National Dam Safety Program. Long Pine Run Dam (Inventory Number NDS-328), Birch Run, Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Long Pine Run Dam (Inventory Number NDS-328), Birch Run, Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 60 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Long Pine Run Dam (Inventory Number NDS-328), Birch Run, Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Long Pine Run Dam (Inventory Number NDS-328), Birch Run, Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 60 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-237 (Appendix III) authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of safety inspections of dams throughout the United States. The Phase I Inspection and Report is limited to a review of available data, a visual inspection of the dam site and the basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1186 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on 1979 with total page 1186 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1044 pages
Book Rating : 4.3/5 (91 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1979 with total page 1044 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government reports annual index

Download Government reports annual index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1018 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government reports annual index by :

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 1018 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Annual Index: Keyword A-L

Download Government Reports Annual Index: Keyword A-L PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 840 pages
Book Rating : 4.:/5 (319 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Annual Index: Keyword A-L by :

Download or read book Government Reports Annual Index: Keyword A-L written by and published by . This book was released on 1979 with total page 840 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Antietam Dam (NDS PA-332). Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Antietam Dam (NDS PA-332). Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 52 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Antietam Dam (NDS PA-332). Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Antietam Dam (NDS PA-332). Potomac River Basin, Adams County, Commonwealth of Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 52 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367, authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspections of dams throughout the United States. Phase I Inspection and Report is limited to a review of available data, a visual inspection of the dam site and the basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Thomas W. Koon Dam (Inventory Number NDS-240), Evitts Creek, Potomac River Basin, Bedford County, Commonwealth of Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Thomas W. Koon Dam (Inventory Number NDS-240), Evitts Creek, Potomac River Basin, Bedford County, Commonwealth of Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 65 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Thomas W. Koon Dam (Inventory Number NDS-240), Evitts Creek, Potomac River Basin, Bedford County, Commonwealth of Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Thomas W. Koon Dam (Inventory Number NDS-240), Evitts Creek, Potomac River Basin, Bedford County, Commonwealth of Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 65 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-237 (Appendix III) authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspections of dams throughout the United States. Phase I Inspection and Report is limited to a review of available data, a visual inspection of the dam site and the basic hydraulic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Lake Heritage Property Owner Dam (NDI-PA-334), Potomac River Basin, Plum Run, Adams County, Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Lake Heritage Property Owner Dam (NDI-PA-334), Potomac River Basin, Plum Run, Adams County, Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 69 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Heritage Property Owner Dam (NDI-PA-334), Potomac River Basin, Plum Run, Adams County, Pennsylvania. Phase I Inspection Report by : CORPS OF ENGINEERS BALTIMORE MD BALTIMORE DISTRICT.

Download or read book National Dam Safety Program. Lake Heritage Property Owner Dam (NDI-PA-334), Potomac River Basin, Plum Run, Adams County, Pennsylvania. Phase I Inspection Report written by CORPS OF ENGINEERS BALTIMORE MD BALTIMORE DISTRICT. and published by . This book was released on 1978 with total page 69 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367 authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of dam inspections throughout the United States. The purpose is to determine if the dam constitutes a hazard to human life or property.

National Dam Inspection Program. Pine Run Dam Number 1 (NDS ID Number PA-648, DER ID Number 40-20), Susquehanna River Basin, Pine Run, Luzerne County, Pennsylvania. Phase I Inspection Report

Download National Dam Inspection Program. Pine Run Dam Number 1 (NDS ID Number PA-648, DER ID Number 40-20), Susquehanna River Basin, Pine Run, Luzerne County, Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 107 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Inspection Program. Pine Run Dam Number 1 (NDS ID Number PA-648, DER ID Number 40-20), Susquehanna River Basin, Pine Run, Luzerne County, Pennsylvania. Phase I Inspection Report by : KIMBALL (L ROBERT) AND ASSOCIATES EBENSBURG PA.

Download or read book National Dam Inspection Program. Pine Run Dam Number 1 (NDS ID Number PA-648, DER ID Number 40-20), Susquehanna River Basin, Pine Run, Luzerne County, Pennsylvania. Phase I Inspection Report written by KIMBALL (L ROBERT) AND ASSOCIATES EBENSBURG PA. and published by . This book was released on 1980 with total page 107 pages. Available in PDF, EPUB and Kindle. Book excerpt: The assessment of Pine Run Dam No. 1 is based upon visual observations made at the time of inspection, review of available records and data, hydraulic and hydrologic computations and past operational performance. Pine Run Dam No. 1 appears to be in poor condition. Severe deterioration of the downstream slope, in particular, the overflow section, exists. The concrete has extensive cracks, and deteriorated portions. Seepage is passing through portions of the dam and under the spillway slabs. The mortar between the masonry blocks on the exposed downstream slope has eroded. The concrete buttresses have severely deteriorated and show stress cracks. The stability analysis conducted for this study which was based on assumed strength parameters indicates that the dam is unstable with water levels corresponding to the top of the non-overflow section (elevation 949.0). Pine Run Dam No. 1 is a high hazard-intermediate size dam. The recommended spillway design flood (SDF) for this dam is the PMF. The spillway and reservoir are capable of controlling approximately 30% of the PMF without overtopping the embankment. Based on criteria established by the Corps of Engineers, the spillway is termed seriously inadequate. If Pine Run Dam No. 1 fails due to overtopping, the hazard to loss of life and property immediately downstream of the dam would be significantly increased from that which would exist just prior to the overtopping. Pine Run Dam No. 1 is classified as an unsafe non-emergency dam. (Author).

National Dam Safety Program. Unimin Tailings Dam (Inventory Number VA 06918), Potomac River Basin, Frederick County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Unimin Tailings Dam (Inventory Number VA 06918), Potomac River Basin, Frederick County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 74 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Unimin Tailings Dam (Inventory Number VA 06918), Potomac River Basin, Frederick County, Commonwealth of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Unimin Tailings Dam (Inventory Number VA 06918), Potomac River Basin, Frederick County, Commonwealth of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1981 with total page 74 pages. Available in PDF, EPUB and Kindle. Book excerpt: Unimin Tailings Dam is an earthfill embankment approximately 84.9 feet high and 574 feet long. The principal spillway is a 30-inch bituminous coated corrugated metal pipe riser and the emergency spillway is natural, topographic saddle on the right side of the reservoir. The dam is on Mine Spring Run approximately 1.2 miles south of Gore, Virginia, and is used for waste tailing storage by the owner, Unimin Corporation. Unimin Tailings Dam is an 'intermediate' size- 'high' hazard structure as defined by the Recommended Guidelines for Safety Inspection of Dams. Adequate stability analyses were available for review during these investigations which evaluated the factors of safety against complete and partial failures of both the upstream and downstream embankments. All of the analyses performed indicated acceptable factors of safety against failure. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the Probable Maximum Flood (PMF) was selected as the spillway design flood (SDF). The spillways are capable of passing 100 percent of the PMF without overtopping the crest of the dam, therefore, they are adjudged as adequate.

National Dam Safety Program. Little Pine Creek Dam (NDS PA-351). Susquehanna River Basin, Lycoming County, Commonwealth of Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Little Pine Creek Dam (NDS PA-351). Susquehanna River Basin, Lycoming County, Commonwealth of Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Little Pine Creek Dam (NDS PA-351). Susquehanna River Basin, Lycoming County, Commonwealth of Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Little Pine Creek Dam (NDS PA-351). Susquehanna River Basin, Lycoming County, Commonwealth of Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367, authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspections of dams throughout the United States. The Phase I Inspection and Report are limited to a review of available data, a visual inspection of the dam site and basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Lake Meade Dam, Susquehanna River Basin, Commonwealth of Pennsylvania, Adams County (NDS-PA-331). Phase I Inspection Report

Download National Dam Safety Program. Lake Meade Dam, Susquehanna River Basin, Commonwealth of Pennsylvania, Adams County (NDS-PA-331). Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Meade Dam, Susquehanna River Basin, Commonwealth of Pennsylvania, Adams County (NDS-PA-331). Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Lake Meade Dam, Susquehanna River Basin, Commonwealth of Pennsylvania, Adams County (NDS-PA-331). Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367, authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspections of dams throughout the United States. The Phase I Inspection and Report are limited to a review of available data, a visual inspection of the dam site and basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report by : Michael Baker (III.)

Download or read book National Dam Safety Program. Dry Run Number 102. Inventory Number: VA-13901. Potomac River Basin. Page County, State of Virginia. Phase I Inspection Report written by Michael Baker (III.) and published by . This book was released on 1979 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including remedial measures.

National Dam Inspection Program. Pine Run Dam (SCS PA-616) (NDS ID PA 00800 DER ID 9-170), Delaware River Basin, Pine Run Creek, Bucks County, Pennsylvania. Phase I Inspection Report

Download National Dam Inspection Program. Pine Run Dam (SCS PA-616) (NDS ID PA 00800 DER ID 9-170), Delaware River Basin, Pine Run Creek, Bucks County, Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 91 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Inspection Program. Pine Run Dam (SCS PA-616) (NDS ID PA 00800 DER ID 9-170), Delaware River Basin, Pine Run Creek, Bucks County, Pennsylvania. Phase I Inspection Report by : WOODWARD-CLYDE CONSULTANTS PLYMOUTH MEETING PA.

Download or read book National Dam Inspection Program. Pine Run Dam (SCS PA-616) (NDS ID PA 00800 DER ID 9-170), Delaware River Basin, Pine Run Creek, Bucks County, Pennsylvania. Phase I Inspection Report written by WOODWARD-CLYDE CONSULTANTS PLYMOUTH MEETING PA. and published by . This book was released on 1979 with total page 91 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pine Run Dam is a homogeneous embankment with an impervious cutoff trench beneath the centerline of the embankment. The dam is approximately 2,700 feet long and the height, measured from the stream bed to the crest, is 31.8 feet. Embankment fill was obtained from emergency spillway excavation and borrow areas within the reservoir. Zone I materials used in the cutoff trench are classified as low plastic silts, and Zone 2 materials are slightly less plastic but still classified as low plastic silts. The embankment internal drainage system discharges through the sidewalls of Saint Anthony's Falls (SAF) stilling basin at the downstream toe. The upstream slope is 3H:1V and the downstream slope is 2.5H:1V. The crest is 14 feet wide at elevation 287.8. The upstream slope has a 15 foot wide berm at approximately elevation 265, the normal sediment pool level.

National Dam Safety Program. Hunting Creek Dam (Inventory Number NDS-MD-58), Potomac River Basin, Frederick County, Maryland. Phase I Inspection Report

Download National Dam Safety Program. Hunting Creek Dam (Inventory Number NDS-MD-58), Potomac River Basin, Frederick County, Maryland. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Hunting Creek Dam (Inventory Number NDS-MD-58), Potomac River Basin, Frederick County, Maryland. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Hunting Creek Dam (Inventory Number NDS-MD-58), Potomac River Basin, Frederick County, Maryland. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367, authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of inspections of dams throughout the United States. The Phase I Inspection and Report are limited to a review of available data, a visual inspection of the dam site and basic calculations to determine the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Pinchot Lake Dam (Inventory Number NDS 335), Susquehanna River Basin, Beaver Creek, York County, Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Pinchot Lake Dam (Inventory Number NDS 335), Susquehanna River Basin, Beaver Creek, York County, Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Pinchot Lake Dam (Inventory Number NDS 335), Susquehanna River Basin, Beaver Creek, York County, Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Pinchot Lake Dam (Inventory Number NDS 335), Susquehanna River Basin, Beaver Creek, York County, Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam Inspection Act, Public Law 92-367 (Appendix III) authorized the Secretary of the Army, through the Corps of Engineers, to initiate a program of safety inspections of dams throughout the United States. Phase I INSPECTION AND Report is limited to a review of available data, a visual inspection of the dam site and the basic calculations for determining the hydraulic adequacy of the spillway. The purpose is to determine if the dam constitutes a hazard to human life and property.

National Dam Safety Program. Opossum Lake Dam (Inventory Number NDS 584), Susquehanna River Basin, Cumberland County, Commonwealth of Pennsylvania. Phase I Inspection Report

Download National Dam Safety Program. Opossum Lake Dam (Inventory Number NDS 584), Susquehanna River Basin, Cumberland County, Commonwealth of Pennsylvania. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 57 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Opossum Lake Dam (Inventory Number NDS 584), Susquehanna River Basin, Cumberland County, Commonwealth of Pennsylvania. Phase I Inspection Report by : BERGER ASSOCIATES INC HARRISBURG PA.

Download or read book National Dam Safety Program. Opossum Lake Dam (Inventory Number NDS 584), Susquehanna River Basin, Cumberland County, Commonwealth of Pennsylvania. Phase I Inspection Report written by BERGER ASSOCIATES INC HARRISBURG PA. and published by . This book was released on 1978 with total page 57 pages. Available in PDF, EPUB and Kindle. Book excerpt: Opposum Lake Dam is a zoned rolled earthfill dam with an impervious core. Construction was completed in June 1961. It was inspected 5 April 1978. This dam does not have the capacity to pass the recommended spillway design flood of one-half the Probable Maximum Flood without overtopping. The spillway capacity is not considered seriously inadequate, as the project will pass the 100-year flood. A serious and persistent problem exists in a constant seepage passage over most of the length of the downstream slope of the dam. It is recommended that the owner maintain continual surveillance of the dam until the embankment has been rehabilitated to correct the serious seepage problem.