12 GeV Upgrade Project - Cryomodule Production

Download 12 GeV Upgrade Project - Cryomodule Production PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis 12 GeV Upgrade Project - Cryomodule Production by :

Download or read book 12 GeV Upgrade Project - Cryomodule Production written by and published by . This book was released on 2012 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project

Download Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 3 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project by :

Download or read book Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project written by and published by . This book was released on 2012 with total page 3 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the project is a doubling of the available beam energy of CEBAF from 6 GeV to 12 GeV. This increase in beam energy will be due primarily to the construction and installation of ten "C100" cryomodules in the CEBAF linacs. The C100 cryomodules are designed to deliver an average 108 MV each from a string of eight seven-cell, electropolished superconducting RF cavities operating at an average accelerating gradient of 19.2 MV/m. The new cryomodules fit in the same available linac space as the original CEBAF 20 MV cryomodules. Cryomodule production started in September 2010. Initial acceptance testing started in June 2011. The first two C100 cryomodules were installed and tested from August 2011 through October 2011, and successfully operated during the last period of the CEBAF 6 GeV era, which ended in May 2012. This paper will present the results of acceptance testing and commissioning of the C100 style cryomodules to date.

Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade

Download Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade by :

Download or read book Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2013 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is nearing completion of an energy upgrade from 6 to 12 GeV. An integral part of the upgrade is the addition of ten new cryomodules, each consisting of eight seven-cell superconducting radio-frequency (SRF) cavities. An average performance of 100+MV of acceleration per cryomodule is needed to achieve the 12 GeV beam energy goal. The production methodology was for industry to provide and deliver the major components to Jefferson Lab, where they were tested and assembled into cryomodules. The production process begins with an inspection upon receiving of all major components followed by individual performance qualification testing. The SRF cavities received their final chemical processing and cleaning at Jefferson Lab. The qualified components along with all associated hardware and instrumentation are assembled, tested, installed into CEBAF and run through an integrated system checkout in preparation for beam operations. The production process is complete and one of the first completed cryomodules has successfully produced 108 MV of acceleration with a linac beam current of 465?A.

CEBAF Upgrade

Download CEBAF Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 8 pages
Book Rating : 4.:/5 (16 download)

DOWNLOAD NOW!


Book Synopsis CEBAF Upgrade by :

Download or read book CEBAF Upgrade written by and published by . This book was released on 2014 with total page 8 pages. Available in PDF, EPUB and Kindle. Book excerpt: The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules

Download Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : 4 pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules by :

Download or read book Vibration Response Testing of the CEBAF 12GeV Upgrade Cryomodules written by and published by . This book was released on 2012 with total page 4 pages. Available in PDF, EPUB and Kindle. Book excerpt: The CEBAF 12 GeV upgrade project includes 80 new 7-cell cavities to form 10 cryomodules. These cryomodules were tested during production to characterize their microphonic response in situ. For several early cryomodules, detailed (vibration) modal studies of the cryomodule string were performed during the assembly process to identify the structural contributors to the measured cryomodule microphonic response. Structural modifications were then modelled, implemented, and verified by subsequent modal testing and in-situ microphonic response testing. Interim and latest results from this multi-stage process will be reviewed.

Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade

Download Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade by :

Download or read book Improved Prototype Cryomodule for the CEBAF 12 GeV Upgrade written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: In order to provide a higher performance building block cryomodule for the CEBAF 12 GeV upgrade, modifications have been made to the design of the Upgrade Cryomodule. The prototype cryomodule will be completed in 2004 and be installed for operation in CEBAF. Design changes enable the use of higher gradient cavities to achieve greater than 100 MV per cryomodule while not exceeding the budgeted cryogenic load of 300 W during steady-state operation.

Superconducting Radiofrequency Technology for Accelerators

Download Superconducting Radiofrequency Technology for Accelerators PDF Online Free

Author :
Publisher : John Wiley & Sons
ISBN 13 : 3527414096
Total Pages : 405 pages
Book Rating : 4.5/5 (274 download)

DOWNLOAD NOW!


Book Synopsis Superconducting Radiofrequency Technology for Accelerators by : Hasan Padamsee

Download or read book Superconducting Radiofrequency Technology for Accelerators written by Hasan Padamsee and published by John Wiley & Sons. This book was released on 2023-05-15 with total page 405 pages. Available in PDF, EPUB and Kindle. Book excerpt: Superconducting Radiofrequency Technology for Accelerators Single source reference enabling readers to understand and master state-of-the-art accelerator technology Superconducting Radiofrequency Technology for Accelerators provides a quick yet thorough overview of the key technologies for current and future accelerators, including those projected to enable breakthrough developments in materials science, nuclear and astrophysics, high energy physics, neutrino research and quantum computing. The work is divided into three sections. The first part provides a review of RF superconductivity basics, the second covers new techniques such as nitrogen doping, nitrogen infusion, oxide-free niobium, new surface treatments, and magnetic flux expulsion, high field Q slope, complemented by discussions of the physics of the improvements stemming from diagnostic techniques and surface analysis as well as from theory. The third part reviews the on-going applications of RF superconductivity in already operational facilities and those under construction such as light sources, proton accelerators, neutron and neutrino sources, ion accelerators, and crab cavity facilities. The third part discusses planned accelerator projects such as the International Linear Collider, the Future Circular Collider, the Chinese Electron Positron Collider, and the Proton Improvement Plan-III facility at Fermilab as well as exciting new developments in quantum computing using superconducting niobium cavities. Written by the leading expert in the field of radiofrequency superconductivity, Superconducting Radiofrequency Technology for Accelerators covers other sample topics such as: Fabrication and processing on Nb-based SRF structures, covering cavity fabrication, preparation, and a decade of progress in the field SRF physics, covering zero DC resistance, the Meissner effect, surface resistance and surface impedance in RF fields, and non-local response of supercurrent N-doping and residual resistance, covering trapped DC flux losses, hydride losses, and tunneling measurements Theories for anti-Q-slope, covering the Xiao theory, the Gurevich theory, non-equilibrium superconductivity, and two fluid model based on weak defects Superconducting Radiofrequency Technology for Accelerators is an essential reference for high energy physicists, power engineers, and electrical engineers who want to understand the latest developments of accelerator technology and be able to harness it to further research interest and practical applications.

Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

Download Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade by : G. Davis

Download or read book Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade written by G. Davis and published by . This book was released on 2005 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup.

Cryostat Design

Download Cryostat Design PDF Online Free

Author :
Publisher : Springer
ISBN 13 : 3319311506
Total Pages : 293 pages
Book Rating : 4.3/5 (193 download)

DOWNLOAD NOW!


Book Synopsis Cryostat Design by : J.G. Weisend II

Download or read book Cryostat Design written by J.G. Weisend II and published by Springer. This book was released on 2016-08-12 with total page 293 pages. Available in PDF, EPUB and Kindle. Book excerpt: This book enables the reader to learn the fundamental and applied aspects of practical cryostat design by examining previous design choices and resulting cryostat performance. Through a series of extended case studies the book presents an overview of existing cryostat design covering a wide range of cryostat types and applications, including the magnet cryostats that comprise the majority of the Large Hadron Collider at CERN, space-borne cryostats containing sensors operating below 1 K, and large cryogenic liquid storage vessels. It starts with an introductory section on the principles of cryostat design including practical data and equations. This section is followed by a series of case studies on existing cryostats, describing the specific requirements of the cryostat, the challenges involved and the design choices made along with the resulting performance of the cryostat. The cryostat examples used in the studies are chosen to cover a broad range of cryostat applications and the authors of each case are leading experts in the field, most of whom participated in the design of the cryostats being described. The concluding chapter offers an overview of lessons learned and summarises some key hints and tips for practical cryostat design. The book will help the reader to expand their knowledge of many disciplines required for good cryostat design, including the cryogenic properties of materials, heat transfer and thermal insulation, instrumentation, safety, structures and seals.

Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab

Download Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab by :

Download or read book Overview and Status of the 12 GeV Cryogenic System Upgrade At Jlab written by and published by . This book was released on 2010 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: As part of the planned Jefferson Laboratory's electron accelerator (CEBAF) power upgrade, ten additional superconducting RF cryomodules will be added to its accelerator linacs. Although physically the same size as each of the original 40 linac cryomodules, each new cryomodule will have approximately 4 times the acceleration power. To support the additional cryomodule heat loads generated, the existing 2K, 4600W Central Helium Liquefier (CHL) plant capacity will be doubled to a total of 9200W at 2K plus 24,000W at 35K for shield loads. The specified base line process cycle has been modeled after the laboratory s "Ganni Helium Cycle" process technology. In addition, a fourth physics experimental "Hall D" will be constructed which will have an additional stand alone 200W at 4K helium cryogenic plant. In October of 2008, Jefferson Laboratory (JLab) received approval for project "Critical Decision 3" construction phase status from the US Department of Energy.

Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine

Download Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (8 download)

DOWNLOAD NOW!


Book Synopsis Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine by :

Download or read book Correspondance officielle échangée entre les Gouvernements du Mexique et des Etats-Unis d'Amérique au sujet des deux lois réglementant le paragraphe premier de l'article 27 de la Constitution mexicaine written by and published by . This book was released on 1928 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt:

Development of a Cryomodule for the CEBAF Upgrade

Download Development of a Cryomodule for the CEBAF Upgrade PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis Development of a Cryomodule for the CEBAF Upgrade by :

Download or read book Development of a Cryomodule for the CEBAF Upgrade written by and published by . This book was released on 1999 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Long-term plans for the CEBAF at Jefferson Lab call for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of those plans, an Upgrade Cryomodule, capable of providing more than three times the voltage of the original CEBAF cryomodule specification within the same length, is under development. In particular, this requires the development of superconducting cavities capable of consistently operating at gradients above 12 MV/m and Q(approximately)101°, new frequency tuners with excellent resolution, and cavity control systems.

Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes

Download Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes by : T. Powers

Download or read book Production and Performance of the CEBAF Upgrade Cryomodule Intermediate Prototypes written by T. Powers and published by . This book was released on 2004 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: We have installed two new cryomodules, one in the nuclear physics accelerator (CEBAF) and the other in the Free Electron Laser (FEL) of Jefferson Lab. The new cryomodules consist of 7-cell cavities with the original CEBAF cell shape and were designed to deliver gradients of 70 MV/module. Several significant design innovations were demonstrated in these cryomodules. This paper describes the production procedures, the performance characteristics of these cavities in vertical tests, results of tests in the new cryomodule test facility (CMTF) as well as the commissioning in the CEBAF tunnel and FEL. Performances and limitations after installation in the accelerators are discussed in this paper along with improvements proposed for future cryomodules.

The 12 GeV Upgrade at Jefferson Lab

Download The 12 GeV Upgrade at Jefferson Lab PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis The 12 GeV Upgrade at Jefferson Lab by :

Download or read book The 12 GeV Upgrade at Jefferson Lab written by and published by . This book was released on 2002 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: There has been a remarkable fruitful evolution of our picture of the behavior of strongly interacting matter during the almost two decades that have passed since the parameters of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab were defined. These advances have revealed important new experimental questions best addressed by a CEBAF-class machine at higher energy. Fortunately, favorable technical developments coupled with foresight in the design of the facility make it feasible to triple (double) CEBAF's design (achieved) beam energy from 4 (6) GeV to 12 GeV, in a cost-effective manner: the Upgrade can be realized for about 15% of the cost of the initial facility. This Upgrade would enable the worldwide community to greatly expand its physics horizons. In addition to in general improving the figure of merit and momentum transfer range of the present Jefferson Lab physics program, raising the energy of the accelerator to 12 GeV opens up two main new areas of physics: (1) It allows direct exploration of the quark-gluon structure of hadrons and nuclei in the ''valence quark region''. It is known that inclusive electron scattering at the high momentum and energy transfers available at 12 GeV is governed by elementary interactions with quarks and, indirectly, gluons. The original CEBAF energy is not adequate to study this critical region, while with continuous 12 GeV beams one can cleanly access the entire ''valence quark region'' and exploit the newly discovered Generalized Parton Distributions. In addition, a 12-GeV Jefferson Lab can essentially complete the studies of the transition from hadronic to quark-gluon degrees of freedom. (2) It allows crossing the threshold above which the origins of quark confinement can be investigated. Specifically, 12 GeV will enable the production of certain ''exotic'' mesons. Whereas in the QCD region of asymptotic freedom ample evidence for the role of gluons exist through the observation of gluon jets, direct evidence for the role of gluons in the QCD confinement region is still missing. Spectroscopy of light ''exotic'' mesons, with glue as essential part of their valence structure, would provide such essential evidence. In addition, with 12 GeV one crosses the threshold for charm production. The nearly final draft of the recent NSAC long-range plan states the 12 GeV Upgrade as one of three construction recommendations: ''We strongly recommend the upgrade of CEBAF at Jefferson Laboratory to 12 GeV as soon as possible. The 12 GeV upgrade of the unique CEBAF facility is critical for our continued leadership in the experimental study of hadronic matter.'' Presently, the status of the 12 GeV Upgrade is that the laboratory is waiting for ''CD-0'', a ''Statement of Mission Need'', approval by DOE. Conceptual Design Reports for both accelerator upgrades and the various experimental upgrades (Halls A, B, C, and D) are anticipated by September 15, 2002.

Pressure Safety of JLAB 12GeV Upgrade Cryomodule

Download Pressure Safety of JLAB 12GeV Upgrade Cryomodule PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (946 download)

DOWNLOAD NOW!


Book Synopsis Pressure Safety of JLAB 12GeV Upgrade Cryomodule by :

Download or read book Pressure Safety of JLAB 12GeV Upgrade Cryomodule written by and published by . This book was released on 2009 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: This paper reviews pressure safety considerations, per the US Department of Energy (DOE) 10CFR851 Final Rule [1], which are being implemented during construction of the 100 Megavolt Cryomodule (C100 CM) for Jefferson Lab's 12 GeV Upgrade Project. The C100 CM contains several essential subsystems that require pressure safety measures: piping in the supply and return end cans, piping in the thermal shield and the helium headers, the helium vessel assembly which includes high RRR niobium cavities, the end cans, and the vacuum vessel. Due to the vessel sizes and pressure ranges, applicable national consensus code rules are applied. When national consensus codes are not applicable, equivalent design and fabrication approaches are identified and implemented. Considerations for design, material qualification, fabrication, inspection and examination are summarized. In addition, JLAB's methodologies for implementation of the 10 CFR 851 requirements are described.

SNS Cryomodule Production Progress & Key Lessons Learned

Download SNS Cryomodule Production Progress & Key Lessons Learned PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (684 download)

DOWNLOAD NOW!


Book Synopsis SNS Cryomodule Production Progress & Key Lessons Learned by :

Download or read book SNS Cryomodule Production Progress & Key Lessons Learned written by and published by . This book was released on 2003 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Jefferson Lab has been commissioned to design and manufacture one prototype, eleven-.61 Beta and twelve-.81 Beta cryomodules for the Spallation Neutron Source project. The production process is up and running with half of the .61 Beta cryomodules complete to date. This paper will present an overview of the beginning of production, with an emphasis on key lessons learned, that have been used to refine cryomodule production.

Upgrading the CEBAF Accelerator to 12 GeV.

Download Upgrading the CEBAF Accelerator to 12 GeV. PDF Online Free

Author :
Publisher :
ISBN 13 :
Total Pages : pages
Book Rating : 4.:/5 (316 download)

DOWNLOAD NOW!


Book Synopsis Upgrading the CEBAF Accelerator to 12 GeV. by : Leigh Harwood

Download or read book Upgrading the CEBAF Accelerator to 12 GeV. written by Leigh Harwood and published by . This book was released on 2006 with total page pages. Available in PDF, EPUB and Kindle. Book excerpt: Jefferson Lab is preparing to upgrade its 6 GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12 GeV. The doubled energy will significantly extend research reach of the three existing experimental Halls A, B and C, and the upgrade will add scientific capability, with a newly constructed hall, Hall D. Areas of special initial interest are reactions at high xBjorken, GPD's and exotic hybrid mesons. The present linacs will have their acceleration roughly doubled through the addition of 10 new cryomodules which will perform at {approx}5 times the original specification for CEBAF. The cryogenics plant will be roughly doubled and new rf systems will be installed for the new cryomodules. The beam transport system will strongly leverage existing hardware but must be enhanced with new power supplies, one new recirculation arc, and a beamline to the new Hall D.A brief description of the scope for the various accelerator subsystems will be given as well as the status of the project as a whole.