National Dam Safety Program. Lower Wallace Dam (Inventory Number VA-01527). Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lower Wallace Dam (Inventory Number VA-01527). Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lower Wallace Dam (Inventory Number VA-01527). Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Lower Wallace Dam (Inventory Number VA-01527). Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: Lower Wallace Dam is a homogeneous earthfill structure about 450 ft long and 25 ft high. The principal spillway consists of a 15 inch diameter corrugated metal pipe (CMP) riser and outlet pipe which extends through the structure. A secondary spillway consists of a CMP and a square inlet box which is located at the right abutment approximately 0.5 feet above the crest of the riser inlet. A 43 ft wide emergency spillway is located at the left abutment approximately 4 ft above normal pool. The dam is located on Poor Creek approximately one mile east of Greenville, Virginia. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 15 percent of the Probable Maximum Flood (PMF) or 30 percent of the SDF. During the SDF the Dam will be overtopped by a maximum of 1.7 ft for a period of 5 hours at a maximum velocity of 5.8 fps. The spillway is judged inadequate but not seriously inadequate.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 228 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1981 with total page 228 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Upper Wallace Dam, (Inventory Number VA 01516), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Wallace Dam, (Inventory Number VA 01516), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 46 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Wallace Dam, (Inventory Number VA 01516), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Upper Wallace Dam, (Inventory Number VA 01516), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 46 pages. Available in PDF, EPUB and Kindle. Book excerpt: Upper Wallace Dam is a homogeneous earthfill structure about 325 ft long and 40 ft high. The principal spillway consists of a rectangular concrete riser and an outlet pipe which extends through the structure. The top of the dam serves as an access road to the Owner's residence with a 10 ft wide gravel surface. An earth emergency spillway is located at the right abutment with a 70 ft wide bottom and 2H:1V side slopes. The dam is located on Poor Creek approximately one mile east of Greenville, Virginia. The lake is for recreational purposes and is owned and maintained by Mr. Gregory Chandler. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillway will pass 80 percent of the Probable Maximum Flood (PMF) or 160 percent of the SDF. The spillway is judged adequate. An evaluation of the stability condition could not be made since there is no design or construction data for this structure.

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1176 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1981 with total page 1176 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 45 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. South River Number 3 Dam, (Inventory Number VA 01510), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 45 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

Government Reports Annual Index

Download Government Reports Annual Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 932 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index by :

Download or read book Government Reports Annual Index written by and published by . This book was released on 1981 with total page 932 pages. Available in PDF, EPUB and Kindle. Book excerpt: Sections 1-2. Keyword Index.--Section 3. Personal author index.--Section 4. Corporate author index.-- Section 5. Contract/grant number index, NTIS order/report number index 1-E.--Section 6. NTIS order/report number index F-Z.

National Dam Safety Program. South River Dam, Number 25 (VA 01502), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Dam, Number 25 (VA 01502), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 48 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Dam, Number 25 (VA 01502), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report by : Michale Baker (III.)

Download or read book National Dam Safety Program. South River Dam, Number 25 (VA 01502), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report written by Michale Baker (III.) and published by . This book was released on 1978 with total page 48 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Smithleigh Dam (Inventory Number VA 01523), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Smithleigh Dam (Inventory Number VA 01523), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 84 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Smithleigh Dam (Inventory Number VA 01523), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Smithleigh Dam (Inventory Number VA 01523), Potomac River Basin, Augusta County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1980 with total page 84 pages. Available in PDF, EPUB and Kindle. Book excerpt: Contents: Preface; Brief Assessment of Dam; Overview Photos; Section 1: Project Information; Section 2: Engineering Data; Section 3: Visual Inspection; Section 4: Operational Procedures; Section 5: Hydraulic/Hydrologic Data; Section 6: Dam Stability; Section 7: Assessment/Remedial Measures; and Appendices.

National Dam Safety Program. South River Number 26 (ID Number VA-01501), Potomac River Basin, Inch Branch. Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Number 26 (ID Number VA-01501), Potomac River Basin, Inch Branch. Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Number 26 (ID Number VA-01501), Potomac River Basin, Inch Branch. Augusta County, Virginia. Phase I Inspection Report by : BAKER (MICHAEL) JR INC BEAVER PA.

Download or read book National Dam Safety Program. South River Number 26 (ID Number VA-01501), Potomac River Basin, Inch Branch. Augusta County, Virginia. Phase I Inspection Report written by BAKER (MICHAEL) JR INC BEAVER PA. and published by . This book was released on 1980 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigations and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic/hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 128 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report by : Carl S Anderson (Jr)

Download or read book National Dam Safety Program. Lower North River Number 82 Dam (Inventory Number VA 16507), Potomac River Basin, Rockingham County, Virginia. Phase I Inspection Report written by Carl S Anderson (Jr) and published by . This book was released on 1981 with total page 128 pages. Available in PDF, EPUB and Kindle. Book excerpt: Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Potomac River Basin. South River Dam Number 11 (VA 01512), Augusta County, State of Virginia. Phase I. Inspection Report

Download National Dam Safety Program. Potomac River Basin. South River Dam Number 11 (VA 01512), Augusta County, State of Virginia. Phase I. Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 47 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac River Basin. South River Dam Number 11 (VA 01512), Augusta County, State of Virginia. Phase I. Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Potomac River Basin. South River Dam Number 11 (VA 01512), Augusta County, State of Virginia. Phase I. Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 47 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report

Download National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 67 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Potomac River Basin. Lower North River, Number 22B (Inventory Number VA 16504), Rockingham County, State of Virginia, Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 67 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. South River Number 23 (VA 01508), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Number 23 (VA 01508), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 53 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Number 23 (VA 01508), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. South River Number 23 (VA 01508), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 53 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life of property. The assessment of the general condition of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope to a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. South River Dam Number 27, (VA 01503), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. South River Dam Number 27, (VA 01503), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 64 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. South River Dam Number 27, (VA 01503), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. South River Dam Number 27, (VA 01503), Potomac River Basin, Augusta County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 64 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Coles Run Dam (VA 01519). Potomac River Basin. Augusta County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Coles Run Dam (VA 01519). Potomac River Basin. Augusta County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 49 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Coles Run Dam (VA 01519). Potomac River Basin. Augusta County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Coles Run Dam (VA 01519). Potomac River Basin. Augusta County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 49 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Upper Apple Mountain & Lower Apple Mountain. Dam (Inventory Number VA 18711 and VA 18709), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Apple Mountain & Lower Apple Mountain. Dam (Inventory Number VA 18711 and VA 18709), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 54 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Apple Mountain & Lower Apple Mountain. Dam (Inventory Number VA 18711 and VA 18709), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Upper Apple Mountain & Lower Apple Mountain. Dam (Inventory Number VA 18711 and VA 18709), Potomac River Basin, Warren County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 54 pages. Available in PDF, EPUB and Kindle. Book excerpt: Upper and Lower Apple Mountain Dams are two impounding structures with the tailwater of the Upper Dam being the reservoir water surface of the Lower Dam. The Upper Dam is an earthen embankment about 351 feet long and 34.5 feet high, while the Lower Lake Dam is an earthen embankment about 377 feet long and 32.9 feet high. The dams are classified as small dams with a hazard classification of significant based on location. The emergency spillway for each dam is an earthen channel located at the left abutment of each dam. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 100-year flood for each. The emergency spillway of the upper dam will pass 6 percent of the PMF and 100 percent of the SDF without overtopping while the lower dam will pass 4 percent of the PMF and 100 percent of the SDF without overtopping. Therefore, the spillway of each dam is adjudged as adequate.

National Dam Safety Program. Sherando Dam (VA 01520), Potomac River Basin, North Fork of Back Creek, Augusta County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Sherando Dam (VA 01520), Potomac River Basin, North Fork of Back Creek, Augusta County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 75 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Sherando Dam (VA 01520), Potomac River Basin, North Fork of Back Creek, Augusta County, Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Sherando Dam (VA 01520), Potomac River Basin, North Fork of Back Creek, Augusta County, Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1978 with total page 75 pages. Available in PDF, EPUB and Kindle. Book excerpt: The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.