National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 62 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Meade Dam (Inventory Number VA-80013), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 62 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Technical Abstract Bulletin

Download Technical Abstract Bulletin PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 1048 pages
Book Rating : 4.E/5 ( download)

DOWNLOAD NOW!


Book Synopsis Technical Abstract Bulletin by :

Download or read book Technical Abstract Bulletin written by and published by . This book was released on with total page 1048 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 100 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Burnt Mills Dam (Inventory Number VA-12303), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 100 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake Cohoon Dam (Inventory Number VA-12301), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake Cohoon Dam (Inventory Number VA-12301), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 109 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake Cohoon Dam (Inventory Number VA-12301), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake Cohoon Dam (Inventory Number VA-12301), Lower James River Basin, City of Suffolk, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 109 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

Government reports annual index

Download Government reports annual index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 900 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government reports annual index by :

Download or read book Government reports annual index written by and published by . This book was released on 199? with total page 900 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Government Reports Announcements & Index

Download Government Reports Announcements & Index PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 954 pages
Book Rating : 4.3/5 (129 download)

DOWNLOAD NOW!


Book Synopsis Government Reports Announcements & Index by :

Download or read book Government Reports Announcements & Index written by and published by . This book was released on 1980 with total page 954 pages. Available in PDF, EPUB and Kindle. Book excerpt:

National Dam Safety Program. Western Branch Reservoir Dam (VA-12311), Lower James River Basin, City of Suffolk, Virginia (Formerly Nansemond County). Phase I Inspection Report

Download National Dam Safety Program. Western Branch Reservoir Dam (VA-12311), Lower James River Basin, City of Suffolk, Virginia (Formerly Nansemond County). Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 61 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Western Branch Reservoir Dam (VA-12311), Lower James River Basin, City of Suffolk, Virginia (Formerly Nansemond County). Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Western Branch Reservoir Dam (VA-12311), Lower James River Basin, City of Suffolk, Virginia (Formerly Nansemond County). Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 61 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of th edam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additonal indepth study when necessary.

National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 50 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Nelson Dam (Inventory Number VA 12501), James River Basin, Nelson County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 50 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Dam is an earthfill structure about 738 feet long and 40.5 feet high. The dam is classified as 'intermediate' on the basis of size, and given a hazard classification of 'significant' on the basis of downstream area development. The principal spillway consists of an octagonally shaped concrete riser with eight rectangular openings serving as drop inlets. The emergency spillway is an open concrete channel cut at the right abutment. The spillway will pass 41 percent of the PMF or 82 percent of the SDF without overtopping the crest of the dam. The spillway is adjudged inadequate but not seriously inadequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures.

National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report

Download National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. College Lake Dam (Inventory Number VA 68002), James River Basin, City of Lynchburg, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: The College Lake Dam is an earthern embankment about 300 feet long and 35.4 feet high. The dam is owned and maintained by the City of Lynchburg. The dam is classified as an intermediate size structure with a high hazard classification. The spillway is a deteriorated masonry weir across a rock cut located in the right abutment. This reservoir is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the Probable Maximum Flood (PMF). The spillways will pass 10 percent of the PMF without overtopping the dam. Therefore the spillway is adjudged as inadequate but not seriously inadequate. The visual inspection revealed no problems or remedial measures in need of immediate attention. There is no regular maintenance operation program or warning system, and it is recommended that a maintenance program and a warning system be established. The maintenance items listed should be accomplished as a part of the regular maintenance program within the next 12 months.

National Dam Safety Program. Little Creek Reservoir Dam (Inventory Number VA 09506), James River Basin, James City County, Commonwealth of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Little Creek Reservoir Dam (Inventory Number VA 09506), James River Basin, James City County, Commonwealth of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 68 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Little Creek Reservoir Dam (Inventory Number VA 09506), James River Basin, James City County, Commonwealth of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Little Creek Reservoir Dam (Inventory Number VA 09506), James River Basin, James City County, Commonwealth of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1981 with total page 68 pages. Available in PDF, EPUB and Kindle. Book excerpt: Little Creek Reservoir Dam is an earthfill embankment 67.0 feet high and approximately 1,900 feet long. The dam has a drop-inlet spillway consisting of a 13 foot by 18 foot concrete riser with a 6 foot diameter concrete outlet pipe. The dam, located near Toano, Virginia, is used for water supply by the City of Newport News, Virginia. The dam is owned by the City of Newport News, Virginia. Little Creek Reservoir Dam is an 'intermediate' size - 'significant' hazard structure as defined by the Recommended Guidelines for Safety Inspections of Dams. The dam and appurtenant structures were found to be generally in good overall condition. Visual inspection and office analyses indicate deficiencies requiring remedial treatment. A stability check is not required. Using the Corps of Engineers' screening criteria for initial review of spillway adequacy, the Probable Maximum Flood (PMF) was selected as the spillway design flood (SDF) for Little Creek Reservoir Dam. The spillway is capable of passing up to 88 percent of the PMF without overtopping the dam. Despite the inability of the spillway to pass the SDF, the depth, duration, and rate of overtopping flows are not considered detrimental to the embankment.

National Dam Safety Program. Dover Lake Dam (Inventory Number VA 07503), James River Basin, Goochland County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Dover Lake Dam (Inventory Number VA 07503), James River Basin, Goochland County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 58 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Dover Lake Dam (Inventory Number VA 07503), James River Basin, Goochland County, Virginia. Phase I Inspection Report by : Ray E. Martin

Download or read book National Dam Safety Program. Dover Lake Dam (Inventory Number VA 07503), James River Basin, Goochland County, Virginia. Phase I Inspection Report written by Ray E. Martin and published by . This book was released on 1981 with total page 58 pages. Available in PDF, EPUB and Kindle. Book excerpt: Dover Lake Dam is a homogeneous earthfill structure about 530 ft long and 36 ft high. The principal spillway consists of twin 48 inch diameter concrete riser pipes and a 48 inch diameter pipe which extends through the structure. The structure is classified small in size and is assigned a significant hazard classification. Based on Corps of Engineers criteria, the appropriate Spillway Design Flood (SDF) is the 1/2 PMF. The spillways will pass 30 percent of the Probable Maximum Flood (PMF) or 60 percent of the SDF without overtopping the dam. The spillway is judged inadequate, but not seriously inadequate. The visual inspection revealed no apparent problems. It is recommended that the owner implement an emergency action plan measure to warn the downstream dwelling of any dangers which may be imminent. Routine maintenance and observation functions which should be initiated within the next twelve months are provided.

National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 70 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Robertson Dam (Inventory Number VA 16303), James River Basin, Rockbridge County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 70 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 63 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report by : michael Baker (III.)

Download or read book National Dam Safety Program. Upper Ragged Mountain Number 1, Inventory Number: VA-00356. James River Basin. Albermarle County, State of Virginia. Phase I Inspection Report written by michael Baker (III.) and published by . This book was released on 1979 with total page 63 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report

Download National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 51 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Mays Dam (Inventory Number VA 00909), James River Basin, Amherst County, State of Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1979 with total page 51 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 37 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report by : Paul Seiler

Download or read book National Dam Safety Program. Lake View Dam (VA-04119), Middle James River Basin, Chesterfield County, Virginia. Phase I Inspection Report written by Paul Seiler and published by . This book was released on 1979 with total page 37 pages. Available in PDF, EPUB and Kindle. Book excerpt: Pursuant to Public Law 92-367, Phase I Inspection Reports are prepared under guidance contained in the recommended guidelines for safety inspection of dams, published by the Office of Chief of Engineers, Washington, D.C. 20314. The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary.

National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 41 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report by : Boris O. Taran

Download or read book National Dam Safety Program. Turner Dam (Inventory Number VA 16308), James River Basin, Rockbridge County, Virginia. Phase I Inspection Report written by Boris O. Taran and published by . This book was released on 1981 with total page 41 pages. Available in PDF, EPUB and Kindle. Book excerpt: The dam is an earthfill structure about 800 feet long and 45.2 feet high. The dam is classified as an intermediate size dam with a significant hazard classification. The designed principal spillway is a 10-inch steel drop-inlet stand pipe located in the reservoir. Because of underlying cavernous limestone beneath the reservoir, the water level is considerably below the normal design pool. There are two emergency spillways. The left emergency spillway is an open channel spillway which is a low point in natural ground. The right emergency spillway is an open channel cut into natural ground. The spillways will pass the PMF without overtopping; therefore, the spillways are adjudged as adequate. The visual inspection revealed no apparent problems or remedial measures in need of immediate attention.

National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report

Download National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 39 pages
Book Rating : 4.:/5 (227 download)

DOWNLOAD NOW!


Book Synopsis National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report by : James A. Walsh

Download or read book National Dam Safety Program. Lakeland Dam (Inventory Number VA 03111), James River Basin, Campbell County, Virginia. Phase I Inspection Report written by James A. Walsh and published by . This book was released on 1980 with total page 39 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Lakeland Dam is an earthfill structure approximately 550 feet long and 26.6 feet high. The dam is owned and maintained by the Lakeland Homeowners Association. The dam is classified as a small dam with a significant hazard classification. The principal spillway is an 18-inch corrugated metal pipe drop-inlet that passes at low level through the dam. The emergency spillway is an open channel earthen spillway located at the right abutment. The reservoir is used for recreation. Based on criteria established by the Department of the Army, Office of the Chief of Engineers (OCE), the Spillway Design Flood (SDF) is the 1/2 PMF. The emergency spillway will pass the SDF without overtopping the dam. Therefore, the emergency spillway is adjudged as adequate. The visual inspection revealed no apparent problems and there are no immediate needs for remedial measures. Maintenance is performed by the owners. However, there is no regular maintenance operations plan or warning system. It is recommended that the services of a qualified geotechnical engineering firm be engaged to perform a stability check of the dam. This should be completed within 12 months. It is also recommended that a regular maintenance and operations program be instituted with provisions for accurate records of all maintenance performed, and that a warning system be established.