient cryomodules (17+ MV/m). The higher gradients pose significant challenges beyond what the present analog low level RF (LLRF) control systems can handle reliably; therefore, a new LLRF control system is needed. A prototype system has been developed incorporating a large FPGA and using digital down and up conversion to minimize the need for analog components. The new system is more flexible and less susceptible to drifts and component nonlinearities. Because resonance control is critical to reach high gradients quickly, the new cryomodules will include a piezoelectric tuner for each cavity, and the LLRF controls must incorporate both feedback and feed-forward methods to achieve optimal resonance control performance. This paper discusses development of the new RF system, system performance for phase and amplitude stability and resonance control under Lorentz detuning measured during recent tests on a prototype cryomodule.

Upgrading the CEBAF Accelerator to 12 GeV.

Download Upgrading the CEBAF Accelerator to 12 GeV. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Upgrading the CEBAF Accelerator to 12 GeV. by : Leigh Harwood

Download or read book Upgrading the CEBAF Accelerator to 12 GeV. written by Leigh Harwood and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Jefferson Lab is preparing to upgrade its 6 GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12 GeV. The doubled energy will significantly extend research reach of the three existing experimental Halls A, B and C, and the upgrade will add scientific capability, with a newly constructed hall, Hall D. Areas of special initial interest are reactions at high xBjorken, GPD's and exotic hybrid mesons. The present linacs will have their acceleration roughly doubled through the addition of 10 new cryomodules which will perform at {approx}5 times the original specification for CEBAF. The cryogenics plant will be roughly doubled and new rf systems will be installed for the new cryomodules. The beam transport system will strongly leverage existing hardware but must be enhanced with new power supplies, one new recirculation arc, and a beamline to the new Hall D.A brief description of the scope for the various accelerator subsystems will be given as well as the status of the project as a whole.

Overview of CEBAF Operations and SRF-related Activities at Jefferson Lab

Download Overview of CEBAF Operations and SRF-related Activities at Jefferson Lab PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Overview of CEBAF Operations and SRF-related Activities at Jefferson Lab by :

Download or read book Overview of CEBAF Operations and SRF-related Activities at Jefferson Lab written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Jefferson Lab nuclear physics accelerator, CEBAF, continues to reliably deliver polarized CW electron beams with energy in the range of 1--5.5 GeV. The 330 installed 1,500 MHz SRF cavity systems perform solidly, contributing a small fraction of the machine downtime. The 5-pass energy capability has been pushed to near 6 GeV by application of in situ helium processing to almost all of the cavities. New operational tools have been developed and deployed which allow the operators to quickly reconfigure the linacs for optimal performance under various energy and beamloading conditions. Plans are being developed for upgrading CEBAF to 12 GeV. This requires a new cryomodule design and use of 5.5 recirculations for the top energy. Subsystem development is underway on a 7-cell cavity, new zero-backlash tuner, improved magnetic shielding, and an arc-free waveguide rf feed, as well as a new cryomodule mechanical system. Significant facility changes have been made in preparation for this work. A new rf control system will also be required. In addition to the successful nuclear physics program, the JLab FEL produced a world-record 1.7 kW CW in the infrared. An upgrade program is ready to begin. Significant efforts have also been directed in support of APT and RIA, as well as collaborations related to cavity fabrication and processing techniques.

Injection Options for 12 GeV CEBAF Upgrade

Download Injection Options for 12 GeV CEBAF Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis Injection Options for 12 GeV CEBAF Upgrade by :

Download or read book Injection Options for 12 GeV CEBAF Upgrade written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Jefferson Lab is planning a major upgrade of CEBAF accelerator from 6 to 12 GeV. The injection energy needs to be increased accordingly from 67 MeV to 123 MeV. While the present 100 keV electron gun and beam formation up to 5 MeV would remain unchanged, the accelerating SRF modules in the current injector cannot provide the desired energy increase. Two options for attaining the energy increase have been considered: (1) replacing the present injector SRF modules with new, higher gradient modules, or (2) re-circulating the electron beam through the existing cryomodules to achieve the necessary energy gain in two passes. In this paper we present computer simulation studies for these two options of the injector upgrade and list their advantages and disadvantages.

The Science Driving the 12 GeV Upgrade of CEBAF.

Download The Science Driving the 12 GeV Upgrade of CEBAF. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 271 pages
Book Rating : 4.:/5 (462 download)

DOWNLOAD NOW!


Book Synopsis The Science Driving the 12 GeV Upgrade of CEBAF. by : Thomas Jefferson National Accelerator Facility (U.S.)

Download or read book The Science Driving the 12 GeV Upgrade of CEBAF. written by Thomas Jefferson National Accelerator Facility (U.S.) and published by . This book was released on 2000 with total page 271 pages. Available in PDF, EPUB and Kindle. Book excerpt:

The CEBAF RF Separator System Upgrade

Download The CEBAF RF Separator System Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis The CEBAF RF Separator System Upgrade by :

Download or read book The CEBAF RF Separator System Upgrade written by and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF accelerator uses RF deflecting cavities operating at the third sub-harmonic (499 MHz) of the accelerating frequency (1497 MHz) to ''kick'' the electron beam to the experimental halls. The cavities operate in a TEM dipole mode incorporating mode enhancing rods to increase the cavity's transverse shunt impedance [1]. As the accelerators energy has increased from 4 GeV to 6 GeV the RF system, specifically the 1 kW solid-state amplifiers, have become problematic, operating in saturation because of the increased beam energy demands. Two years ago we began a study to look into replacement for the RF amplifiers and decided to use a commercial broadcast Inductive Output Tube (IOT) capable of 30 kW. The new RF system uses one IOT amplifier on multiple cavities as opposed to one amplifier per cavity as was originally used. In addition, the new RF system supports a proposed 12 GeV energy upgrade to CEBAF. We are currently halfway through the upgrade with three IOTs in operation and the remaining one nearly installed. This paper reports on the new RF system and the IOT performance.

Mythologie Grecque Varia

Download Mythologie Grecque Varia PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (421 download)

DOWNLOAD NOW!


Book Synopsis Mythologie Grecque Varia by :

Download or read book Mythologie Grecque Varia written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF.

Download The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (893 download)

DOWNLOAD NOW!


Book Synopsis The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF. by :

Download or read book The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF. written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This Conceptual Design Report (CDR) presents the compelling scientific case for upgrading the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab to 12 GeV. Such a facility will make profound contributions to the study of hadronic matter.

Upgrade of the CEBAF Acceleration System

Download Upgrade of the CEBAF Acceleration System PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Upgrade of the CEBAF Acceleration System by :

Download or read book Upgrade of the CEBAF Acceleration System written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Long-term plans for CEBAF at Jefferson Lab call for providing 12 GeV in the middle of the next decade and 24 GeV after 2010. Such energies can be achieved within the existing footprint by fully populating the accelerator tunnel with cryomodules capable of twice the operating voltage of the existing ones within the same length. In particular, this requires the development of superconducting cavities capable of operating at gradients above 12 MV/m and Q(approximately)101°. An R & D program for the development of the cryomodules is under way and will be presented, as well as various options for the upgrade path.

Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade

Download Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (873 download)

DOWNLOAD NOW!


Book Synopsis Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade by :

Download or read book Production and Testing Experience with the SRF Cavities for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2011 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF recirculating CW electron linear accelerator at Jefferson Lab is presently undergoing a major upgrade to 12 GeV. This project includes the fabrication, preparation, and testing of 80 new 7-cell SRF cavities, followed by their incorporation into ten new cryomodules for subsequent testing and installation. In order to maximize the cavity Q over the full operable dynamic range in CEBAF (as high as 25 MV/m), the decision was taken to apply a streamlined preparation process that includes a final light temperature-controlled electropolish of the rf surface over the vendor-provided bulk BCP etch. Cavity processing work began at JLab in September 2010 and will continue through December 2011. The excellent performance results are exceeding project requirements and indicate a fabrication and preparation process that is stable and well controlled. The cavity production and performance experience to date will be summarized and lessons learned reported to the community.

Advances in Cryogenic Engineering

Download Advances in Cryogenic Engineering PDF Online Free

Author :
Publisher : Springer Science & Business Media
ISBN 13 : 9780306464430
Total Pages : 984 pages
Book Rating : 4.4/5 (644 download)

DOWNLOAD NOW!


Book Synopsis Advances in Cryogenic Engineering by : Quan-Sheng Shu

Download or read book Advances in Cryogenic Engineering written by Quan-Sheng Shu and published by Springer Science & Business Media. This book was released on 2000-10-31 with total page 984 pages. Available in PDF, EPUB and Kindle. Book excerpt: In recent years, the technology of cryogenic comminution has been widely applied in the field of chemical engineering, food making, medicine production, and particularly in recycling of waste materials. Because of the increasing pollution of waste tires and the shortage of raw rubber resource, the recycling process for waste rubber products has become important and commercially viable. This technology has shown a great number of advantages such as causing no environmental pollution, requiring low energy consumption and producing high quality products. Hence, the normal crusher which was used to reclaim materials, such as waste tires, nylon, plastic and many polymer materials at atmospheric 12 temperature is being replaced by a cryogenic crusher. • In the cryogenic crusher, the property of the milled material is usually very sensitive to temperature change. When a crusher is in operation, it will generate a great deal of heat that causes the material temperature increased. Once the temperature increases over the vitrification temperature, the material property will change and lose the brittle behavior causing the energy consumption to rise sharply. Consequently, the comminution process cannot be continued. Therefore, it is believed that the cryogenic crusher is the most critical component in the cryogenic comminution system. The research on the temperature increase and energy consumption in the cryogenic crusher is not only to reduce the energy consumption of the crasher, but also to reduce the energy consumption of the cryogenic system.

UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY.

Download UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY. by :

Download or read book UPGRADING THE CEBAF INJECTOR WITH A NEW BOOSTER, HIGHER VOLTAGE GUN, AND HIGHER FINAL ENERGY. written by and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Continuous Electron Beam Accelerator Facility (CEBAF) accelerator at Jefferson Lab will be upgraded from 6 GeV to 12 GeV in the next few years. To meet the requirement of the new machine and to take the opportunity to improve the beam quality, the CEBAF injector will be upgraded with a higher voltage gun, a new booster, and a new accelerating RF module. The CEBAF injector creates and accelerates three beams at different currents simultaneously. The beams are interleaved, each at one third of the RF frequency, traveling through the same beam line. The higher voltage gun will lower the space charge effects. The new booster with optimized beam dynamics will complete the bunching process and provide initial acceleration matched to the new gun voltage. Using our latest SRF design, the new booster has significantly lower x/y coupling effects that should improve our beam setup and operation for the highly sensitive parity experiments scheduled for the CEBAF's future. Finally, the new accelerating RF module will roughly double the injector final energy to match the rest of the 12 GeV accelerator. In this paper we will provide more detail about this upgrade.

Operational Experience with the CEBAF Control System

Download Operational Experience with the CEBAF Control System PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 7 pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Operational Experience with the CEBAF Control System by :

Download or read book Operational Experience with the CEBAF Control System written by and published by . This book was released on 1996 with total page 7 pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF accelerator at Thomas Jefferson National Accelerator Facility (Jefferson Lab) successfully began its experimental nuclear physics program in November of 1995 and has since surpassed predicted machine availability. Part of this success can be attributed to using the EPICS (Experimental Physics and Industrial Control System) control system toolkit. The CEBAF control system is one of the largest accelerator control system now operating. It controls approximately 338 SRF cavities, 2,300 magnets, 500 beam position monitors and other accelerator devices, such as gun hardware and other beam monitoring devices. All told, the system must be able to access over 125,000 database records. The system has been well received by both operators and the hardware designers. The EPICS utilities have made the task of troubleshooting systems easier. The graphical and test-based creation tools have allowed operators to custom build control screens. In addition, the ability to integrate EPICS with other software packages, such as Tcl/Tk, has allowed physicists to quickly prototype high-level application programs, and to provide GUI front ends for command line driven tools. Specific examples of the control system applications are presented in the areas of energy and orbit control, cavity tuning and accelerator tune up diagnostics.

CEBAF Control Room Renovation

Download CEBAF Control Room Renovation PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (685 download)

DOWNLOAD NOW!


Book Synopsis CEBAF Control Room Renovation by :

Download or read book CEBAF Control Room Renovation written by and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Machine Control Center at Jefferson Lab's Continuous Electron Beam Accelerator Facility was initially constructed in the early 1990s and based on proven technology of that era. Through our experience over the last 15 years and in our planning for the facilities 12 GeV upgrade we reevaluated the control room environment to capitalize on emerging visualization and display technologies and improve on workflow processes and ergonomic attributes. This effort also sets the foundation for the redevelopment of the accelerator's control system to deliver high reliability performance with improvements in beam specifications management and information flow. The complete renovation was performed over a three-week period with no interruption to beam operations. We present the results of this effort.

The CEBAF Master Oscillator and Distribution Remodeling

Download The CEBAF Master Oscillator and Distribution Remodeling PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (873 download)

DOWNLOAD NOW!


Book Synopsis The CEBAF Master Oscillator and Distribution Remodeling by :

Download or read book The CEBAF Master Oscillator and Distribution Remodeling written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Jefferson Lab's CEBAF accelerator operation requires various frequency references to be distributed along the site. Three signals: 10 MHz, 70 MHz and 499 MHz are synthesized in the Machine Control Center (MCC) while 1427 MHz and 429 MHz are derived from 499 MHz and 70 MHz signals in four separate locations. We are replacing our obsolete 10 MHz, 70 MHz and 499 MHz sources with new sources that will incorporate a GPS receiver to discipline a 10 MHz reference. In addition the MO (Master Oscillator) system will be redundant (duplicate MO) and a third signal source will be used as a system diagnostic. Moreover, the 12 GeV Energy Upgrade for CEBAF accelerator will be adding 80 new RF systems. To support them the distribution of 1427 MHz and 70 MHz signals has to be extended and be able to deliver enough LO (Local Oscillator) and IF (Intermediate Frequency) power to 320 old and 80 new 80 RF systems. This paper discusses the new MO and the drive line extension.