Navy LPD-17 Amphibious Ship Procurement

Download Navy LPD-17 Amphibious Ship Procurement PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 143793885X
Total Pages : 51 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy LPD-17 Amphibious Ship Procurement by : Ronald O'Rourke

Download or read book Navy LPD-17 Amphibious Ship Procurement written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2011-05 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy¿s FY 2011-2015 shipbuilding plan calls for procuring an 11th and final San Antonio (LPD-17) class amphibious ship in FY 2012. The Navy estimates the procurement cost of this ship at $2 billion. The ship received $184 million in FY 2010 advance procurement funding, and the Navy plans to request the remaining $1.9 billion of the cost in the FY 2012 budget. Accordingly, the Navy¿s proposed FY 2011 budget does not request any procurement funding for the LPD-17 program. Contents of this report: (1) Intro.; (2) Amphibious Ships in General; LPD-17 Program; (3) Issues for Congress. Appendix A. Amphibious Lift Goal; Appendix B. LPD-17 Cost Growth and Construction Problems. Illus. This is a print on demand report.

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : DIANE Publishing
ISBN 13 : 1437919596
Total Pages : 43 pages
Book Rating : 4.4/5 (379 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by DIANE Publishing. This book was released on 2010-03 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Discusses the U.S. Navy¿s proposed FY 2010 budget requests funding for eight new Navy ships. This total includes two relatively expensive, high-capability combatant ships (a Virginia-class attack submarine and a DDG-51 class Aegis destroyer) and six relatively inexpensive ships (three Littoral Combat Ships [LCSs], two TAKE-1 auxiliary dry cargo ships, and one Joint High Speed Vessel [JHSV]). Concerns about the Navy¿s prospective ability to afford its long-range shipbuilding plan, combined with year-to-year changes in Navy shipbuilding plans and significant cost growth and other problems in building certain new Navy ships, have led to concerns about the status of Navy shipbuilding and the potential future size and capabilities of the fleet. Illus.

Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress

Download Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 34 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress by : Ronald O'Rourke

Download or read book Navy Ship Procurement: Alternative Funding Approaches - Background and Options for Congress written by Ronald O'Rourke and published by . This book was released on 2005 with total page 34 pages. Available in PDF, EPUB and Kindle. Book excerpt: Some observers have proposed procuring Navy ships using incremental funding or advance appropriations rather than the traditional full funding approach that has been used to procure most Navy ships Supporters believe these alternative funding approaches could increase stability in Navy shipbuilding plans and perhaps increase the nm%ber of Navy ships that could be built for a given total amount of ship- procurement funding. The issue for the 109th Congress is whether to maintain or change current practices for finding Navy ship procurement. Congress' decision could be significant because the full finding policy relates to Congress' power ofthe purse and its responsibility for conducting oversight of defense programs.

Procurement of Naval Ships

Download Procurement of Naval Ships PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Procurement of Naval Ships by : Brady M. Cole

Download or read book Procurement of Naval Ships written by Brady M. Cole and published by . This book was released on 1979 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: A history of the evolution of the Navy's serious problems in parallel with the shipbuilding industry's decline on the world market since World War II. A major portion of the industry's business now comes from government funding. While the number of shipbuilders has decreased, the industry has been dominated by a relatively small number of large corporations for whom shipbuilding is only a minor portion of their corporate business. In turn, the Navy is totally dependent on an industry increasingly inclined to challenge the Navy's procurement an contracting requirements.

Navy Ship Procurement Rate and the Planned Size of the Navy

Download Navy Ship Procurement Rate and the Planned Size of the Navy PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (471 download)

DOWNLOAD NOW!


Book Synopsis Navy Ship Procurement Rate and the Planned Size of the Navy by :

Download or read book Navy Ship Procurement Rate and the Planned Size of the Navy written by and published by . This book was released on 2001 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: There is currently no officially approved, consensus plan for the future size and structure of the Navy. The absence of such a plan could complicate Congress2 ability to conduct oversight of the Navy2s budget and individual Navy ship-acquisition programs. DOD is proposing to procure new Navy ships during most of its amended FY2004-FY2009 Future Years Defense Plan (FYDP) at an average rate less than what would be required, over the long run, to maintain a Navy of 310 or more ships over the long run. This report will be updated as events warrant.

Crs Report for Congress

Download Crs Report for Congress PDF Online Free

Author :
Publisher : BiblioGov
ISBN 13 : 9781289861902
Total Pages : 42 pages
Book Rating : 4.8/5 (619 download)

DOWNLOAD NOW!


Book Synopsis Crs Report for Congress by : Ronald O'Rourke

Download or read book Crs Report for Congress written by Ronald O'Rourke and published by BiblioGov. This book was released on 2013-10 with total page 42 pages. Available in PDF, EPUB and Kindle. Book excerpt: Rising procurement costs for Navy ships have recently emerged as a matter of concern for both Navy officials and some Members of Congress who track Navyrelated issues. Combined with constraints on ship-procurement funding, these rising costs have caused the Navy to reduce planned ship procurement rates. The issue for Congress is how to respond to rising Navy ship procurement costs. Aside from reducing planned ship procurement rates, one option would be to reduce Navy ship procurement costs by shifting from currently planned designs to designs with lower unit procurement costs. Lower-cost designs for attack submarines, aircraft carriers, larger surface combatants, and smaller surface combatants have been proposed in recent reports by the Congressional Budget Office (CBO), DOD's Office of Force Transformation (OFT), and the Center for Strategic and Budgetary Assessments (CSBA). Options for lower-cost designs can be generated by reducing ship size; shifting from nuclear to conventional propulsion; shifting from a hull built to military survivability standards to a hull built to commercial-ship survivability standards; or using a common hull design for multiple classes of ships. Compared to the current Virginia-class nuclear-powered attack submarine (SSN) design, lower-cost options include a non-nuclear-powered submarine equipped with an air-independent propulsion (AIP) system and ...

Navy Ship Procurement

Download Navy Ship Procurement PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 0 pages
Book Rating : 4.:/5 (137 download)

DOWNLOAD NOW!


Book Synopsis Navy Ship Procurement by :

Download or read book Navy Ship Procurement written by and published by . This book was released on 2006 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Some observers have proposed procuring Navy ships using incremental funding or advance appropriations rather than the traditional full funding approach that has been used to procure most Navy ships. Supporters believe these alternative funding approaches could increase stability in Navy shipbuilding plans and perhaps increase the number of Navy ships that could be built for a given total amount of shipprocurement funding. The issue for the 109th Congress is whether to maintain or change current practices for funding Navy ship procurement. Congress's decision could be significant because the full funding policy relates to Congress's power of the purse and its responsibility for conducting oversight of defense programs. For Department of Defense (DOD) procurement programs, the full funding policy requires the entire procurement cost of a usable end item (such as a Navy ship) to be funded in the year in which the item is procured. Congress imposed the full funding policy on DOD in the 1950s to strengthen discipline in DOD budgeting and improve Congress's ability to control DOD spending and carry out its oversight of DOD activities. Under incremental funding, a weapon's cost is divided into two or more annual increments that Congress approves separately each year. Supporters could argue that using it could avoid or mitigate budget spikes associated with procuring very expensive ships such as aircraft carriers or "large-deck" amphibious assault ships. Opponents could argue that using it could make total ship procurement costs less visible and permit one Congress to budgetarily "tie the hands" of future Congresses. Under advance appropriations, Congress makes a one-time decision to fund the entire procurement cost of an end item. That cost can then be divided into two or more annual increments that are assigned to (in budget terminology, "scored in") two or more fiscal years. Supporters could argue that using advance appropriations could avoid or mitigate budget spikes without some of the potential disadvantages of incremental funding. Opponents could argue that advance appropriations retains (or even expands) a key potential disadvantage of incremental finding -- that of tying the hands of future Congresses. Using incremental funding or advance appropriations could, under certain circumstances, marginally reduce the cost of Navy ships. Under certain other circumstances, however, it could increase costs. Options for Congress include maintaining current ship-procurement funding practices; strengthening adherence to the full funding policy; increasing the use of incremental funding; beginning to use advance appropriations; and transferring lead-ship detailed design and nonrecurring engineering costs to the research and development account. Arguments could be made in support of or against each of these options. This report will be updated as events warrant.

Naval Ship Transfers

Download Naval Ship Transfers PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.F/5 ( download)

DOWNLOAD NOW!


Book Synopsis Naval Ship Transfers by : United States. Congress. Senate. Committee on Armed Services. Subcommittee on General Procurement

Download or read book Naval Ship Transfers written by United States. Congress. Senate. Committee on Armed Services. Subcommittee on General Procurement and published by . This book was released on 1980 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher :
ISBN 13 : 9781542945417
Total Pages : pages
Book Rating : 4.9/5 (454 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Ronald O'Rourke

Download or read book Navy Force Structure and Shipbuilding Plans written by Ronald O'Rourke and published by . This book was released on 2017-02-06 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: -- The 355-ship force-level goal is the result of a new Force Structure Assessment (FSA) conducted by the Navy. An FSA is an analysis in which the Navy solicits inputs from U.S. regional combatant commanders (CCDRs) regarding the types and amounts of Navy capabilities that CCDRs deem necessary for implementing the Navy's portion of the national military strategy, and then translates those CCDR inputs into required numbers of ships, using current and projected Navy ship types. The analysis takes into account Navy capabilities for both warfighting and day-to-day forward-deployed presence. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. -- The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. -- The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy). A January 27, 2017, national security presidential memorandum on rebuilding the U.S. armed forces signed by President Trump states: "Upon transmission of a new National Security Strategy to Congress, the Secretary [of Defense] shall produce a National Defense Strategy (NDS). The goal of the NDS shall be to give the President and the Secretary maximum strategic flexibility and to determine the force structure necessary to meet requirements." -- Although the 355-ship plan includes 47 more ships than the previous 308-ship plan, CRS notionally estimates that achieving and maintaining the 355-ship fleet could require adding 57 to 67 ships, including 19 attack submarines and 23 large surface combatants, to the Navy's FY2017 30-year shipbuilding plan, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships. -- CRS estimates that procuring the 57 to 67 ships that might need to be added the 30-year shipbuilding plan to achieve and maintain a 355-ship fleet - a total that equates an average of about 1.9 to 2.2 additional ships per year over the 30-year period - could cost an average of roughly $4.6 billion to $5.1 billion per year in additional shipbuilding funds over the 30-year period, using today's shipbuilding costs. These additional shipbuilding funds are only a fraction of the total additional cost that would be needed to achieve and maintain a 355-ship fleet instead of 308-ship fleet. -- If defense spending in coming years is not increased above the caps established in the Budget Control Act of 2011, or BCA (S. 365/P.L. 112-25 of August 2, 2011), as amended, achieving and maintaining a 355-ship fleet could require reducing funding levels for other DOD programs. -- Navy officials have stated that, in general, the shipbuilding industrial base has the capacity to take on the additional shipbuilding work needed to achieve and maintain a 355-ship fleet, and that building toward the 355-ship goal sooner rather than later would be facilitated by ramping up production of existing ship designs rather than developing and then starting production of new designs.

Irregularities in Navy Ship Procurement

Download Irregularities in Navy Ship Procurement PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 348 pages
Book Rating : 4.0/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Irregularities in Navy Ship Procurement by : United States. Congress. Senate. Committee on Governmental Affairs. Permanent Subcommittee on Investigations

Download or read book Irregularities in Navy Ship Procurement written by United States. Congress. Senate. Committee on Governmental Affairs. Permanent Subcommittee on Investigations and published by . This book was released on 1983 with total page 348 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Navy Ship Acquisition: Options for Lower-Cost Ship Designs - Issues for Congress. CRS Report for Congress

Download Navy Ship Acquisition: Options for Lower-Cost Ship Designs - Issues for Congress. CRS Report for Congress PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 39 pages
Book Rating : 4.:/5 (644 download)

DOWNLOAD NOW!


Book Synopsis Navy Ship Acquisition: Options for Lower-Cost Ship Designs - Issues for Congress. CRS Report for Congress by :

Download or read book Navy Ship Acquisition: Options for Lower-Cost Ship Designs - Issues for Congress. CRS Report for Congress written by and published by . This book was released on 2005 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: Rising procurement costs for Navy ships have recently emerged as a matter of concern for both Navy officials and some Members of Congress who track Navy-related issues. Combined with constraints on ship-procurement funding, these rising costs have caused the Navy to reduce planned ship procurement rates. The issue for Congress is how to respond to rising Navy ship procurement costs. Aside from reducing planned ship procurement rates, one option would be to reduce procurement costs by shifting from currently planned designs to designs with lower unit procurement costs. Lower cost designs for attack submarines, aircraft carriers, larger surface combatants, and smaller surface combatants have been proposed in recent reports by the Congressional Budget Office (CBO), DoD's Office of Force Transformation (OFT), and the Center for Strategic and Budgetary Assessments (CSBA). Options for lower cost designs can be generated by reducing ship size; shifting from nuclear to conventional propulsion; shifting from a hull built to military survivability standards to a hull built to commercial ship survivability standards; or using a common hull design for multiple classes of ships. Compared to the current Virginia-class, nuclear-powered attack submarine (SSN) design, lower cost options include a non-nuclear-powered submarine equipped with an air-independent propulsion (AIP) system and a reduced-cost SSN design using new technologies now being developed. Compared to today's large, nuclear-powered aircraft carriers, lower cost options include a medium-sized, conventionally powered carrier based on either the LHA(R) amphibious assault ship design or a commercial-like hull, and a small, high-speed carrier using a surface effect ship (SES)/catamaran hull. Compared to the current 14,000-ton DD(X) destroyer design, lower cost options include a newly designed 9,000-ton surface combatant (SC(X)), a 6,000-ton frigate (FFG(X)), or a low-cost gunfire support ship.

Navy Ship Acquisition

Download Navy Ship Acquisition PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 0 pages
Book Rating : 4.:/5 (137 download)

DOWNLOAD NOW!


Book Synopsis Navy Ship Acquisition by :

Download or read book Navy Ship Acquisition written by and published by . This book was released on 2005 with total page 0 pages. Available in PDF, EPUB and Kindle. Book excerpt: Rising procurement costs for Navy ships have recently emerged as a matter of concern for both Navy officials and some Members of Congress who track Navyrelated issues. Combined with constraints on ship-procurement funding, these rising costs have caused the Navy to reduce planned ship procurement rates. The issue for Congress is how to respond to rising Navy ship procurement costs. Aside from reducing planned ship procurement rates, one option would be to reduce Navy ship procurement costs by shifting from currently planned designs to designs with lower unit procurement costs. Lower-cost designs for attack submarines, aircraft carriers, larger surface combatants, and smaller surface combatants have been proposed in recent reports by the Congressional Budget Office (CBO), DOD's Office of Force Transformation (OFT), and the Center for Strategic and Budgetary Assessments (CSBA). Options for lower-cost designs can be generated by reducing ship size; shifting from nuclear to conventional propulsion; shifting from a hull built to military survivability standards to a hull built to commercial-ship survivability standards; or using a common hull design for multiple classes of ships. Compared to the current Virginia-class nuclear-powered attack submarine (SSN) design, lower-cost options include a non-nuclear-powered submarine equipped with an air-independent propulsion (AIP) system and a reduced-cost SSN design using new technologies now being developed. Compared to today's large, nuclearpowered aircraft carriers, lower-cost options include a medium-sized, conventionally powered carrier based on either the LHA(R) amphibious assault ship design or a commercial-like hull, and a small, high-speed carrier using a surface effect ship (SES)/catamaran hull. Compared to the current 14,000-ton DD(X) destroyer design, lower-cost options include a new-design 9,000-ton surface combatant (SC(X)), a 6,000-ton frigate (FFG(X)), or a low-cost gunfire support ship. Compared to the current 2,500- to 3,000-ton Littoral Combat Ship (LCS) design, lower cost options include a 1,000- or 100-ton surface combatant. The FY2006 defense authorization bill (H.R. 1815) as reported by the House Armed Services Committee (H.Rept. 109-89) contains provisions that establish procurement cost caps on several Navy shipbuilding programs, direct the Navy to begin developing a lower-cost destroyer and a lower-cost nuclear-powered submarine, and create a new program for U.S. shipyards aimed in part at improving the efficiency and cost-effectiveness of the construction of Navy ships. The committee's report expressed concern regarding rising Navy ship procurement costs. In its report (S.Rept. 109-69) on the FY2006 defense authorization bill (S. 1042), the Senate Armed Services Committee expressed concern for the Navy's shipbuilding program and the committee's belief that significantly higher funding is required in the shipbuilding budget. In its report (H.Rept. 109-119) on the FY2006 defense appropriations bill (H.R. 2863), the House Armed Services Committee expressed concern over instability in Navy shipbuilding programs and rising ship costs. This report will be updated as events warrant.

U.S. Navy Ship Procurement

Download U.S. Navy Ship Procurement PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 140 pages
Book Rating : 4.:/5 (12 download)

DOWNLOAD NOW!


Book Synopsis U.S. Navy Ship Procurement by : International Maritime Associates

Download or read book U.S. Navy Ship Procurement written by International Maritime Associates and published by . This book was released on 1985 with total page 140 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Søren Rosberg

Download Søren Rosberg PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (474 download)

DOWNLOAD NOW!


Book Synopsis Søren Rosberg by :

Download or read book Søren Rosberg written by and published by . This book was released on with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781981318940
Total Pages : 134 pages
Book Rating : 4.3/5 (189 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Congressional Service

Download or read book Navy Force Structure and Shipbuilding Plans written by Congressional Service and published by Createspace Independent Publishing Platform. This book was released on 2017-12 with total page 134 pages. Available in PDF, EPUB and Kindle. Book excerpt: The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. The Navy's proposed FY2018 budget, as amended on May 24, 2017, requests the procurement of nine new ships, including one Gerald R. Ford (CVN-78) class aircraft carrier, two Virginia-class attack submarines, two DDG-51 class destroyers, two Littoral Combat Ships (LCSs), one TAO-205 class oiler, and one towing, salvage, and rescue ship. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: The 355-ship force-level goal is the result of a Force Structure Assessment (FSA) conducted by the Navy in 2016. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy), while the Trump campaign organization's 350-ship goal appears to have a different origin. Compared to the previous 308-ship force-level goal, the new 355-ship force-level goal includes 47 additional ships, or about 15% more ships. More than 47 ships, however, would need to be added to the Navy's 30-year shipbuilding plan to achieve and maintain the Navy's 355-ship fleet, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships: CRS estimates that 57 to 67 ships would need to be added to the Navy's FY2017 30-year (FY2017-FY2046) shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it through the end of the 30-year period (i.e., through FY2046).

Navy Force Structure and Shipbuilding Plans

Download Navy Force Structure and Shipbuilding Plans PDF Online Free

Author :
Publisher : CreateSpace
ISBN 13 : 9781505903805
Total Pages : 70 pages
Book Rating : 4.9/5 (38 download)

DOWNLOAD NOW!


Book Synopsis Navy Force Structure and Shipbuilding Plans by : Congressional Research Congressional Research Service

Download or read book Navy Force Structure and Shipbuilding Plans written by Congressional Research Congressional Research Service and published by CreateSpace. This book was released on 2014-12-22 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's proposed FY2015 budget requests funding for the procurement of seven new battle force ships (i.e., ships that count against the Navy's goal for achieving and maintaining a fleet of 306 ships). The seven ships include two Virginia-class attack submarines, two DDG-51 class Aegis destroyers, and three Littoral Combat Ships (LCSs). The Navy's proposed FY2015-FY2019 five-year shipbuilding plan includes a total of 44 ships, compared to a total of 41 ships in the FY2014-FY2018 five-year shipbuilding plan. The planned size of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been matters of concern for the congressional defense committees for the past several years. The Navy's FY2015 30-year (FY2015-FY2044) shipbuilding plan, like many previous Navy 30-year shipbuilding plans, does not include enough ships to fully support all elements of the Navy's 306-ship goal over the entire 30-year period. In particular, the Navy projects that the fleet would experience a shortfall in amphibious ships from FY2015 through FY2017, a shortfall in small surface combatants from FY2015 through FY2027, and a shortfall in attack submarines from FY2025 through FY2034. The Navy delivered its narrative report on the FY2015 30-year shipbuilding plan to CRS on July 3, 2014. The Navy estimates in the report that the plan would cost an average of about $16.7 billion per year in constant FY2014 dollars to implement, including an average of about $15.7 billion per year during the first 10 years of the plan, an average of about $19.7 billion per year during the middle 10 years of the plan, and an average of about $14.6 billion per year during the final 10 years of the plan. A December 2014 Congressional Budget Office (CBO) report on the Navy's FY2015 30-year shipbuilding plan estimates that the plan will require about 13% more funding to implement than the Navy estimates, including about 6% more than the Navy estimates during the first 10 years of the plan, about 14% more than the Navy estimates during the middle 10 years of the plan, and about 20% more than the Navy estimates during the final 10 years of the plan. Over the years, CBO's estimates of the cost to implement the Navy's 30-year shipbuilding plan have generally been higher than the Navy's estimates. Some of the difference between CBO's estimates and the Navy's estimates, particularly in the latter years of the plan, is due to a difference between CBO and the Navy in how to treat inflation in Navy shipbuilding. The program that contributes the most to the difference between the CBO and Navy estimates of the cost of the 30-year plan is a future destroyer that appears in the latter years of the 30-year plan.

Crs Report for Congress

Download Crs Report for Congress PDF Online Free

Author :
Publisher : BiblioGov
ISBN 13 : 9781293022931
Total Pages : 58 pages
Book Rating : 4.0/5 (229 download)

DOWNLOAD NOW!


Book Synopsis Crs Report for Congress by : Congressional Research Service: The Libr

Download or read book Crs Report for Congress written by Congressional Research Service: The Libr and published by BiblioGov. This book was released on 2013-10 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Navy's FY2011-FY2015 shipbuilding plan called for procuring an 11th and final San Antonio (LPD-17) class amphibious ship in FY2012. The Navy estimated the procurement cost of this ship at $2,040.6 million. The ship received $184.0 million in FY2010 advance procurement funding, and the Navy planned to request the remaining $1,856.6 million of the ship's procurement cost in the FY2012 budget. Accordingly, the Navy's proposed FY2011 budget did not request any procurement or advance procurement funding for the LPD-17 program. Some observers have suggested using the LPD-17 design as the basis for the LSD(X), a new class of amphibious ships that the Navy plans to start procuring in FY2017 as replacements for the Navy's 12 aging Whidbey Island/Harpers Ferry (LSD-41/49) class amphibious ships. Procuring a 12th LPD-17 in FY2014 or FY2015 might be consistent with a strategy of using the LPD-17 design as the basis for the LSD(X) because it would keep the LPD-17 production line open until the start of LSD(X) procurement. Navy officials have mentioned the option of modifying the LPD-17 design as one possible approach for developing the LSD(X) design, but the Navy is also studying other possible approaches, including developing an all-new design. Navy plans do ...