National Dam Safety Program. White Oak Creek Dam (Zarahemla) (05104), Big Sandy River Basin, Dickenson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. White Oak Creek Dam (Zarahemla) (05104), Big Sandy River Basin, Dickenson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 43 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. White Oak Creek Dam (Zarahemla) (05104), Big Sandy River Basin, Dickenson County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. White Oak Creek Dam (Zarahemla) (05104), Big Sandy River Basin, Dickenson County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 43 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1048 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. White Oak Dam. (VA 11301), Rappahannock River Basin, Madison County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. White Oak Dam. (VA 11301), Rappahannock River Basin, Madison County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 94 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. White Oak Dam. (VA 11301), Rappahannock River Basin, Madison County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. White Oak Dam. (VA 11301), Rappahannock River Basin, Madison County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1979 with total page 94 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 954 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1980 with total page 954 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1428 pages
Book Rating : 4.:/5 (3 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1980 with total page 1428 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Phase I Inspection Report, National Dam Safety Program

Download Phase I Inspection Report, National Dam Safety Program PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (359 download)

DOWNLOAD NOW!


Book Synopsis Phase I Inspection Report, National Dam Safety Program by : United States. Army. Corps of Engineers. Wilmington District

Download or read book Phase I Inspection Report, National Dam Safety Program written by United States. Army. Corps of Engineers. Wilmington District and published by . This book was released on 1978 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Crab Orchard Creek Dam (Inventory Number VA 02102), New River Basin, Bland County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Crab Orchard Creek Dam (Inventory Number VA 02102), New River Basin, Bland County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Crab Orchard Creek Dam (Inventory Number VA 02102), New River Basin, Bland County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Crab Orchard Creek Dam (Inventory Number VA 02102), New River Basin, Bland County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Phase 1 Inspection Report, National Dam Safety Program

Download Phase 1 Inspection Report, National Dam Safety Program PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (359 download)

DOWNLOAD NOW!


Book Synopsis Phase 1 Inspection Report, National Dam Safety Program by : United States. Army. Corps of Engineers. Wilmington District

Download or read book Phase 1 Inspection Report, National Dam Safety Program written by United States. Army. Corps of Engineers. Wilmington District and published by . This book was released on 1978 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Moss Number 1 Dam (Inventory Number VA 05102), Dickenson County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 46 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report by : MARTIN (DEWARD M) AND ASSOCIATES INC WILLIAMSBURG VA.

Download or read book National Dam Safety Program. Scotts Mill Dam (VA-68001), Upper James River Basin, Lynchburg, Virginia. Phase I Inspection Report written by MARTIN (DEWARD M) AND ASSOCIATES INC WILLIAMSBURG VA. and published by . This book was released on 1979 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Moss Number 1 Fresh Water Supply Dam (Inventory Number VA 05103), Dickenson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Moss Number 1 Fresh Water Supply Dam (Inventory Number VA 05103), Dickenson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Moss Number 1 Fresh Water Supply Dam (Inventory Number VA 05103), Dickenson County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Moss Number 1 Fresh Water Supply Dam (Inventory Number VA 05103), Dickenson County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 37 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Cherrystone Number 1 (Inventory Number VA 14302), Pittsylvania County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Cherrystone Number 1 (Inventory Number VA 14302), Pittsylvania County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 76 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Cherrystone Number 1 (Inventory Number VA 14302), Pittsylvania County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Cherrystone Number 1 (Inventory Number VA 14302), Pittsylvania County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 76 pages. Available in PDF, EPUB and Kindle. Book excerpt: Cherrystone Creek Dam No. 1 is a zoned earthfill structure about 790 ft long and 57 ft high. The principal spillway consists of a 42 inch prestressed cylinder concrete pipe which extends through the structure. Water is discharged into the principal spillway through a reinforced concrete riser and is expelled into a reinforced concrete impact basin. The emergency spillway is a 135 ft wide vegetated earth channel. The dam is located on Cherrystone Creek about 2.5 miles northwest of Chatham, Virginia and was constructed for flood control and recreation. The dam is of 'intermediate' size and has been assigned a 'significant' hazard classification. The appropriate spillway design flood is the 1/2 Probable Maximum Flood (1/2 PMF). The emergency spillway will pass 80 percent of the PMF prior to overtopping. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the spillway is rated adequate.

National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report

Download National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 82 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Johns Creek Number 4. (Inventory Number VA 04504), James River Basin, Craig County, State of Virginia. Phase 1 Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 82 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. Phase I reports include project information, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report

Download National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 71 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report by : SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA.

Download or read book National Dam Safety Program. University Commons Dam (VA 76008), James River Basin, Richmond, Virginia. Phase I Inspection Report written by SCHNABEL ENGINEERING ASSOCIATES RICHMOND VA. and published by . This book was released on 1981 with total page 71 pages. Available in PDF, EPUB and Kindle. Book excerpt: University Commons Dam is a zoned earthfill structure about 300 ft long and 24 ft high. The spillway consists of an ogee shaped, concrete overflow spillway, which extends 254 ft across the dam. The dam is small size structure and is assigned a high hazard classification. The dam is located on Little Westhampton Creek, on the Campus of the University of Richmond in the City of Richmond, Virginia. The lake is used for recreation and is owned and maintained by the University of Richmond. The University Commons Dam spillway runs under the University Commons Building with a 6 ft clearance. The spillway abutments are part of the building foundation, and the building comprises the balance of the dam length beyond the spillway. Based on the criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 75 percent of the Probable Maximum Flood (PMF) or 150 percent of the SDF without reaching the masonry overhang of the University Commons Building. The spillway is rated adequate. The visual inspection did not reveal any problems which would require immediate attention. The dam is considered stable and a stability analysis is not required. An emergency operation and warning plan should be developed.

National Dam Safety Program. Carroll Dam (Stony Creek Number 10) (VA 17102), Potomac River Basin, Shenandoah County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Carroll Dam (Stony Creek Number 10) (VA 17102), Potomac River Basin, Shenandoah County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 64 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Carroll Dam (Stony Creek Number 10) (VA 17102), Potomac River Basin, Shenandoah County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Carroll Dam (Stony Creek Number 10) (VA 17102), Potomac River Basin, Shenandoah County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Laurel Creek Dam (Inventory Number VA 07704), New River Basin, Grayson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Laurel Creek Dam (Inventory Number VA 07704), New River Basin, Grayson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 41 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Laurel Creek Dam (Inventory Number VA 07704), New River Basin, Grayson County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Laurel Creek Dam (Inventory Number VA 07704), New River Basin, Grayson County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: Laurel Creek Dam is an earthen structure about 250 feet long and 17.5 feet high. The dam is classified as a small dam with a significant hazard classification. The principal spillway is a 30-inch corrugated metal pipe (CMP) drop-inlet with a 36-inch CMP control at normal pool. The emergency spillway is an open channel cut in the left abutment. The reservoir is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 100 Year Flood. The spillway will pass 9 percent of the PMF or 19 percent of the SDF without overtopping the crest of the dam. The SDF will overtop the dam by about 1 foot, flow over the dam about 4 hours and reach a maximum velocity of 4.6 feet per second. Overtopping velocities are not considered detrimental to the dam. The spillway is adjudged as inadequate but not seriously inadequate.