FHWA Project R05 IAP Funded Project Case Study

Download FHWA Project R05 IAP Funded Project Case Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 30 pages
Book Rating : 4.:/5 (14 download)

DOWNLOAD NOW!


Book Synopsis FHWA Project R05 IAP Funded Project Case Study by : Shiraz D. Tayabji

Download or read book FHWA Project R05 IAP Funded Project Case Study written by Shiraz D. Tayabji and published by . This book was released on 2016 with total page 30 pages. Available in PDF, EPUB and Kindle. Book excerpt: The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help state highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On March 28, 2014, as part of round 3 of the IAP, four lead adopters were selected to receive financial support from the Federal Highway Administration for implementation of PCP technology. Kansas Department of Transportation, one of the agencies selected as a lead adopter, received an award of 300,000 [dollars] to help offset the cost of the implementation of PCP technology in the State. This case study report provides details of the 2015 PCP use for rehabilitation of two distressed concrete pavement intersections and a bridge approach section along US 73 in Leavenworth, Kansas.

FHWA Project R05 IAP Funded Project Case Study

Download FHWA Project R05 IAP Funded Project Case Study PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 35 pages
Book Rating : 4.:/5 (14 download)

DOWNLOAD NOW!


Book Synopsis FHWA Project R05 IAP Funded Project Case Study by : Shiraz D. Tayabji

Download or read book FHWA Project R05 IAP Funded Project Case Study written by Shiraz D. Tayabji and published by . This book was released on 2016 with total page 35 pages. Available in PDF, EPUB and Kindle. Book excerpt: The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies, including Caltrans, Illinois Tollway, and the New Jersey, New York, and Utah State Departments of Transportation, have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used on concrete pavements for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. The use of PCP on asphalt pavements includes the replacement of ramps, intersections and bus pads. The Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State DOTs, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On March 28, 2014, the Federal Highway Administration—in partnership with the American Association of State Highway and Transportation Officials—announced the selection of several transportation agencies receiving implementation and technical assistance awards as part of round 3 of the SHRP2 IAP. The Texas Department of Transportation, one of the agencies selected as a lead adopter of Project R05 technology, received an award of 300,000 [dollars] to help offset the cost of constructing a PCP project. This case study report provides details of the 2016 PCP use for rehabilitation of a distressed asphalt concrete pavement at the intersection of Route 97 and Route 72 in McMullen/LaSalle County, Texas.

FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project

Download FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 35 pages
Book Rating : 4.:/5 (14 download)

DOWNLOAD NOW!


Book Synopsis FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project by : Shiraz D. Tayabji

Download or read book FHWA Project R05 IAP Funded Project Case Study : New Britain Bus Pads Precase Concrete Pavement Demonstration Project written by Shiraz D. Tayabji and published by . This book was released on 2016 with total page 35 pages. Available in PDF, EPUB and Kindle. Book excerpt: The production use of precast concrete pavement (PCP) has come a long way over the last 15 years. The technology is gaining wider acceptance in the U.S. for rapid repair and rehabilitation of concrete pavements as well as for heavily trafficked asphalt concrete pavements and intersections. Several U.S. highway agencies have implemented the PCP technology, and other agencies have constructed demonstration projects. In the U.S., the PCP technology is being used for intermittent repairs (full-depth joint repairs or full panel replacement) and for continuous applications (longer length/wider area rehabilitation) with service life expectations of at least 20 years for intermittent repairs and at least 40 years for continuous applications, without significant future corrective treatment. Strategic Highway Research Program 2 (SHRP2) Project R05 was conducted from 2008 to 2012 to develop technical information and guidelines that would encourage the rapid and successful adoption of PCP technology. In 2013, the SHRP2 Implementation Assistance Program (IAP) was created to help State highway agencies, metropolitan planning organizations, and other interested organizations deploy SHRP2-developed products to deliver more efficient, costeffective solutions to meet the complex challenges facing transportation agencies. On August 7, 2015, the Federal Highway Administration—in partnership with the American Association of State Highway and Transportation Officials—announced the selection of 21 transportation agencies receiving implementation and technical assistance awards as part of Round 6 of the SHRP2 IAP. The Connecticut Department of Transportation, one of the agencies selected as a lead adopter of Project R05 technology, received an award of 150,000 [dollars] to help offset the cost of constructing a PCP project. Connecticut also received user-incentive funds, in the amount of 75,000 [dollars], for the development of plans, specifications, and estimates (PS&E) related technology transfer activities leading to agencywide adoption of PCP technology. This case study report provides details of the 2016 PCP use for rehabilitation of two distressed asphalt concrete bus pads along a section of the busway of CTfastrak, a bus rapid transit system in New Britain, Connecticut.

Riegle Community Development and Regulatory Improvement Act of 1994

Download Riegle Community Development and Regulatory Improvement Act of 1994 PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 136 pages
Book Rating : 4.3/5 (121 download)

DOWNLOAD NOW!


Book Synopsis Riegle Community Development and Regulatory Improvement Act of 1994 by : United States

Download or read book Riegle Community Development and Regulatory Improvement Act of 1994 written by United States and published by . This book was released on 1994 with total page 136 pages. Available in PDF, EPUB and Kindle. Book excerpt:

Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition)

Download Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition) PDF Online Free

Author :
Publisher : Createspace Independent Publishing Platform
ISBN 13 : 9781727574111
Total Pages : 26 pages
Book Rating : 4.5/5 (741 download)

DOWNLOAD NOW!


Book Synopsis Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition) by : The Law The Law Library

Download or read book Suspension of Community Eligibility (Us Federal Emergency Management Agency Regulation) (Fema) (2018 Edition) written by The Law The Law Library and published by Createspace Independent Publishing Platform. This book was released on 2018-09-23 with total page 26 pages. Available in PDF, EPUB and Kindle. Book excerpt: Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition) The Law Library presents the complete text of the Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition). Updated as of May 29, 2018 This rule identifies communities, where the sale of flood insurance has been authorized under the National Flood Insurance Program (NFIP), that are scheduled for suspension on the effective dates listed within this rule because of noncompliance with the floodplain management requirements of the program. If the Federal Emergency Management Agency (FEMA) receives documentation that the community has adopted the required floodplain management measures prior to the effective suspension date given in this rule, the suspension will not occur and a notice of this will be provided by publication in the Federal Register on a subsequent date. This book contains: - The complete text of the Suspension of Community Eligibility (US Federal Emergency Management Agency Regulation) (FEMA) (2018 Edition) - A table of contents with the page number of each section

Enroute Supplement Australia

Download Enroute Supplement Australia PDF Online Free

Author :
Publisher :
ISBN 13 : 9780957899124
Total Pages : 292 pages
Book Rating : 4.8/5 (991 download)

DOWNLOAD NOW!


Book Synopsis Enroute Supplement Australia by : Airservices Australia Publications Centre

Download or read book Enroute Supplement Australia written by Airservices Australia Publications Centre and published by . This book was released on 2001 with total page 292 pages. Available in PDF, EPUB and Kindle. Book excerpt:

The Regulatory Flexibility Act

Download The Regulatory Flexibility Act PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 44 pages
Book Rating : 4.3/5 ( download)

DOWNLOAD NOW!


Book Synopsis The Regulatory Flexibility Act by :

Download or read book The Regulatory Flexibility Act written by and published by . This book was released on 1982 with total page 44 pages. Available in PDF, EPUB and Kindle. Book excerpt: